Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
S L R S L R
Hydro Test, Gravity Water Test
• High Pressure Leak
• Supervisor
• Inspector
• Pipe Fitter
• Plumber
• Helpers
5 3 15 • Pipe Fitter Shall Be Trained And Competent.
• Plumber Shall Be Trained And Competent.
• Work Crews Will Use Appropriate PPE. (Hand Gloves,
Safety Goggles)
• STARRT Talks For Crews by supervisor Involve In Pressure
Test
• Ensure Appropriate Barricades (Tape) & Sign Boards Placed
Around The Area During Pressure Testing and watchman to
be assigned around the area by concern team.
• Proper Communication during Pressure Testing.
• Training for Proper Use of Hydro Test Manual and Hydro
Test Booster Pump.
• Hand Tools Training As Tool Box Talks Topic.
• Tools Will Be Used Only For Their Intended Purposes &
Inspect Daily Prior To Start Of Work.
• Obtain Pressure Test Permit Prior To Start Of Work
• First Aid Kit Will Be Available.
• Pressure relive valve to be installed.
• Emergency vehicle must be present on site.
2 1 2
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
Pneumatic Test
• Over Pressure
• Fire
• Gas Purging
• Supervisor
• Pipe Fitter
• Plumber
• Inspector
• Helpers
3 3 9 • Pipe Fitter Shall Be Trained And Competent.
• Plumber Shall Be Trained And Competent.
• Work Crews Will Use Appropriate PPE. (Hand Gloves,
Safety Goggles)
• STARRT Talks For All Crews Involve In Pneumatic Test
• Ensure Appropriate Barricades (Tape) & Sign Boards Placed
Around The Area During Pneumatic Test
• Compressed Air Training As Tool Box Talks Topic.
• Training For Proper Use Of Hydro Test Manual And Hydro
Test Booster Pump.
• Hand Tools Training As Tool Box Talks Topic.
• Tools Will Be Used Only For Their Intended Purposes &
Inspect Daily Prior To Start Of Work.
• Proper Communication During Pneumatic Test
• Provide Adequate Fire Protection (Provision Of Sand, Fire
Blanket, Fire Watchmen & Fire Extinguishers).
• Obtain Pressure Test Permit Prior To Start Of Work
• First Aid Kit Will Be Available.
2 1 2
Slips, Trips And Fall • Foreman
• Pipe Fitter
• Plumber
• Helpers
3 3 9 • STARRT Talks For Crews
• Work Crews Will Use Appropriate PPE.
• Housekeeping Training As Tools Box Talks Topic.
• Always Check The Area Free From Unnecessary Materials.
• Work Place Which Has Been Maintained In A Good
Condition And Which Is Clean And Tidy
2 1 2
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
Compressed Gas Cylinders
• Explosion
• Fire
• All 5 4 20 • Work Crews Will Use Appropriate PPE
• STARRT Talks For Crews
• Compressed Gas Training As Tool Box Talks Topic.
• Provide Adequate Fire Protection (Provision Of Sand, Fire
Blanket, and Fire Watchman & Fire Extinguisher).
• Always Use The Proper Regulator For The Type Of Gas In
The Cylinder.
• Oil and Grease Not To Contact with Cylinder or Their
Valves.
• Always Use A Cylinder Wrench.
• Cylinders Should Never Be Rolled Or Dragged.
• Ensure Stability For Moving Large Cylinders And Strap
Them To A Properly Designed Wheeled Cart.
• Cylinder Should Be Properly Secured.
• Never Lift Cylinders by the Cap. The Cap Is For Valve
Protection Only.
• Do Not Use A Wrench To Open Or Close A Hand Wheel
Type Cylinder Valve.
• Cylinder Should Be Stored in A Well Ventilated Area Away
from Flames, Spark Any Source Of Heat Or Ignition.
• Always Store and Transport In Upright Position.
2 2 4
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
Power Tools
• Rotating Parts
• Electrocution From Damage Cables
• Inhalation (Dust)
• Dust/Objects In Eye
• Pipe Fitter
• Foreman
• Helpers
• Plumber
5 3 15 • Pipe Fitter Shall Be Trained & Competent.
• Plumber Shall Be Trained And Competent.
• Work Crews Will Use Appropriate PPE.( Safety Goggles,
Face Shields, Dust Mask )
• STARRT Talks For All Crews.
• Power Tools Training As Tool Box Talks Topic.
• Power Tools And Cables Shall Be Inspected Daily And
Color Coded Prior To Start Of Work.
• Damage Or Defective Power Tools Shall Be Tagged Out Of
Service And Immediately Returned To The Tool Room for
Repair.
• Grounding/Earthing Will Be Provided On All Mobile
Generators.
3 1 3
Foreign Body In Eye • All 3 3 9 • STARRT Talks for All Crews.
• Work Crews Will Use Appropriate PPE.( Face Shield, Safety
Goggles )
• Eye Protection Training as Tool Box Talks Topic.
2 1 2
Confined Space Entry • Supervisor
• Plumbers
• Pipe Fitter
• Inspectors
5 3 15 • Obtain Confined Space Entry Permit Prior To Beginning
Works.
• STARRT Talks With Crews Entering Confined Space.
• Confined Space Training As Tool Box Talks Topic.
• Authorized Entrants Shall Be Trained And Competent.
• Implement Confined Space Entry Program.
• Ensure Appropriate Barricades (Tape) & Sign Boards Placed
Around The Area Of Confined Space.
2 1 2
Working At Heights
• Fall Person
• Fall Material
• Foreman
• Pipe Fitter
• Plumber
• Helpers
3 3 9 • Working At Heights Training As Tool Box Talks Topic.
• STARRT Talks For Crews Working At Heights.
• Scaffold Erection By Competent Person.
• Scaftag Inspection Approval before Use.
2 1 2
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
• Inspector • Scaftag Work Permit Required.
• Safety Full Body Harness Required (Fall Protection).
Electrical Equipment
• Fire & Explosion
• Electrocution
• Electricians
• Plumbers
• Pipe Fitters
• Welders
• Helpers
• Foreman
• Inspectors
5 3 15 • Electricians Shall Be Trained & Competent.
• Work Crews Will Use Appropriate PPE.
• Safe Insulated Tools Will Be Used In Order To Carry Out
Electrical Work.
• Grounding/Earthing Will Be Provided On All Mobile
Electrical Generators.
• Ground Fault Circuit Interrupter (GFCIs) / Earth Leakage
Circuit Interrupter (ELCBs) Will Be Provided For All Areas
Having A Wet Atmosphere Where Electrical Equipment Or
Portable Electrical Tools May Be Used.
• Equipment Shall Be Maintained in a Good Condition And
Color Coded.
• STARRT Talks For All Crews.
• Site Electricity Training as Tool Box Talks Topic.
• Lock Out/Tag out System.
• Power Tools & Cables Inspected And Color Coded.
3 1 3
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
Hot Works
• Fire
• Electrocution
• Health Impairment
• Impaired Vision
• Explosion
• Welders
• Helpers
• Pipe fitters
• Plumber
5 4 20 • Welders Will Wear Safety Boots with Steel Toe, Welding
Shield With Helmet, Welding Apron & Welding Gloves.
• STARRT Talks For All Crews Involve In Hot Works.
• Hot Works Training As Tool Box Talks Topic.
• Ensure Appropriate Barricade & Sign Boards Placed Around
All Hot Works Activities.
• Provide Adequate Fire Protection (Provision Of Sand, Fire
Blanket, Fire Watchmen & Fire Extinguishers).
• Daily Inspection Of Welding Machines & Earthing Prior To
Start Of Work.
• Welders Shall Be Trained & Competent.
• Welders Shall Have A Valid Certification.
• Welding Cables Shall Be Inspected And Color Coding To
Ensure Good Condition.
• Obtain Hot Works Permit Prior To Beginning Works.
• First Aid Kit Will Be Available.
• Welding Screens Must Be Erected To Protect Others From
The Arc (Flush Burn).
2 2 4
Hazardous Substances
• Skin Burning
• Eye Irritations
• Health Impairment-Inhalation
• Fire
• Plumber
• Pipe Fitter
• Foreman
• Helpers
5 3 15 • Material Safety Data Sheet (MSDS) Shall Be Provided.
• STARRT Talks For Crews Working In Hazardous
Substances.
• Control Of Substances Hazardous To Health Training As
Tool Box Talks Topic.
• Appropriate Training Prior To Start Of Work.
• Work Crews Will Use Appropriate PPE.( Rubber Gloves,
Dust Masks)
• First Aid Kit Will Be Available.
3 1 3
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
Vehicle Operation
• Collision
• Persons Struck By Vehicles
• Drivers
• Operators
• Banksmen
• Pipe Fitter
• Helpers
• Plumber
• Pedestrian
5 3 15 • Implement Defensive Driving Program.
• Trained & Competent Drivers With Project Driving Permit.
• Traffic Control Plan Shall Be Implemented.
• Trained & Competent Banks men Directing Vehicles.
• Traffic Rules Shall Be Enforced.
• Instructions To All Drivers As Tool Box Talks Topic.
• STARRT Talks For All Crews.
• Routine Preventive Maintenance Program To Ensure Good
Working Condition Of Vehicles.
• High Visibility Vest Will Be Worn.
• Headlights Always On For Visibility.
3 1 3
Noise (Equipment )
• Ear Damage
• Operators
• Pipe Fitter
• Plumber
• Helpers
3 3 9 • Work Crews Will Use Appropriate PPE (Ear Muff, Ear
Plug).
• STARRT Talks For Crews Working In Noisy Environment.
• Noise (Ear Protection) As Training In Tool Box Talks Topic.
• Ensure Appropriate Barricades (Tape) & Sign Boards “Ear
Protectors Must Be Worn In This Area” Placed Around In
The Equipment.
• All Silencers Must Be Inspected To Ensure The Proper
Condition Of Equipment Prior To Start Of Work
• All Motorized On Site Must Utilize Silencer.
2 1 2
Noise ( Power Tools )
• Ear Damage
• Pipe Fitter
• Helpers
• Plumber
• Supervisor
3 3 9 • STARRT Talks For Crews Working In Noisy Environment.
• Noise (Ear Protection) As Training In Tool Box Talks Topic.
• Work Crews Will Use Appropriate PPE (Ear Muff, Ear
Plug).
2 1 2
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT
Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works
Hazard Persons at Risk
Risk Rating
Proposed Control Measures
Risk
Rating
General Welfare • All 5 4 20 • Work Crews Will Use Appropriate PPE.
• Dust Masks Required In Windy/Dusty Condition.
• Provide Sufficient Cool Drinking Water Near Workers.
• Provide Sufficient Toilets In Close Vicinity Of Workers.
• Provide Shaded Rest Areas In Close Vicinity Of Workers.
• Provide Sufficient Lights Near Workers At Night.
• Employees Shall Be Trained On Heat Stress Prevention,
Recognition And Treatment.
2 2 4
Fluid Spills From Vehicles Equipment
• Ground Contamination
• Water Contamination
• Environment 3 3 9 • Daily Inspection of Equipment For Leaks.
• Routine Preventive Maintenance Program.
• Maintenance Performed By Competent Persons.
• Drip Pans Sheets Used During Service.
• Spills Kit (Sand) Available In Service Area.
• Impervious Material under Fuel Tanks (Bonded) Fuelling
Area, Service Area.
• Impervious Material under Waste Oil Storage Area.
2 1 2
Originator: Sajid Ali Date: 14 March 2015

More Related Content

What's hot

20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety ChecklistLukman Nulhakiem
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Azmeel Contracting Company
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templatesDwarika Bhushan Sharma
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templatesDwarika Bhushan Sharma
 
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI  Rev 2.docxLADDER INSPECTION Form # HSEQ - LI  Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI Rev 2.docxDwarika Bhushan Sharma
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxDwarika Bhushan Sharma
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYAlex TX
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAAtlantic Training, LLC.
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templatesDwarika Bhushan Sharma
 
NGI-Authorized Gas Testing
NGI-Authorized Gas TestingNGI-Authorized Gas Testing
NGI-Authorized Gas Testinglifecombo
 

What's hot (20)

20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI  Rev 2.docxLADDER INSPECTION Form # HSEQ - LI  Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCA
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates
 
NGI-Authorized Gas Testing
NGI-Authorized Gas TestingNGI-Authorized Gas Testing
NGI-Authorized Gas Testing
 

Viewers also liked

RA- Flushing - Chemical Treatment
RA- Flushing - Chemical TreatmentRA- Flushing - Chemical Treatment
RA- Flushing - Chemical TreatmentSajid Ali
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessmentlifecombo
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyDesign World
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagoutMary Helen
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan genericfirstpick
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templatetamz486
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag OutHvacmach
 

Viewers also liked (11)

RA- Flushing - Chemical Treatment
RA- Flushing - Chemical TreatmentRA- Flushing - Chemical Treatment
RA- Flushing - Chemical Treatment
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessment
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 

Similar to RA- Pressure Testing Of Pipe Works

Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentationSamip Nathani nathani
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector Shivakumar Dhanabalan
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV NewSteven Wilson
 
Health & safety part 1
Health & safety part 1Health & safety part 1
Health & safety part 1Nmarksmith
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
Andrew Gannon CV Edited copy 2
Andrew Gannon CV Edited copy 2Andrew Gannon CV Edited copy 2
Andrew Gannon CV Edited copy 2Andrew Gannon
 
Complete Personnel Service Solution - Oil & Gas Upstream
Complete Personnel Service Solution - Oil & Gas UpstreamComplete Personnel Service Solution - Oil & Gas Upstream
Complete Personnel Service Solution - Oil & Gas UpstreamRogier Kind
 

Similar to RA- Pressure Testing Of Pipe Works (20)

Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentation
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
"
""
"
 
Targeted assessment program update Greg Connolly
Targeted assessment program update Greg ConnollyTargeted assessment program update Greg Connolly
Targeted assessment program update Greg Connolly
 
2015_J_Kilmister_Resume
2015_J_Kilmister_Resume2015_J_Kilmister_Resume
2015_J_Kilmister_Resume
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Darren Johnson CV
Darren Johnson CVDarren Johnson CV
Darren Johnson CV
 
Chst prep core 2018
Chst prep core 2018Chst prep core 2018
Chst prep core 2018
 
CONFINED SPACE TRAINING
CONFINED SPACE TRAININGCONFINED SPACE TRAINING
CONFINED SPACE TRAINING
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector
 
Ikram _CV.
Ikram _CV.Ikram _CV.
Ikram _CV.
 
FAISALRESUME
FAISALRESUMEFAISALRESUME
FAISALRESUME
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
Health & safety part 1
Health & safety part 1Health & safety part 1
Health & safety part 1
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
New cv rohit
New cv rohitNew cv rohit
New cv rohit
 
Andrew Gannon CV Edited copy 2
Andrew Gannon CV Edited copy 2Andrew Gannon CV Edited copy 2
Andrew Gannon CV Edited copy 2
 
Complete Personnel Service Solution - Oil & Gas Upstream
Complete Personnel Service Solution - Oil & Gas UpstreamComplete Personnel Service Solution - Oil & Gas Upstream
Complete Personnel Service Solution - Oil & Gas Upstream
 
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
 

RA- Pressure Testing Of Pipe Works

  • 1. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating S L R S L R Hydro Test, Gravity Water Test • High Pressure Leak • Supervisor • Inspector • Pipe Fitter • Plumber • Helpers 5 3 15 • Pipe Fitter Shall Be Trained And Competent. • Plumber Shall Be Trained And Competent. • Work Crews Will Use Appropriate PPE. (Hand Gloves, Safety Goggles) • STARRT Talks For Crews by supervisor Involve In Pressure Test • Ensure Appropriate Barricades (Tape) & Sign Boards Placed Around The Area During Pressure Testing and watchman to be assigned around the area by concern team. • Proper Communication during Pressure Testing. • Training for Proper Use of Hydro Test Manual and Hydro Test Booster Pump. • Hand Tools Training As Tool Box Talks Topic. • Tools Will Be Used Only For Their Intended Purposes & Inspect Daily Prior To Start Of Work. • Obtain Pressure Test Permit Prior To Start Of Work • First Aid Kit Will Be Available. • Pressure relive valve to be installed. • Emergency vehicle must be present on site. 2 1 2
  • 2. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating Pneumatic Test • Over Pressure • Fire • Gas Purging • Supervisor • Pipe Fitter • Plumber • Inspector • Helpers 3 3 9 • Pipe Fitter Shall Be Trained And Competent. • Plumber Shall Be Trained And Competent. • Work Crews Will Use Appropriate PPE. (Hand Gloves, Safety Goggles) • STARRT Talks For All Crews Involve In Pneumatic Test • Ensure Appropriate Barricades (Tape) & Sign Boards Placed Around The Area During Pneumatic Test • Compressed Air Training As Tool Box Talks Topic. • Training For Proper Use Of Hydro Test Manual And Hydro Test Booster Pump. • Hand Tools Training As Tool Box Talks Topic. • Tools Will Be Used Only For Their Intended Purposes & Inspect Daily Prior To Start Of Work. • Proper Communication During Pneumatic Test • Provide Adequate Fire Protection (Provision Of Sand, Fire Blanket, Fire Watchmen & Fire Extinguishers). • Obtain Pressure Test Permit Prior To Start Of Work • First Aid Kit Will Be Available. 2 1 2 Slips, Trips And Fall • Foreman • Pipe Fitter • Plumber • Helpers 3 3 9 • STARRT Talks For Crews • Work Crews Will Use Appropriate PPE. • Housekeeping Training As Tools Box Talks Topic. • Always Check The Area Free From Unnecessary Materials. • Work Place Which Has Been Maintained In A Good Condition And Which Is Clean And Tidy 2 1 2
  • 3. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating Compressed Gas Cylinders • Explosion • Fire • All 5 4 20 • Work Crews Will Use Appropriate PPE • STARRT Talks For Crews • Compressed Gas Training As Tool Box Talks Topic. • Provide Adequate Fire Protection (Provision Of Sand, Fire Blanket, and Fire Watchman & Fire Extinguisher). • Always Use The Proper Regulator For The Type Of Gas In The Cylinder. • Oil and Grease Not To Contact with Cylinder or Their Valves. • Always Use A Cylinder Wrench. • Cylinders Should Never Be Rolled Or Dragged. • Ensure Stability For Moving Large Cylinders And Strap Them To A Properly Designed Wheeled Cart. • Cylinder Should Be Properly Secured. • Never Lift Cylinders by the Cap. The Cap Is For Valve Protection Only. • Do Not Use A Wrench To Open Or Close A Hand Wheel Type Cylinder Valve. • Cylinder Should Be Stored in A Well Ventilated Area Away from Flames, Spark Any Source Of Heat Or Ignition. • Always Store and Transport In Upright Position. 2 2 4
  • 4. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating Power Tools • Rotating Parts • Electrocution From Damage Cables • Inhalation (Dust) • Dust/Objects In Eye • Pipe Fitter • Foreman • Helpers • Plumber 5 3 15 • Pipe Fitter Shall Be Trained & Competent. • Plumber Shall Be Trained And Competent. • Work Crews Will Use Appropriate PPE.( Safety Goggles, Face Shields, Dust Mask ) • STARRT Talks For All Crews. • Power Tools Training As Tool Box Talks Topic. • Power Tools And Cables Shall Be Inspected Daily And Color Coded Prior To Start Of Work. • Damage Or Defective Power Tools Shall Be Tagged Out Of Service And Immediately Returned To The Tool Room for Repair. • Grounding/Earthing Will Be Provided On All Mobile Generators. 3 1 3 Foreign Body In Eye • All 3 3 9 • STARRT Talks for All Crews. • Work Crews Will Use Appropriate PPE.( Face Shield, Safety Goggles ) • Eye Protection Training as Tool Box Talks Topic. 2 1 2 Confined Space Entry • Supervisor • Plumbers • Pipe Fitter • Inspectors 5 3 15 • Obtain Confined Space Entry Permit Prior To Beginning Works. • STARRT Talks With Crews Entering Confined Space. • Confined Space Training As Tool Box Talks Topic. • Authorized Entrants Shall Be Trained And Competent. • Implement Confined Space Entry Program. • Ensure Appropriate Barricades (Tape) & Sign Boards Placed Around The Area Of Confined Space. 2 1 2 Working At Heights • Fall Person • Fall Material • Foreman • Pipe Fitter • Plumber • Helpers 3 3 9 • Working At Heights Training As Tool Box Talks Topic. • STARRT Talks For Crews Working At Heights. • Scaffold Erection By Competent Person. • Scaftag Inspection Approval before Use. 2 1 2
  • 5. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating • Inspector • Scaftag Work Permit Required. • Safety Full Body Harness Required (Fall Protection). Electrical Equipment • Fire & Explosion • Electrocution • Electricians • Plumbers • Pipe Fitters • Welders • Helpers • Foreman • Inspectors 5 3 15 • Electricians Shall Be Trained & Competent. • Work Crews Will Use Appropriate PPE. • Safe Insulated Tools Will Be Used In Order To Carry Out Electrical Work. • Grounding/Earthing Will Be Provided On All Mobile Electrical Generators. • Ground Fault Circuit Interrupter (GFCIs) / Earth Leakage Circuit Interrupter (ELCBs) Will Be Provided For All Areas Having A Wet Atmosphere Where Electrical Equipment Or Portable Electrical Tools May Be Used. • Equipment Shall Be Maintained in a Good Condition And Color Coded. • STARRT Talks For All Crews. • Site Electricity Training as Tool Box Talks Topic. • Lock Out/Tag out System. • Power Tools & Cables Inspected And Color Coded. 3 1 3
  • 6. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating Hot Works • Fire • Electrocution • Health Impairment • Impaired Vision • Explosion • Welders • Helpers • Pipe fitters • Plumber 5 4 20 • Welders Will Wear Safety Boots with Steel Toe, Welding Shield With Helmet, Welding Apron & Welding Gloves. • STARRT Talks For All Crews Involve In Hot Works. • Hot Works Training As Tool Box Talks Topic. • Ensure Appropriate Barricade & Sign Boards Placed Around All Hot Works Activities. • Provide Adequate Fire Protection (Provision Of Sand, Fire Blanket, Fire Watchmen & Fire Extinguishers). • Daily Inspection Of Welding Machines & Earthing Prior To Start Of Work. • Welders Shall Be Trained & Competent. • Welders Shall Have A Valid Certification. • Welding Cables Shall Be Inspected And Color Coding To Ensure Good Condition. • Obtain Hot Works Permit Prior To Beginning Works. • First Aid Kit Will Be Available. • Welding Screens Must Be Erected To Protect Others From The Arc (Flush Burn). 2 2 4 Hazardous Substances • Skin Burning • Eye Irritations • Health Impairment-Inhalation • Fire • Plumber • Pipe Fitter • Foreman • Helpers 5 3 15 • Material Safety Data Sheet (MSDS) Shall Be Provided. • STARRT Talks For Crews Working In Hazardous Substances. • Control Of Substances Hazardous To Health Training As Tool Box Talks Topic. • Appropriate Training Prior To Start Of Work. • Work Crews Will Use Appropriate PPE.( Rubber Gloves, Dust Masks) • First Aid Kit Will Be Available. 3 1 3
  • 7. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating Vehicle Operation • Collision • Persons Struck By Vehicles • Drivers • Operators • Banksmen • Pipe Fitter • Helpers • Plumber • Pedestrian 5 3 15 • Implement Defensive Driving Program. • Trained & Competent Drivers With Project Driving Permit. • Traffic Control Plan Shall Be Implemented. • Trained & Competent Banks men Directing Vehicles. • Traffic Rules Shall Be Enforced. • Instructions To All Drivers As Tool Box Talks Topic. • STARRT Talks For All Crews. • Routine Preventive Maintenance Program To Ensure Good Working Condition Of Vehicles. • High Visibility Vest Will Be Worn. • Headlights Always On For Visibility. 3 1 3 Noise (Equipment ) • Ear Damage • Operators • Pipe Fitter • Plumber • Helpers 3 3 9 • Work Crews Will Use Appropriate PPE (Ear Muff, Ear Plug). • STARRT Talks For Crews Working In Noisy Environment. • Noise (Ear Protection) As Training In Tool Box Talks Topic. • Ensure Appropriate Barricades (Tape) & Sign Boards “Ear Protectors Must Be Worn In This Area” Placed Around In The Equipment. • All Silencers Must Be Inspected To Ensure The Proper Condition Of Equipment Prior To Start Of Work • All Motorized On Site Must Utilize Silencer. 2 1 2 Noise ( Power Tools ) • Ear Damage • Pipe Fitter • Helpers • Plumber • Supervisor 3 3 9 • STARRT Talks For Crews Working In Noisy Environment. • Noise (Ear Protection) As Training In Tool Box Talks Topic. • Work Crews Will Use Appropriate PPE (Ear Muff, Ear Plug). 2 1 2
  • 8. Arabian Bemco Contracting Co. KSA Power Plant Project-10 RISK ASSESSMENT Assessment No: RA- Assessed By: Activity: Hydro testing/Pressure Testing Of Pipe Works Hazard Persons at Risk Risk Rating Proposed Control Measures Risk Rating General Welfare • All 5 4 20 • Work Crews Will Use Appropriate PPE. • Dust Masks Required In Windy/Dusty Condition. • Provide Sufficient Cool Drinking Water Near Workers. • Provide Sufficient Toilets In Close Vicinity Of Workers. • Provide Shaded Rest Areas In Close Vicinity Of Workers. • Provide Sufficient Lights Near Workers At Night. • Employees Shall Be Trained On Heat Stress Prevention, Recognition And Treatment. 2 2 4 Fluid Spills From Vehicles Equipment • Ground Contamination • Water Contamination • Environment 3 3 9 • Daily Inspection of Equipment For Leaks. • Routine Preventive Maintenance Program. • Maintenance Performed By Competent Persons. • Drip Pans Sheets Used During Service. • Spills Kit (Sand) Available In Service Area. • Impervious Material under Fuel Tanks (Bonded) Fuelling Area, Service Area. • Impervious Material under Waste Oil Storage Area. 2 1 2 Originator: Sajid Ali Date: 14 March 2015