Your SlideShare is downloading. ×
Roads? Where We’re Going, We Don’t Need Roads
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Roads? Where We’re Going, We Don’t Need Roads

280
views

Published on

Presented by Tim Downing, geoLOGIC …

Presented by Tim Downing, geoLOGIC
See more FME World Tour 2014 presentations at www.safe.com/recap2014

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
280
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Sliver Remover added to main workspaceCoordinate Rounder
  • Transcript

    • 1. CONNECT. TRANSFORM. AUTOMATE. Roads? Where we’re going we don’t need roads. Tim Downing Manager, gDC Development
    • 2. Getting ready for 2015
    • 3. The Problem With Roads
    • 4.  Snap vertices South  Snap vertices West
    • 5. Correction Lines
    • 6. The Workspace
    • 7. First Pass  Meridian lines with variable distances and problems  Known areas missing grid  Holes caused by misaligned vertices  Decision to use summer students to correct holes
    • 8. How to validate manual work? Use FME!
    • 9. Great Scott! Holes Everywhere!
    • 10. Multi-Step Process  Add Sliver Remover to main workspace  Re-evaluate whole process and split into sections for performance
    • 11. Coordinate Rounder
    • 12. Roads are gone
    • 13. Ready for 2015
    • 14. Thank You!  Questions?  For more information:  tdowning@geologic.com  geoLOGIC systems ltd

    ×