Scope Definition of Online Ticketing System

  • 2,727 views
Uploaded on

Objective & Motivation …

Objective & Motivation
Existing System Design
Requirement Analysis
Feasibility Study
Opportunity
Future Scope

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
2,727
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
84
Comments
0
Likes
1

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Scope Definition of Ticketing Automation Bangladesh TEAM – WILD SPIDER
  • 2. Basic Concept of Scope Definition • Objective & Motivation • Existing System Design • Requirement Analysis • Feasibility Study • Opportunity • Future Scope
  • 3. Our Objectives and Motivation • A central portal to enjoy the advantage of booking tickets of any bus from anywhere in Bangladesh. • Anyone can book any bus company ticket from our system in the easiest way.
  • 4. Lets have a look of todays ticketing system!
  • 5. Search option of source and destination place
  • 6. Dynamic jquery search helper
  • 7. Calendar for select date easily
  • 8. Red Box: Facility to know more about that bus company/coach details Yellow Box: Facility to know bus condition ALONG WITH PHOTOS. Green Box: Facility to know Departure time, boarding points (departure bus counters) Blue Box: Facility to know How many seats are available in that bus/coach Purple: Facility to know public rating of their services Grey: Facility to know the fare and also the button to view seat condition. The next part is to select the preferred seats. And from our system user will get the perfect illustration. After selecting the seats user will be in the confirmation page and need to confirm their booking Our payment system will include almost all possible payments in BD including bkash.
  • 9. Existing System Design • As for as concerned to project its defined as the system which presently we are using and the proposed system is the new techniques implemented to the existing project if any mistake was happened.
  • 10. Other Existing Systems • paribahan.com
  • 11. Complexity and error in the existing system Existing System Sign Up Members Search from place to destination No suggestion/ Pop up See Available coaches/Buses No choices for seat or view Buy ticket YES NO Very easy signup/Verification and sign in Almost all the available payment gateway
  • 12. Mission and its implementation is not same!
  • 13. Requirement Analysis • Fact Finding • Development environment • Operational environment • Software and hardware requirement • Functional requirement It will list out the minimum requirements required for the project to have. Fact finding will discuss about the information gathered to develop the system.
  • 14. Fact Finding • Research • Background Research • Interview • Observation
  • 15. Operational Environment
  • 16. Development Environment
  • 17. Software Requirement for Development • MYSQL server • Microsoft Office Word • PHP Hypertext Protocol • Web Browser (All) • HTML • CSS • JQUERY • AJAX • Notepad ++ • Paint • CPANEL • Printer driver • Laptop Driver • DBMS • Internet Connection • Localhost • XAMPP/WAMPP
  • 18. Hardware Requirement for Development • Printer • Laptop • Web Server • Office room • Network Switch • Network Router • Ethernet Cable • UPS – Backup Facility
  • 19. Functional Requirements
  • 20. Feasibility Study • Technical Feasibility • Social and Operational Feasibility • Economic Feasibility • Time Feasibility
  • 21. Technical Feasibility • Technical staff is needed for responsibility to this new system is to take care of the server and the database for this new bus ticketing system. • If the system have any problem occur then technical staff will solve the problem immediately so that will affect the business operation of the company • Since this is a new online system so we need to add computer, some necessary of the hardware and software for running this new system is needed.
  • 22. Social and Operational Feasibility • This new system is operationally feasible because it can be used effectively in and in English after it has been developed. • We will arrange technical training for staff and seminar for others. It will provide more convenient for the customer in order to have faith with the company. • This system is designed in a simple way and meaningful for every user to used it. • Customer’s opinion is important because to develop a new system that based on the user requirement to improve the performance and increase the service for customer.
  • 23. Economic Feasibility Costing Analysis Costing Types Quantity Unit Price Year 1 Year 2 Year 3 Hardware Printer 4 15,000 60,000 Printer Cartridge 4 2,000 96,000 96,000 96,000 Computer 4 50,000 2,00,000 Ethernet Cable 1 4,000 4,000 4,000 4,000 Dongle 1 50,000 50,000 Internet 4 1,000 48,000 48,000 48,000 Software Licensed OS 4 12,000 48,000 Anti Virus 4 2,000 8,000 8,000 8,000 Payment Gateway 1 30,000 30,000 30,000 30,000 Domain 5 5,000 5,000 5,000 5,000 Hosting Sarver 3 30,000 30,000 30,000 30,000 Human Reasource Delivery man/ System maintenance Manager 20,000 100,000 (5) 200,000 (10) 4,00,000 (20) Equipments UPS 40,000 40,000 Furniture 1,50,000 1,50,00o Total Cost 8,69,000 4,21,000 6,21,000
  • 24. Benefits Year 1: Estimated bus company with us: 5 Estimated ticket sell per coach by our system: 15 So total ticket sales per day: 5*15 = 75 Total sales by our system (per day): 75*400=30000 Our Income: 30000 * 5% = 1500 Monthly Income: 1500*30 = 45000, yearly: 5,40,000 Expense for year 1: 8,69,000 Revenew for year 1: -3,29,000
  • 25. Benefits Year 2: Estimated bus company with us: 10 Estimated ticket sell per coach by our system: 20 So total ticket sales per day: 10*20 = 200 Total sales by our system (per day): 200*400=80,000 Our Income: 80,000 * 5% = 4000 Monthly Income: 4000*30 = 1,20,000, yearly: 14,40,000 Expense for year 2: 4,21,000 Revenue for year 2: 10,19,000
  • 26. Benefits Year 3: Estimated bus company with us: 15 Estimated ticket sell per coach by our system: 20 So total ticket sales per day: 15*20 = 300 Total sales by our system (per day): 300*400=120,000 Our Income: 120,000 * 5% = 6000 Monthly Income: 6000*30 = 1,80,000, yearly: 21,60,000 Expense for year 2: 6,21,000 Revenue for year 3: 15,39,000
  • 27. Time Feasibility Project Proposal – 3days Project Specification – 7 days Project Process, meeting & deliveries- 10 days Analysis – 15 days Design – 10 days Coding- 90 days Project Testing – 45 days Final Documentation – 10 days Total Time Required : 190 Days
  • 28. Opportunity • For Bangladesh online ticketing system can be able to open a new door. Now Bangladesh is a developing country by applying many technology. • The traditional ticketing system of Bangladesh is a very uncomfortable and weak process. • sometimes it is caused of many problems which can be reduced by online ticketing. • In most of the festivals people have to face lots of troubles. by providing this system corruption can be taken under control. • It can be said that it will very effective for Bangladesh.
  • 29. Future Scope • As mentioned above, although our system had been completed but it is not perfect, we had planned to make some enhancement in the future. • We think that our system still has potential to grow. Besides, we will include more functions and introduce more widgets to the system. Like ▫ Mobile aps ▫ Mobile version ▫ Home Delivery ▫ Call Center Support We also plan to enhance the interface so that it looks more attractive and interactive.
  • 30. Thank You!