PRESENTATION
AFOHS DETT. MALIR
Prepared & Presented by: M. Sohail Azeem
SEQUENCE
• INTRODUCTION
• RECOMMENDATION FOR COST
CURTAILMENT
• RECOMMENDATION FOR
IMPROVEMENT
• CONCLUSION
SDH
• TOTAL AREA 350
SQ. YARDS
• TOTAL COVERED
AREA 3000 SFT.
• RATE PER SDH
Rs.12,20,000.00
IH
• TOTAL AREA 500
SQ. YARDS
• TOTAL COVERED
AREA 4000 SFT.
• RATE PER I H
Rs.15,50,000.00/=
COST CURTAILMENT
RCC PIPE
• 01 X RCC PIPE LINE OF 6” DIAMETER
MAY BE DELETED
• TOTAL PIPE IN USE
32 METER
• RATE
Rs.130.00...
MAIN HOLES / C.I. COVER
• IF WE DELETE ONE RCC PIPELINE,
05 X MAIN HOLES AND 05 X
C.I.COVER WOULD ALSO BE
DELETED.
• COST ...
SEPTIC TANK

• SEPTIC TANK MAY
BE DELETED FROM
THE DESIGN
• COST
Rs.10,000
STEEL RAILING
•
•
•
•
•
•
•

STEEL RAILING OF BACK SIDE
TERRACE MAY BE DELETED
WALL OF 3’-6’’ MAY BE RAISED
INSTEAD
TOTAL ...
PIPE RAILING
•

•

BACK SIDE WALL OF FRONT
TERRACE HAS A PIPE RAILING
MAY BE REPLACED WITH
BLOCK MASONARY
RATE OF RAILING ...
CLAD STONE
•
•

CLAD STONE MAY BE REPLACED
WITH GRAFFIATTO
RATE OF CLAD STONE RS.30/-SFT

•
•
•

RATE OF GRAFFIATTO RS.12/...
M.S. SHEET / G.I.
• M S SHEET/ G I OF 16 GAUGE MAY BE
REPLACED WITH 18 GAUGE DOOR
FRAMES
• RATE OF 16 GAUGE
Rs.75/=RFT
• R...
WOODEN BIDDING
•

•

DEODAR WOOD IS USED FOR
BIDDING/GOLAS
MAY BE REPLACED WITH
PERTAL/GOLDEN TEAK
RATE OF DEODAR WOOD RS....
STAIR RAILING
.
•

WOODEN STAIR RAILING MAY BE
REPLACED WITH ALLUMINIUM
RAILING
RATE OF WOOD
RS.45O/-RFT

•

RATE OF ALLUM...
UPVC PIPE
•
•

4’’ DIA UPVC PIPES MAY BE
REPLACED WITH 3’’
RATE OF 4’’ DIA PIPE RS.145/-R.M.

•

RATE OF 3’’ DIA PIPE RS.1...
UPVC PIPE(RAIN WATER)
• TOTAL OF 06xUPVC PIPES
ARE LAID FROM THE ROOF
MAY BE DELETED
• 3’’ DIA UPVC PIPES OF THE
TWO BATH ...
RECOMMENDATIONS FOR IMPROVEMENT
• CAR PORCH ROOF OF SDH MAY BE INCREASED IN
HEIGHT UPTO DRAWING ROOM SLAB
• WOODEN STAIR R...
CONCLUSION
• THE RECOMMENDATIONS MADE IF
INCORPORATED WILL SAVE APPROX.
Rs 85000/= PER HOUSE
Upcoming SlideShare
Loading in …5
×

Housing Project

495 views
305 views

Published on

Housing Project Presentation, Cost Saving recommendations,

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
495
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Housing Project

  1. 1. PRESENTATION AFOHS DETT. MALIR Prepared & Presented by: M. Sohail Azeem
  2. 2. SEQUENCE • INTRODUCTION • RECOMMENDATION FOR COST CURTAILMENT • RECOMMENDATION FOR IMPROVEMENT • CONCLUSION
  3. 3. SDH • TOTAL AREA 350 SQ. YARDS • TOTAL COVERED AREA 3000 SFT. • RATE PER SDH Rs.12,20,000.00
  4. 4. IH • TOTAL AREA 500 SQ. YARDS • TOTAL COVERED AREA 4000 SFT. • RATE PER I H Rs.15,50,000.00/=
  5. 5. COST CURTAILMENT RCC PIPE • 01 X RCC PIPE LINE OF 6” DIAMETER MAY BE DELETED • TOTAL PIPE IN USE 32 METER • RATE Rs.130.00 PER METER • TOTAL COST Rs.4,160.00 • TOTAL SAVING Rs.2,080.00
  6. 6. MAIN HOLES / C.I. COVER • IF WE DELETE ONE RCC PIPELINE, 05 X MAIN HOLES AND 05 X C.I.COVER WOULD ALSO BE DELETED. • COST OF 01XMAIN HOLE Rs.1500.00 • COST OF 01XC.I.COVER Rs.500.00 • TOTAL SAVING Rs.10,000.00
  7. 7. SEPTIC TANK • SEPTIC TANK MAY BE DELETED FROM THE DESIGN • COST Rs.10,000
  8. 8. STEEL RAILING • • • • • • • STEEL RAILING OF BACK SIDE TERRACE MAY BE DELETED WALL OF 3’-6’’ MAY BE RAISED INSTEAD TOTAL RAILING IN USE 25 RFT RATE Rs 400/= RFT TOTAL COST Rs 10,000/= BLOCK MASONARY Rs.2000/=C.M TOTAL COST(1.5 CUM) RS.3000/= DIFFERENCE OF COST RS.7000/=
  9. 9. PIPE RAILING • • BACK SIDE WALL OF FRONT TERRACE HAS A PIPE RAILING MAY BE REPLACED WITH BLOCK MASONARY RATE OF RAILING RS.500/- RFT • COST ( 5 RFT) • • BLOCK MASONARY Rs.670/COST SAVING RS.1830/- • RS.2500/-
  10. 10. CLAD STONE • • CLAD STONE MAY BE REPLACED WITH GRAFFIATTO RATE OF CLAD STONE RS.30/-SFT • • • RATE OF GRAFFIATTO RS.12/- SFT TOTAL AREA 500 SFT COST OF CLAD STONE RS.15000/- • COST OF GRAFFIATTO RS.6000/- • COST SAVING RS.9000/=
  11. 11. M.S. SHEET / G.I. • M S SHEET/ G I OF 16 GAUGE MAY BE REPLACED WITH 18 GAUGE DOOR FRAMES • RATE OF 16 GAUGE Rs.75/=RFT • RATE OF 18 GAUGE Rs.65/=RFT • TOTAL USAGE 300 RFT • COST OF 16 GAUGE Rs. 22500/= • COST OF 18 GAUGE Rs 19500/= • COST SAVING Rs 3000/=
  12. 12. WOODEN BIDDING • • DEODAR WOOD IS USED FOR BIDDING/GOLAS MAY BE REPLACED WITH PERTAL/GOLDEN TEAK RATE OF DEODAR WOOD RS.2500/- CFT • RATE OF PERTAL • TOTAL REQUIREMENT • COST OF DEODAR RS.42000/- • COST OF PERTAL RS.12000/- • COST SAVING RS.30,000/- • RS.700/- CFT 17 CFT
  13. 13. STAIR RAILING . • WOODEN STAIR RAILING MAY BE REPLACED WITH ALLUMINIUM RAILING RATE OF WOOD RS.45O/-RFT • RATE OF ALLUMINIUM RS.250/-RFT • TOTAL REQUIREMENT 30 RFT • COST OF WOOD • COST OF ALLUMINIUM RS.7500/- • COST SAVING RS.13500/- RS.6000/-
  14. 14. UPVC PIPE • • 4’’ DIA UPVC PIPES MAY BE REPLACED WITH 3’’ RATE OF 4’’ DIA PIPE RS.145/-R.M. • RATE OF 3’’ DIA PIPE RS.100/-R.M. • TOTAL CONSUMPTION • COST OF 4’’ DIA PIPE RS.5220/- • COST OF 3’’ DIA PIPE RS.3600/- • COST SAVING RS.1620/- 36 R.M.
  15. 15. UPVC PIPE(RAIN WATER) • TOTAL OF 06xUPVC PIPES ARE LAID FROM THE ROOF MAY BE DELETED • 3’’ DIA UPVC PIPES OF THE TWO BATH ROOMS ON THE FIRST FLOOR MAY BE EXTENDED UPTO ROOF AND AN ELBOW MAY BE FIXED FOR THE RAIN WATER • COST SAVING RS.4400/-
  16. 16. RECOMMENDATIONS FOR IMPROVEMENT • CAR PORCH ROOF OF SDH MAY BE INCREASED IN HEIGHT UPTO DRAWING ROOM SLAB • WOODEN STAIR RAILING MAY BE REPLACED WITH ALLUMINIUM • GRAFFIATTO OF DIFFERENT SHADES MAY BE USED FOR FRONT ELEVATION IN CASE STONE CLADDING IS DELETED • SEPTIC TANK IN SDH MAY BE SHIFTED OUT SIDE THE BOUNDARY WALL (IF IT IS NOT DELETED)
  17. 17. CONCLUSION • THE RECOMMENDATIONS MADE IF INCORPORATED WILL SAVE APPROX. Rs 85000/= PER HOUSE

×