Your SlideShare is downloading. ×
0
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
ETL GISSUB
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

ETL GISSUB

598

Published on

This session explores how FME technology as a spatial ETL solution. Specifically how it can be used to extract geometry from a CAD database, then transform and load it into an APDM Oracle Spatial …

This session explores how FME technology as a spatial ETL solution. Specifically how it can be used to extract geometry from a CAD database, then transform and load it into an APDM Oracle Spatial system, validating the geometry along the way.

See more presentations from the FME User Conference 2014 at: www.safe.com/fmeuc

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
598
On Slideshare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. CONNECT. TRANSFORM. AUTOMATE. ETL GISSUB Alessandro da Silva Civil Engineer and GIS Analyst
  • 2. Summary 1.  ABOUT PETROBRAS 2.  WHAT DOES GEODESY DEPARTMENT DO? 3.  SGO 4.  ETL 5.  GISSUB 6.  IN PROGRESS 7.  QUESTIONS CONNECT. TRANSFORM. AUTOMATE.
  • 3. PETROBRAS PETROBRAS EXPLORATION AND PRODUCTION E&P SERVICES SUBSEA SERVICES UNIT GEODESY DIVISION !  PETROBRAS in numbers: •  5th biggest energy company in the world; •  Daily Production: 2.021.000 barrels/day +/- 2%; •  Frota de navios : 242 (56 da Petrobras); •  Dutos: 30.067km (rígidos e flexíveis); •  15 Refineries and 27 plants; •  We are at 28 countries; •  90% of production is from subsea wells. •  12 Vessels installing pipelines 24/7.
  • 4. GEODESY DEPARTMENT Positioning Mapping
  • 5. SGO !  SGO is a system developed to process, store and share data related to subsea pipelines, equipments and platforms installed by Petrobras. !  Used for planing and safe execution of all offshore operations, avoiding accidents in facilities and reflexes for people and enviroment. !  Is CAD based – Started in 1995 (MicroStation). !  18.500 access in May 2014. !  Users in more than 300 vessels.
  • 6. 670m
  • 7. ETL !  Why ETL? •  Create GIS tools in CAD (Queries, Searchs, Attributes, Topology...) is an arduous task; •  Keep a CAD based structure updated every day (44 dgn files in Campos Basin – 8 professionals); •  Backup in DVDs; •  More than one UTM zone; •  Build a structure to GIS systems; •  Data Validation (Geometry, Topology, attributes); •  Interoperability; •  Good data to build good solutions; •  Have more than visualization.
  • 8. ETL !  What does the ETL do? •  Extracts data from CAD; •  Transform them, doing all validations and creating geometries according to each element behavior; •  Loads them into a customized APDM (ArcGIS Pipeline Data Model – World Standar) Oracle Spatial Database.
  • 9. ETL
  • 10. ETL !  Requirements •  Treat each element (46) separately according to the engineering and connectivity rules (Anchors, Anchor Lines, Pipelines, Platforms, WCTs, Manifolds, Connectors...); •  Treat Cell elements; •  Improve security; •  Remove Microlines; •  Update the Database every day; •  Leave nothing behind; •  Keep removed features (history); •  Report the errors.
  • 11. ETL !  Around 130 rules; !  Some Rules: •  A regular Anchor connects to an Anchor Line; •  A regular connector is suppose to have at least two pieces of pipelines; •  A WCT has always to be in a well head; •  A PLET always connects a steel pipeline to a flexible one; •  There are no lines with less than 1 meter of length; •  Cathodic Protection, in SGO, just in steel pipelines.
  • 12. ETL DGN TO FFS - Workbench Takes 90 minutes to run
  • 13. ETL DGN TO FFS Workbench
  • 14. ETL Anchor - Workbench Takes 10 minutes to run
  • 15. ETL Pipeline - Workbench Takes 49 minutes to run
  • 16. GISSUB
  • 17. IN PROGRESS !  Geometric Network
  • 18. IN PROGRESS !  Connection among elements – Geometric Network
  • 19. IN PROGRESS !  Connecting other databases
  • 20. IN PROGRESS !  FME SERVER
  • 21. Thank You! !  Questions? !  For more information: !  Alessandro da Silva ale.silva.fototerra@petrobras.com.br !  Fototerra/Petrobras CONNECT. TRANSFORM. AUTOMATE.

×