FactoryTalk VantagePoint EMI: 50 Minutes to Value
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

FactoryTalk VantagePoint EMI: 50 Minutes to Value

on

  • 261 views

If you had 50 minutes, a computer running FactoryTalk VantagePoint, ...

If you had 50 minutes, a computer running FactoryTalk VantagePoint,
and an information engineer, what could you do? In this session, the
instructor will lead you through solution creation on the fly. What types of ad-hoc analysis can you do? What types of content are easiest to develop? Could you really do a full report-package solution with FactoryTalk VantagePoint in the allotted time? Come see.

Statistics

Views

Total Views
261
Views on SlideShare
261
Embed Views
0

Actions

Likes
0
Downloads
18
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

FactoryTalk VantagePoint EMI: 50 Minutes to Value Presentation Transcript

  • 1. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. PUBLIC INFORMATION FactoryTalk® VantagePoint EMI 50 Minutes to Value
  • 2. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. The Customer Their Vision 2 Connectivity Plant Model Portal Excel Reporting Emailing Trending Mobile, secure… Targets Analyze by Order
  • 3. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. 3 Agenda Wrap-Up / Q&A Building the Solution (Demo) Our Approach Our Role Introduction
  • 4. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Your Role 4  You are an System Integrator, a Rockwell Automation® Delivery person, a Rockwell Automation Tech Consultant, or part of the customer delivery team tasked with executing the Proof of Concept (POC)
  • 5. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. The Customer Their Equipment 5 Common Equipment Common Properties Same at other facilities My Plant
  • 6. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Our Task is to Deliver the POC 6  We will have 50 minutes with the customer  Our goals are to :  Develop a plant model and demonstrate the value  Demonstrate using Trend with the Model  Develop an Excel based report generic for each Machine  Discuss how this is the foundation for their vision I can do this with VantagePoint
  • 7. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Our Approach FactoryTalk VantagePoint EMI: 50 Minutes to Value 7
  • 8. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Our Approach At a High Level 8 Data Connectivity and Shape Property Exploration Property Values Step 1: Mapping Requirements to Reality Step 2: Develop Solution Create Types Create Items Map Tags Demonstrate
  • 9. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Data Sources Review FactoryTalk VantagePoint EMI: 50 Minutes to Value 9
  • 10. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Data Sources Review What has been done so far? 10  FactoryTalk Systems have been installed and configured  FactoryTalk View Site Edition, FactoryTalk Transaction Manager, FactoryTalk Historian Site Edition, FactoryTalk VantagePoint EMI  FactoryTalk Transaction Manager is creating entries in a custom table  FactoryTalk Historian Site Edition is storing data  FactoryTalk VantagePoint EMI  Connected to the FactoryTalk Historian Site Edition  Review sample tags  Connected to the SQL Server with Order History  Mapped Types already created with Time Periods How does this list get refreshed? How did the tags get into VantagePoint?
  • 11. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation FactoryTalk VantagePoint EMI: 50 Minutes to Value 11
  • 12. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation 12  Think of what the end user wants to do  Typically find information based on some structure  Plant >> Line >> Equipment >> Property  What do we need to create types of?  Line  Work Station (Equipment)
  • 13. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation Work Station Type 13  Reference Properties  Status (Core.DiscreteTag)  Order – Current (Core.StringTag)  Parts – Good (Core.AnalogTag)  Parts – Reject (Core.AnalogTag)  Parts – Total (Connector.Incuity.Calculation.FloatTag)  Percent Good (Connector.Incuity.Calculation.FloatTag)  Target (Connector.Incuity.Calculation.FloatTag)  Order History (Connector.MsSql.MappedType) This is not in the list? Why is this not a collection? Where will we find this? Don’t forget to Re-order Why add this?
  • 14. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation Work Station Type 14  Inheritance  Base.Equipment  Icon  Core.ConnectorInsql  Collection Properties  Tags (Collection of Core.Tag)  Operations - None  Default Property - None Why do we inherit? What is the purpose? What else should we consider? What are the options?
  • 15. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation Work Station Type - Results 15
  • 16. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation Line Type 16  Reference Properties  Reports (Core.Folder)  Inheritance  Base.Location  Icon  Core.Production (87)  Collection Properties  WorkStation  Operations - None  Default Property - None Why is this a reference? Why do we need a Line Type? Why Base.Location? What is the purpose?
  • 17. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Type Creation Line Type - Results 17
  • 18. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Creating Items in the Model FactoryTalk VantagePoint EMI: 50 Minutes to Value 18
  • 19. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Creating the Work Stations and the Navigation Model 19  Create Folder MI02 under MyEnterprise.Demos.RSTechED  Create Line 1 as RSTechED.MI02.Line  Map Reports folder from System.Solutions.Demos.RSTechED.MI02.Content.Line 1  Create Filling Work Station as RSTechED.MI02.WorkStation  Map known items from FTHistorian  Map Order History Item SQL Connector  Create Percent Good Calculation Tag (Good / Total Parts)  Create Target Rate Calculation Tag (Fixed Value)  Add to the Tags collection  Validate Configuration using Trend Why use the Solutions Folder? Can I re-use these calculations? What can I put here?
  • 20. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Import the remaining items… 20  Import an ICP file which contains the configuration of the remaining Work Stations Why do it this way?
  • 21. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Line and Work Stations The Results 21
  • 22. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Creating Content FactoryTalk VantagePoint EMI: 50 Minutes to Value 22
  • 23. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Trending Showing the Results 23
  • 24. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Excel Showing the Results 24
  • 25. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Wrap-Up FactoryTalk VantagePoint EMI: 50 Minutes to Value 25
  • 26. 26
  • 27. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Where can I learn more? 27  Sessions  Introduction to FactoryTalk VantagePoint and Enterprise Manufacturing Intelligence  FactoryTalk VantagePoint EMI: Sneak Peek at What's Coming in v6.0  Reporting Best Practices for Production Information  Labs  FactoryTalk VantagePoint EMI Basic Lab: Building an Information System  FactoryTalk VantagePoint EMI Advanced Lab: Exploring the Possibilities  FactoryTalk VantagePoint EMI: Advanced Reporting  Come ask questions at the Mobility Experience booth
  • 28. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. We care what you think!  On the mobile app: 1. Locate session using Schedule or Agenda Builder 2. Click on the thumbs up icon on the lower right corner of the session detail 3. Complete survey 4. Click the Submit Form button 28 Please take a couple minutes to complete a quick session survey to tell us how we’re doing. 2 3 4 1 Thank you!!
  • 29. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. PUBLIC INFORMATION Questions 29
  • 30. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. www.rsteched.com Follow RSTechED on Facebook & Twitter. Connect with us on LinkedIn. PUBLIC INFORMATION Thank-you!