MRP Controlling System
• Origin of Computerized Organizational Systems.
• 1960’s:Inventory Control System.
• 1970’s:MRP: Material Requirement Planning.
• 1980’s:MRP2: MRP & Distribution
• 1990’s:MRP2 >ERP with introduction of other business functions >
CRM.
• Today: Web Enabled ERP-Connecting ERP Externally.
What is MRP?
• Computerized Inventory Control
• Production Planning System
• Management Information System
• Manufacturing Control System
What can MRP do?
• Reduce Inventory Levels
• Reduce Component Shortages
• Improve Shipping Performance
• Improve Customer Service
• Improve Productivity
• Simplified and Accurate Scheduling
• Improve Communication
• Improve Plant Efficiency
• Reduction in Excess Inventory
• Reduce Purchasing Cost
• Improve Production Schedules
• Reduce Manufacturing Cost
• Reduce Lead Times
• Less Scrap and Rework
• Higher Production Quality
• Reduce Overtime
• Improve Supply Schedules
• Improve Calculation of Material
Requirements
• Improve Competitive Position
AdvantagesofMRPImplementation
• Process & Work Flow Integration
• Efficient utilization of resources.
• Ability to share Organizational Data.
• Improves Efficiency and Productivity levels.
• Lower Costs.
• Better customer services and satisfaction.
Presentation on MRP Work flow
ThreeBasicStepsofMRP
• Identifying Requirements (Quantity on hand, quantity on purchase orders,
quantity in/or planned for manufacturing, Quantity forecasted.)
• Running MRP – Creating the Suggestions(Critical Items, Expedite
Items, Delay Items)
• Firming the Suggestions
RunningMRPCreatingSuggestions
• At the end of each day, the MRP system will be run to identify
items as critical, expedite, or delay. The MRP system will
suggest if you need to order more of a certain material by
classifying into the three categories.
1. Critical items are items of immediate importance that should
be taken care of right away.
2. Expedite items are items that need to be sped up so that it is
completed in less than the normal lead time.
3. Delay items are item that are not of vital importance and
can be delayed for the benefit of other items.
MRPInputs
Leadtimeoffsetting,AllocationandActionsofMRPPlanner
• Gross to net explosion tells us how many of each component are
needed for a finished product.
• The WHEN they are needed is the Lead Time Offset
• Prior to order launching, an availability check should be done for
the necessary components.
• After this Order should be locked for further execution.
• Release orders
• Reschedule due dates.
• Analyze and update system planning factors for the part
numbers under ones control.
• Reconcile errors and inconsistencies
• Find key problem areas.
• Use the system to solve critical material shortages.
• Indicate where enhancements would make job easier.
Extensions of MRP
 MRP II
 Closed-Loop MRP
 MRP system provides input to the capacity plan, MPS, and
production planning process
 Capacity Planning
 MRP system generates a load report which details capacity
requirements
 This is used to drive the capacity planning process
 Changes pass back through the MRP system for rescheduling
Capacity Planning
• Feedback from the MRP
system
• Load reports show
resource requirements
for work centers
• Work can be moved
between work centers to
smooth the load or bring
it within capacity
Smoothing Tactics
1. Overlapping
 Sends part of the work to
following operations before the
entire lot is complete
 Reduces lead time
2. Operations splitting
 Sends the lot to two different
machines for the same operation
 Shorter throughput time but
increased setup costs
3. Order or lot splitting
 Breaking up the order into smaller
lots and running part earlier (or
later) in the schedule
MRP Outputs
Primary Reports
• Planned Orders – schedule
indicating the amount and
timing of future orders
• Order Releases –
Authorization for the
execution of planned
orders
• Changes – revisions of due
dates or order quantities,
or cancellation of orders.
• Manufacturing Orders
• Purchasing Orders
Secondary Reports
• Performance-control
reports – Evaluation of
system operation, including
deviations from plans and
cost information
• Planning reports – Data
useful for assessing future
material requirements
• Exception Reports – Data
on major discrepancies
encountered
Hubbell Lighting Case
Before MRP Implementation
• Less than 75% of orders
completed on time
After MRP Implementation
• 97% of orders
completed on time
• 3% of orders completed
with 2 to 4 days after
due date.
Summary of MRP
MRP is a…..Computerized Inventory Control
Production Planning System
that…..
Schedules Component Items as Needed
which will…..
Track Inventory and…..
Help you in many other aspects of business.
 Reschedule Due Dates of Open Orders as
Needed.
 Reconcile Orders and Find Causes.
 Solve Shortages by Expediting.
 Strong Coordination with all relevant
departments.

More Related Content

What's hot

Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyHaider Alkaisy
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planningAmalia Syafitri
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesvideoaakash15
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aRai University
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPTom Matys
 
CPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleCPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleStephan Pire
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrpArisha Jamil
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
Chapter 4: Production and Supply Chain Management Information Systems
Chapter 4: Production and Supply Chain Management Information SystemsChapter 4: Production and Supply Chain Management Information Systems
Chapter 4: Production and Supply Chain Management Information SystemsQuang Ngoc
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 

What's hot (20)

Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
 
15 mrp
15 mrp15 mrp
15 mrp
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
MRP,MRP-II,JIT
MRP,MRP-II,JITMRP,MRP-II,JIT
MRP,MRP-II,JIT
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp a
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
CPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleCPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production Schedule
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrp
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
Mrp
MrpMrp
Mrp
 
MRP Overview
MRP OverviewMRP Overview
MRP Overview
 
Chapter 4: Production and Supply Chain Management Information Systems
Chapter 4: Production and Supply Chain Management Information SystemsChapter 4: Production and Supply Chain Management Information Systems
Chapter 4: Production and Supply Chain Management Information Systems
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 

Similar to Presentation on MRP Work flow

Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationPankaj Kumar
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)Ravimohan Rajmohan
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and PlanningAsim Irshad
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planningmadhu jetty
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentationAkash Maurya
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 
What is an erp system?
What is an erp system?What is an erp system?
What is an erp system?Usman Tariq
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 

Similar to Presentation on MRP Work flow (20)

Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
MRP & ERP.pdf
MRP & ERP.pdfMRP & ERP.pdf
MRP & ERP.pdf
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
 
Oracle Scm
Oracle ScmOracle Scm
Oracle Scm
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
What is an erp system?
What is an erp system?What is an erp system?
What is an erp system?
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 
MRP
MRPMRP
MRP
 

Presentation on MRP Work flow

  • 1. Presentation on MRP By Shehzada Sohail Deputy Manager MRP A.Z Apparel Pvt.Ltd.
  • 2. MRP Controlling System • Origin of Computerized Organizational Systems. • 1960’s:Inventory Control System. • 1970’s:MRP: Material Requirement Planning. • 1980’s:MRP2: MRP & Distribution • 1990’s:MRP2 >ERP with introduction of other business functions > CRM. • Today: Web Enabled ERP-Connecting ERP Externally.
  • 3. What is MRP? • Computerized Inventory Control • Production Planning System • Management Information System • Manufacturing Control System
  • 4. What can MRP do? • Reduce Inventory Levels • Reduce Component Shortages • Improve Shipping Performance • Improve Customer Service • Improve Productivity • Simplified and Accurate Scheduling • Improve Communication • Improve Plant Efficiency • Reduction in Excess Inventory • Reduce Purchasing Cost • Improve Production Schedules • Reduce Manufacturing Cost • Reduce Lead Times • Less Scrap and Rework • Higher Production Quality • Reduce Overtime • Improve Supply Schedules • Improve Calculation of Material Requirements • Improve Competitive Position
  • 5. AdvantagesofMRPImplementation • Process & Work Flow Integration • Efficient utilization of resources. • Ability to share Organizational Data. • Improves Efficiency and Productivity levels. • Lower Costs. • Better customer services and satisfaction.
  • 7. ThreeBasicStepsofMRP • Identifying Requirements (Quantity on hand, quantity on purchase orders, quantity in/or planned for manufacturing, Quantity forecasted.) • Running MRP – Creating the Suggestions(Critical Items, Expedite Items, Delay Items) • Firming the Suggestions
  • 8. RunningMRPCreatingSuggestions • At the end of each day, the MRP system will be run to identify items as critical, expedite, or delay. The MRP system will suggest if you need to order more of a certain material by classifying into the three categories. 1. Critical items are items of immediate importance that should be taken care of right away. 2. Expedite items are items that need to be sped up so that it is completed in less than the normal lead time. 3. Delay items are item that are not of vital importance and can be delayed for the benefit of other items.
  • 10. Leadtimeoffsetting,AllocationandActionsofMRPPlanner • Gross to net explosion tells us how many of each component are needed for a finished product. • The WHEN they are needed is the Lead Time Offset • Prior to order launching, an availability check should be done for the necessary components. • After this Order should be locked for further execution. • Release orders • Reschedule due dates. • Analyze and update system planning factors for the part numbers under ones control. • Reconcile errors and inconsistencies • Find key problem areas. • Use the system to solve critical material shortages. • Indicate where enhancements would make job easier.
  • 11. Extensions of MRP  MRP II  Closed-Loop MRP  MRP system provides input to the capacity plan, MPS, and production planning process  Capacity Planning  MRP system generates a load report which details capacity requirements  This is used to drive the capacity planning process  Changes pass back through the MRP system for rescheduling
  • 12. Capacity Planning • Feedback from the MRP system • Load reports show resource requirements for work centers • Work can be moved between work centers to smooth the load or bring it within capacity Smoothing Tactics 1. Overlapping  Sends part of the work to following operations before the entire lot is complete  Reduces lead time 2. Operations splitting  Sends the lot to two different machines for the same operation  Shorter throughput time but increased setup costs 3. Order or lot splitting  Breaking up the order into smaller lots and running part earlier (or later) in the schedule
  • 13. MRP Outputs Primary Reports • Planned Orders – schedule indicating the amount and timing of future orders • Order Releases – Authorization for the execution of planned orders • Changes – revisions of due dates or order quantities, or cancellation of orders. • Manufacturing Orders • Purchasing Orders Secondary Reports • Performance-control reports – Evaluation of system operation, including deviations from plans and cost information • Planning reports – Data useful for assessing future material requirements • Exception Reports – Data on major discrepancies encountered
  • 14. Hubbell Lighting Case Before MRP Implementation • Less than 75% of orders completed on time After MRP Implementation • 97% of orders completed on time • 3% of orders completed with 2 to 4 days after due date.
  • 15. Summary of MRP MRP is a…..Computerized Inventory Control Production Planning System that….. Schedules Component Items as Needed which will….. Track Inventory and….. Help you in many other aspects of business.  Reschedule Due Dates of Open Orders as Needed.  Reconcile Orders and Find Causes.  Solve Shortages by Expediting.  Strong Coordination with all relevant departments.

Editor's Notes

  1. Here you can see a general evolution of ERP systems. They started as customized and proprietary Inventory control systems in the 1960’s. In the 1970’s the focus shifted to Material Requirement Planning which provided raw materials and component management and procurement. In the 1980’s the model continued to grow by including distribution channel functions. In the 1990’s This model grew further into the fully defined business suites that we have come to know as Enterprise Resource Planning Systems. The development of these products was perpetuated by the desire to move programs off of customized mainframe programs, the development of new technologies, the decentralization of businesses, and the desire to implement BPR. Today, the model grows and ERP companies are trying to fully Internet Enable their products and redesign their products for the new business models. What was once internally focused is now externally focused.
  2. MRP can do many things to help your company succeed. Probably the most important quality of MRP is the fact that it will help your company with inventory. It plans production so that the right materials are at the right place at the right time.
  3. MRP is a basic tool for performing the detailed material planning function in the manufacturing of components parts and their assembly into finished items.
  4. Emphasize that this slide illustrates the overall technological structure of MRP - people and process are also extremely important in its actual success. The BOM is used to determine how many of each component is required to produce a “parent”. For example, to complete one order of fabric we have come to know that how many categories of fabric are required to make a finished product. The product structure file contains a bill of material for every item produced. In other words, this file contains all the component parts for a finished item. For example if you are producing a garment the components of a fleece Garment are > counts of yarn, fabric categories.) To determine the timing and quantity for the purchase orders for the components requires information about lead-times and lot-sizing. The production plan starts with the Sales Forecast for the each month and broken down into a Detailed Production Schedule for each week.
  5. The MRP system looks at several components of demand in order to create its suggestions. The requirements include the above items. Many of these requirements are included in the master production schedules and inventory master files that will be discussed later in this presentation. The MRP system is company, location, and date sensitive. It is important that all data that is entered into the MRP system is accurate. Elements such as outdated bills of material, and lead times can negatively impact the results or MRP.
  6. The is an overview of how the MRP system works. The Orange boxes indicate the inputs into the MRP system. The MRP system then processes the information and delivers outputs as indicated by the yellow boxes. The master production schedule specifies which end items or finished products the company is to produce, how many are needed, and when they are needed. The numbers that are on the master production schedule represent production, not demand, may be a combination of customer orders and demand forecasts, and gives what needs to be produced.
  7. The MRP system delivers two main outputs along with various other reports. The two main outputs are manufacturing orders which can be released to floors for in-house production and purchasing orders which are sent to outside suppliers after reviewing the in-house capacities. The various reports offer suggested changes in previous plans or existing schedules.
  8. Hubbell lighting decided to implement an MRP system to improve its overall capabilities and completion times. Before the MRP implementation, Hubbell Lighting completed less the 75% of its orders on time. After the MRP implementation, on time orders rose to 97% with 3% of orders completed with 1 to 2 days of the promised completion time.