Dult 28 march nmt

  • 645 views
Uploaded on

CBD Bicycle infrastructure presentation to DULT Bangalore from Praja.in

CBD Bicycle infrastructure presentation to DULT Bangalore from Praja.in

More in: Design
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
645
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
5
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • To view this presentation, first, turn up your volume and second, launch the self-running slide show.
  • To view this presentation, first, turn up your volume and second, launch the self-running slide show.

Transcript

  • 1. For the NMT task force
    NMT enablement of the MG road area & surroundings
  • 2. 8 kilometers of
    pedestrian + bicycle tracks
    many more NMT friendly kilometers
    Safe route to public transport
  • 3. Network map
    Separated Track
    Lane/Mixed traffic
  • 4. MG Road Segment
    Distance – 3 km
    Junctions - 6
    Metro stations - 3
    Bus stands - 1
    Sidewalk fairly well defined in most stretches except near webbsjn & metro construction areas, utility & bus stand obstructions
  • 5. Junctions
    Straight traffic lane definition
    +
    Pelican Zebra Crossing
    Define zebra Xing & align sidewalk to xing
    Move zebra xing left of pillar
    Trinity Circle
    Mayo Hall Jn
    WebbsJn
  • 6. Sidewalk width – Between 2 & 3 meters
    Non existent near metro station
    Church street to connect st marks road track & lavelle road to cubbon park
  • 7. Obstructions
  • 8. St Marks Road
    Segment
    Distance – 2 km
    Junctions - 9
    TTMC - 1
    SBI/India Garage jn has very good traffic island, sidewalk good too
  • 9. Bollard seperated cycle track
    NMT friendly jn
    3 meter Concrete sidewalk
    Need small ramps at corners
  • 10.
  • 11. Residency Road Segment
    Distance – 1.5 km
    Junctions - 7
    Bus stands - 3
    Sidewalk width uneven & junctions badly formed
  • 12. Ashirvadamjn
    - Redundant island
    - People forced to walk on the street
    4 meters
  • 13. Brigade road jn
  • 14. Mayo hall jn
    Open the access inside the mayo hall compound for NMT
  • 15. Richmond Road Segment
    Distance – 1.5 km
    Junctions - 7
    Bus stands - 3
    Very wide road with very bad sidewalks
  • 16. Try Honge
    Cross Section
    Narrower than rain trees
  • 17. Month 1
    Next steps
    MG Road
    St Marks Road
    Before metro opens
    Month 2
    Residency Road
    Richmond Road
    Seperators
    Markings