Managerial Accounting 15th ed Chapter 3B
Upcoming SlideShare
Loading in...5
×
 

Managerial Accounting 15th ed Chapter 3B

on

  • 53 views

Managerial Accounting 15th ed Chapter 3B

Managerial Accounting 15th ed Chapter 3B

Statistics

Views

Total Views
53
Views on SlideShare
53
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Managerial Accounting 15th ed Chapter 3B Managerial Accounting 15th ed Chapter 3B Presentation Transcript

  • PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education. The Predetermined Overhead Rate and Capacity Appendix 3B
  • 3B-2 Learning Objective 9 Understand the implications of basing the predetermined overhead rate on activity at capacity rather than on estimated activity for the period.
  • 3B-3 Appendix 3B: The Predetermined Overhead Rate and Capacity. Calculating predetermined overhead rates using an estimated or budgeted amount allocation base. This method was used throughout the chapter; however, recently it has been criticized in two ways: 1.Basing the predetermined overhead rate on budgeted activity results in product costs that fluctuate depending upon the activity level. 2.Calculating predetermined rates based upon budgeted activity charges products for costs that they do not use. This method was used throughout the chapter; however, recently it has been criticized in two ways: 1.Basing the predetermined overhead rate on budgeted activity results in product costs that fluctuate depending upon the activity level. 2.Calculating predetermined rates based upon budgeted activity charges products for costs that they do not use.
  • 3B-4 Capacity-Based Overhead Rates The aforementioned criticism can be overcome by using “estimated total units in the allocation base at capacity” in the denominator of the predetermined overhead rate calculation (rather than the “estimated total units in the allocation base” in the denominator).
  • 3B-5 Maximum, Inc. – An Example Maximum, Inc. leases a piece of equipment for $100,000 per year. If run at full capacity, the machine can produce 50,000 units per year. However, the company estimates that 40,000 units will be produced and sold next year. Predetermined Overrate at units produced and sold: $100,000 40,000 = $2.50 per unit
  • 3B-6 End of Chapter 3 – Appendix B
  • 3B-6 End of Chapter 3 – Appendix B