• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
POWER GENERATION IN INDIA -PVT VS GOVT.
 

POWER GENERATION IN INDIA -PVT VS GOVT.

on

  • 9,675 views

 

Statistics

Views

Total Views
9,675
Views on SlideShare
9,642
Embed Views
33

Actions

Likes
2
Downloads
164
Comments
0

1 Embed 33

http://www.slideshare.net 33

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    POWER GENERATION IN INDIA -PVT VS GOVT. POWER GENERATION IN INDIA -PVT VS GOVT. Presentation Transcript

    • POWER GENERATION IN INDIA PVT VS GOVT SHIVAJI CHOUDHURY
    • INSTALLED CAPACITY
      • THERMAL- 86.015 GW (65%)
      • HYDRO 34.654 GW (26%)
      • NUCLEAR 3.900 GW (3%)
      • RENEW ENRGY 7.760 GW (6%)
    • TOTAL GENERATION IN BILLION UNITS
      • THERMAL 527.499 (80%)
      • HYDRO 113.315 (17%)
      • NUCLEAR 18.605 (3%)
      • TOTAL 659.419
    • CAPACITY & GENERATION
    • INSTALLED CAPACITY
      • CENTRAL SECTOR- 45.121 GW (34%)
      • STATE SECTOR 70.095 GW (53%)
      • PRIVATE SECTOR 17.113 GW (13%)
      • TOTAL 132.329 GW
    • TOTAL GENERATION (IN BILLION UNITS)
      • CENTRAL SECTOR - 275.339 (42%)
      • STATE SECTOR- 325.221 (49%)
      • PVT SECTOR 58.859 (9%)
      • TOTAL 659.419
    • GENERATION -PERFORMENCE
    • GOVT VS PVT SECTOR
      • INSTALLED CAPACITY OF PVT SECTOR IS 13% OF INSTALLED CAPACITY OF INDIA,HOWEVER TOTAL GENERATION IS ONLY 9% OF TOTAL GENERATION OF INDIA.
      • INSTALLED CAPACITY OF TOTAL STATE GOVT IS 53% HOWEVER TOTAL GENERATION IS 49% OF TOTAL GENERATION.
      • IF YOU COMPARE GOVT SECTOR WITH PVT SECTOR ,YOU WILL FIND THAT PVT SECTOR IS INEFFICIENT THAN EVEN STATE ELECTRICITY BOARDS OF INDIA.