Your SlideShare is downloading. ×
  • Like
Rodney Wippenaar Pr Eng V1
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Rodney Wippenaar Pr Eng V1

  • 134 views
Published

A photographic slideshow of my CV

A photographic slideshow of my CV

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
134
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. MY CAREER THUS FAR...
  • 2. BUILDINGSMiddle East - BahrainI was on site on Marina Westproject for 8months in Budiya,Bahrain. It was the biggestproject at the time in Bahrain.See my CV for more details onmy involvement.
  • 3. BUILDINGSSaadiyat Island – AbuDhabi. February 2010 toJanuary 2011Here again I was on site,ensuring smooth flow ofconstruction works. Myrelationship building skills alsohelped greatly as I was able togain the respect of the AbuDhabi government inspector.Before he would often rejectwork, causing delays to theworks.
  • 4. BRIDGESSibaya InterchangeAssisted the Senior Engineerwith the design of this 4 span,post tensioned bridge over aNational highway in SouthAfrica, see details in my CV.
  • 5. BRIDGESResident EngineerOn site for 1 year as BridgeSuperintendent or ResidentEngineer as its known in SouthAfrica. I personally alsodesigned the 30m long post-tensioned beams.
  • 6. BRIDGESFire Damage ReportI was responsible for compilingthe damage assessment andrepair strategy report for a firedamaged bridge in Cape town.
  • 7. BRIDGESConstructionmanagement - DubaiI spent 7 months on site at theNad Al Sheba racecourseaccess roads. The project had atotal of 7 bridges and twoseparate contractors, DutcoBeatty Balfour and Afcons.
  • 8. BRIDGESConstructionmanagement - DubaiNad Al Sheba: The Main Bridge
  • 9. BRIDGESConstructionmanagement - DubaiInvestigating the snapping ofwires during tensioningoperations.
  • 10. BRIDGESConstructionmanagement - DubaiThe completed VIP bridge.
  • 11. Constructionmanagement– South AfricaConstructing a twin bridge nextto existing one. Piling inprogress, oscillator piles to adepth of 40m.
  • 12. Resolving bursting steel – arriving ata practical workable arrangement.This was also checked bycalculation.
  • 13. BRIDGESConstructionmanagement – SouthAfricaThe beams were 33m long andaround 64tons.