Your SlideShare is downloading. ×
0
For this project, an early 1900’s generator loading and storage facility,
and more recently, a popular Washington, DC nigh...
Stair                 Lower Level Resource Library




Existing Conditions
Atrium

         3
Legend

                                9   9
                                            7       7       7       7       ...
Basement Plan    3rd Floor Plan




                                  Roof Deck




2nd Floor Plan   Roof Plan




       ...
(New)
                                3rd Floor




                                (New)
                                ...
Foyer/ Reception   7
Designer’s Hub   8
Play Space




             Atrium

                      9
Play Space   11
Work Space




             Work Space

                          12
Work Space   13
1412 Eye Submisison Final
Upcoming SlideShare
Loading in...5
×

1412 Eye Submisison Final

239

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
239
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "1412 Eye Submisison Final"

  1. 1. For this project, an early 1900’s generator loading and storage facility, and more recently, a popular Washington, DC nightclub, was converted into office space for a growing architecture firm. The free standing build- ing, which sits in the center of a city block in downtown Washington, DC, required major renovation in order to adapt to its new use. Two mezza- nines were added within the building shell and the lower level was exca- vated in order to accommodate 75 staff on 4 floors. A central atrium was preserved and surrounded by a variety of meeting spaces, both formal and informal, to promote collaboration and a sense of community for the organization. The first floor of the atrium provides a setting where staff and visiting congregate and are able to manipulate furniture, walls and drapery to create spaces for small meetings or full town hall gatherings. Special consideration was given to meeting LEED and sustainable strate- gies with a main focus on energy conservation. The crumbling building shell was pointed-up and painted with an insulating paint on the interior to prevent infiltration and reduce heat transfer. Ultimately, what was seen a valueless interior-block building that sat vacant for ten years was trans- formed into a vibrant office building that benefited the organization and improved its surrounding neighborhood. 1
  2. 2. Stair Lower Level Resource Library Existing Conditions
  3. 3. Atrium 3
  4. 4. Legend 9 9 7 7 7 7 7 1 Foyer 2 Reception 3 “Confessional” 8 4 Coffee Bar 5 Town Hall 3 7 6 Conference Room 4 7 Work Area 5 6 2 8 Mail Area and Message Board 9 Restroom 7 7 7 7 7 1 Scale 01 2 5 Feet 1st Floor Plan 4
  5. 5. Basement Plan 3rd Floor Plan Roof Deck 2nd Floor Plan Roof Plan 5
  6. 6. (New) 3rd Floor (New) 2nd Floor (Existing) 1st Floor (Existing) Lower Level Section view through building 6
  7. 7. Foyer/ Reception 7
  8. 8. Designer’s Hub 8
  9. 9. Play Space Atrium 9
  10. 10. Play Space 11
  11. 11. Work Space Work Space 12
  12. 12. Work Space 13
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×