Business Risk Case Study Ba31

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

5 comments

Comments 1 - 5 of 5 previous next Post a comment

  • + SandipSen Sandip Sen 2 months ago
    This presentation is a part of a series of our presentations which are available under ’More by the User’ window at the right of the slide. They are best understood if viewed chronologically :

    1) Living Dangerously : Managing Risks in Business

    2) Business Risk Case Study Ba 31

    3) Business Risk Case Study Ba 32

    4) Business Risk Case Study Ba 33
  • + SarahThomasVenus Sarah Thomas 2 months ago
    Very comprehensive and innovative
  • + SandipSen Sandip Sen 3 months ago
    Hi,
    The next part of this Case Study Ba 32 is also available at Slide Share.
    It covers variance analysis with use of predictive analytics of market based, credit based and operational risk. The first slide of the Business Risk Management Series 'Living Dangerously: Managing Risks in business' may also be seen for co-relaltion under 'more by the user' window.
  • + Deanuve Deanuve Blanchard 4 months ago
    Hi,
    This is cool. Using variance for risk through predictive analytics .... you mean cloud computing. That is real smart. application.... also your case study framework is very complex. Can’t figure how you will break it up.... interesting, worth coming back to see. Keep going
  • + ak85ka ak85ka  ڿڰۣڿڰۣ☸ڿڰۣڿڰۣ 4 months ago
    What a wonderful presentation my dear friend!!!!!!! Very cleverly stated indeed!!!!!!!! Good work!!!!!!!!! Thanks for sharing...
Post a comment
Embed Video
Edit your comment Cancel

6 Favorites & 4 Groups

Business Risk Case Study Ba31 - Presentation Transcript

  1. Business Risk Case Studies Ba31 Laying down the framework of a Case study Living Dangerously : Business Risk Management Series
  2. De mystifying Risk • Risk Management is not rocket science • It is not finding the known, the unknown and the unknowable • It is not quantifying the limitless • It is not even, solving the Rubik’s cube • It is at best complex predictive analytics • It is a process of investigating, analyzing and breaking up multi- dimensional variables into linear components, and measuring, responding and mitigating the Risks.
  3. Goal changing makes it easy to measure Risk • Risk Management by TCM is not a new Risk theory • Risk Management by TCM is merely an innovative application of existing theories of risk to reach a desired conclusion. • Risk management in TCM is done by goal changing. • What was “Risk” in the classical theory is the “Risk Cause” in TCM • What was “Risk Effect” in the classical theory is the “Risk” in the TCM • The goal changing helps in easy measurement and quantification of Risk • This is because the effect of any action like “price movement”, “supply delay”, “failure of quality” or “incomplete construction” can be easily recorded and measured, while the actions themselves may not be directly measurable. • Hence Risk in TCM can be recorded and quantified.
  4. Risk is the variance or volatility • The “Risk Cause” is classified as “Expected” or “Unexpected” in the TCM • Both “Expected” and “Unexpected” “Risk Cause” results in variance • Variance is the measure of dispersion, the volatility around the mean value. • This variance or volatility is the measure of Risk • Since this variance happens all the time, Risk in TCM is a certainty that must be continuously measured, monitored and controlled.
  5. Identifying relevant predictors is the key • To monitor and control variance or risk, the variable factors, that are likely to influence future behavior or results, are first segregated • This segregation and data pruning is done to narrow the number of variables to a few relevant predictors based on which the risk response model is formulated on the basis of variance observed and the risk cause identified. • Such variance based prediction models may be based on a simple linear equation or a complex neural network. • This model is validated or even revised, periodically based on its Time Cycle Module, which could be one week for projects and once a day or hour for price movements. • Predictive analytics used for managing risk in TCM is used in the field of marketing, CRM, IT security, engineering, meteorology, and traffic planning.
  6. Risk manager must have vertical knowledge • Predictive analytics can be complex based on statistical modeling or only checklist driven, both based on user experience • In either case the predictive analyst must have both user experience and insider knowledge of the vertical • In both cases the model uses the same core principles of breaking complex variables into simple linear equations, and measuring the mean deviation, investigating the risk cause and planning the risk response • For example in insurance a customer’s, gender, age, occupation, education, hobbies, and driving record are the relevant predictors that would correctly predict the risk and the value at risk VaR in any insurance policy
  7. Risk Manager must have authority • Risk manager must have seniority, experience and authority, and need not be a statistical expert • Risk management systems must be both dynamic and adaptive and not static. Both models and predictors must be validated regularly. • Risk management must be treated as a routine activity, not as a one time check, with process interaction on a daily basis. • Risk management, variance and predictive analysis were used even before the IT age and discovery of statistical tools by using the first principles, experience and human judgment. • The case study of the product launch of the soft drink company demonstrates how to risk manage based on first principles.
  8. Risk management in TCM Case Study includes • Laying down the framework Ba31 • Identifying boundary conditions & inputs required for analysis Ba 32 • Defining the time period of evaluation & repeatability checks Ba 33 • Specifying the qualitative aspects and terms of reference of acceptable variance Ba 34 • Identifying the relevant predictors Ba 35 • Investigating the Risk cause Ba 36 • Measuring Risk and determining the Value at Risk Ba 37 • Formulating the Risk Response Ba 38 • Risk margin and transferring of Risk Ba 39 • Mitigating Threat by sacrificing Opportunity Ba 40
  9. Laying down the framework ( Case Study ) • Case : : Risk Measurement for the product launch of an aerated soft drink • Project Name : Zephyr • Vertical : FMCG • Domain : Marketing & Advertisement • Deliverable : Brand launch of a new soft drink • Vehicle : Promotional campaign for the launch • Association : Taste association with Brand name • Taste : Tangy, “zyzy” taste at the tip of the tongue • Campaign : A promotional campaign to match the unforgettable zyzy” taste to create the Zephyr USP
  10. Other Terms of reference • Product Quality : A fizzy drink blended with a salt that is mildly pungent and tickles (irritates) the skin at the tongue tip for a few minutes. A matching promotional campaign that creates the feel • Project Cost : Launch cost USD 45 million • Project Time : To kill point in 20 weeks • Risk : Insignificant market response
  11. Complex operational Risk with high Risk impact • Insignificant market response is a Risk threatening both the scope and the quality constraint of the Project. If the market response is insignificant, both the product and the project would have failed. It is the highest category of Risk in its domain equivalent to a market crash, a grid collapse or a total loss accident claim. • Insignificant market response is an apparently non- quantify-able risk. It has no direct relation to the variables or the inputs to the project. In the next issue Ba32 in the coming week we will see how this risk is demystified and measured, and how the Risk causes are investigated.
  12. The sequel • This slide show is a sequel to our earlier presentation • Living Dangerously : Managing Risks in Business Ba01 It is part of the Business Risk management Series Ba 01…… Others in the pipeline are • Series on Financial risks : Fa01…Series • Series on Technology risks: Ta01…Series • Series on Career risks: Ca01…Series
  13. Reference Works The Project Management Time Cycle – Vol. I TIME CYCLE MODULE: From concept to feasibility ISBN 1440493332 available at Amazon Economy to Ecology Our goal is to help promote clean, safe and better practices in economy and ecology worldwide. Balanced, efficient and a little more sustainable. Kindle Blog Ecothrust ASIN: B0029ZAUAY For any queries mail to sen.sandip@gmail.com

+ Sandip SenSandip Sen, 4 months ago

custom

7655 views, 6 favs, 2 embeds more stats

This is a sequel to our earlier presentation "Livin more

More info about this document

© All Rights Reserved

Go to text version

  • Total Views 7655
    • 7653 on SlideShare
    • 2 from embeds
  • Comments 5
  • Favorites 6
  • Downloads 264
Most viewed embeds
  • 1 views on http://thecareersgrouplibrary.wordpress.com
  • 1 views on http://ecothrust.blogspot.com

more

All embeds
  • 1 views on http://thecareersgrouplibrary.wordpress.com
  • 1 views on http://ecothrust.blogspot.com

less

Flagged as inappropriate Flag as inappropriate