Kinnickinnic Watershed Action Team Meeting                March 2011
• KK-2     has 3 of the top five priority values and is third forphosphorus (P) loads.• KK-3 has 2 of the top five priorit...
• KK-6  has 3 of the top five priority values and is number2 for baseline total loads of Phosphorus.• KK-8 has 2 of the to...
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Kinnickinnic River Watershed Priority Catchment Areas
Upcoming SlideShare
Loading in …5
×

Kinnickinnic River Watershed Priority Catchment Areas

491 views
433 views

Published on

Presented at Kinnickinnic River Watershed Action Team Meeting March 16, 2011

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
491
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kinnickinnic River Watershed Priority Catchment Areas

  1. 1. Kinnickinnic Watershed Action Team Meeting March 2011
  2. 2. • KK-2 has 3 of the top five priority values and is third forphosphorus (P) loads.• KK-3 has 2 of the top five priority values and is number5 for baseline total loads for Total Suspended Solids(TSS).• KK-4 has none of the top five priority values and isnumber 2 for baseline total loads for TSS.• KK-5 has 3 of the top five priority values and is rankednumber 3 for baseline total loads for TSS, and alsonumber 1 for Phosphorus.
  3. 3. • KK-6 has 3 of the top five priority values and is number2 for baseline total loads of Phosphorus.• KK-8 has 2 of the top five priority values and is number1 for TSS baseline total loads, and number 4 forPhosphorus baseline total loads.• KK-10 has 2 of the top five priority values and isnumber 4 baseline total loads for TSS and number 5 forPhosphorus.

×