1. CURRICULUM VITAE
________________________________________________________________________
Name : Roald Kristoffersen
Date of Birth : 11.11.73
Nationality : Norwegian
Language : English
EDUCATION
1993 Course in Petroleum Production
1991 – 1993 2-years Technical school, Drilling Technical School
1991 Drilling course I
1990 – 1991 Maritime / Technical school, production and maintenance
1989 – 1990 Maritime / Technical school, production and maintenance
COURSES
Leiro part I & III (valid to 05/15)
Leiro II courses: PPCon
Statoil
Norsk Hydro
Saga
BP
97-Leak detection operator 1
Nitrogen operator I
Genius I
Pipefreezing operator I
Wessington Cryogenics Ltd, Basic Design Aspects of Cryogenic Vessel (Jan.98)
ISO 9001: 2000 (Mars 01)
EXPERIENCE
Jan 15 – present Reinertsen
Statoil- Åsgard Subsea Compression project – RFO Engineer
RFO lead for the compressor module installation
Feb 06 – Des 14 Nova Subsea AS
2013 – Present Statoil- Åsgard Subsea Compression project – RFO Engineer
2011-2013 RFO Lead Engineer and CR at the Tordis Flowline Replacement followed by Tordis
Jumper Replecement projects with overall responsible for the job design, planning,
execution on the the site and responsible for the contract.
2010 RFO Lead Engineer at the Åsgard Riser Project with overall responsible for the job
design, planning and execution on the site.
2009 RFO Lead Engineer at the Tordis Project with overall responsible for the job design,
planning and execution on the site.
2006 – 2009 RFO Engineer in following projects; Åsgard Riser Replacement, Gjøa, Tordis
umbilical and Langeled.
Nov 05 – Feb 06 Halliburton
Sr. Technical Professional – Field
20cb78b5-34ab-4348-ae95-785d50bd2ac4-150821220157-lva1-app6892.doc
Page 1 of 7
21.08.2015
2. CURRICULUM VITAE
________________________________________________________________________
Jan 98 – Nov 05 Norwegian Process Technology A.S.
Project Manager for Nitrogen Services.
Apr 95 – Jan 98 BJ Process & Pipeline Services
Operator / Shift Supervisor / Supervisor
Des 13 – present Åsgard Subsea Compression Project
RFO Technical lead Engineer
Nov 10 – Des 13 Tordis flowline and Tordis Jumper replacement project
RFO lead engineer including CR for the contract
Jun 10 – Nov 10 Åsgard transfer project
RFO Engineer
Feb 10 – Jun 10 Kristin riser replacement project
RFO Engineer
Okt 09 – Jan 10 Tordis re-ruting of G-85
RFO Lead engineer
May 09 – Sep 09 Åsgard Riser Replacement
RFO Engineer
Nov 08 – May 09 Gjøa Field Development project
RFO Engineer
Aug 08 – Nov 08 Statoil, Tordis
RFO Engineer
Feb 06 – Aug 08 Statoil, Langeled
RFO engineer
Sep 05 – Feb 06 Statoil, Snøhvit
Engineer
Prepare N2 / He Leak test procedures
May 05 – Sep 05 Statoil, Kristin
Engineer
CLT
Mar 05 – Apr 05 Kværner, 2 / 4 M
Engineer
CLT
Jan 05 – Mar 05 Kværner, 2 / 4 M
Engineer
Prepare N2 / He Leak test procedures
Sep 04 – Des 04 Statoil, Kristin
Supervisor
CLT
Apr 04 – Aug 04 Statoil, Kvitebjørn
Engineer
CLT
Jun 04 Hydro, Grane
20cb78b5-34ab-4348-ae95-785d50bd2ac4-150821220157-lva1-app6892.doc
Page 2 of 7
21.08.2015
3. CURRICULUM VITAE
________________________________________________________________________
Engineer
Nitrogen pumping
Mar 04 – Apr 04 Hydro, Oseberg D
Supervisor
Nitrogen pumping
Mar 04 Hydro, Brage
Engineer
CLT
Feb 04 Hydro, Njord
Engineer
CLT
Jan.04 Hydro, Brage
Supervisor
Nitrogen pumping
Jan.04 Hydro, Heimdal
Supervisor
CLT
Mar 03 – Nov 03 Hydro, Grane
Engineer
CLT
Jun 03 – Jul 03 Hydro, Oseberg Feltsenter
Supervisor
CLT
Jun 03 Hydro, Troll C
Supervisor
Nitrogen pumping
Jan 03 – Mar 03 Hydro, Grane
Engineer
Prepare N2 / He Leak Test procedures
May 02 Hydro, Heimdal
Supervisor
CLT
Nov 02 – Dec 02 Hydro, Grane
Engineer
Prepare N2 / He Leak Test procedures
Jun 01 Hydro, Oseberg Sør
Supervisor
CLT
May 01 – Jul 01 Kværner, Petrojarl 1
Engineer
CLT
Apr 01 Kværner, Tambar
Engineer
CLT
Feb 01 Kværner, Huldra
Supervisor
CLT
20cb78b5-34ab-4348-ae95-785d50bd2ac4-150821220157-lva1-app6892.doc
Page 3 of 7
21.08.2015
4. CURRICULUM VITAE
________________________________________________________________________
Jan 00 – Dec 00 Statoil, Åsgard B
Engineer
CLT
Jun 99 Transocean, Vest Vanguard
Supervisor
Nitrogen pumping
May 99 Statoil, Åsgard B M-54
Engineer
CLT
Apr 99 – May 99 Statoil, Åsgard B M-60
Engineer
CLT
Mar 99 Statoil, Åsgard B M-30
Engineer
CLT
Jan 99 – Feb 99 KOGN, Siri Field
Engineer
CLT
Nov 98 Statoil, Sleipner Field
Supervisor
N2 Pumping Incl. Leak testing
Sep 98 MWS, West Alpha
Supervisor
Nitrogen Pumping
Sep 98 Kogn, Siri
Engineer
CLT
Aug 98 MWS, West Alpha
Supervisor
N2 Pumping
Aug 98 Statoil, Sleipner A / T
Engineer
N2 Pumping
Jun 98 - May 98 Statoil, Gullfaks A
Supervisor
N2 Services
Apr 98 Esso, West Alpha
Supervisor
Gas Lift
Nov 97 – Dec 97 Maersk, Dan FF
Engineer
CLT
Sep 97 Norsk Hydro, Troll B
Supervisor
N2 Services, Incl. N2/He, Leak Testing
Aug 97 Norsk Hydro, Troll B
20cb78b5-34ab-4348-ae95-785d50bd2ac4-150821220157-lva1-app6892.doc
Page 4 of 7
21.08.2015
5. CURRICULUM VITAE
________________________________________________________________________
Supervisor
N2 Services, Incl. N2/He, Leak Testing
Aug 97 Statoil, Kollsnes
Supervisor
N2 Services, Incl. N2/He, Leak Testing
Jul 97 Norsk Hydro, Brage
Supervisor
N2 Services, Incl. N2/He, Leak Testing
Jun 97 Maersk, Grootint Holland, Dan FF
Supervisor
CLT
May 97 Statoil, Norne
Supervisor
CLT
Apr. 97 Statoil, Kollsnes
Supervisor
CLT
Mar 97 – Apr 97 BJ Services, Woodside, Perth, Australian
Shift Supervisor
CLT
Jan 97 Maersk, Harald
Shift Supervisor
CLT
Jan 97 Statoil, Heidrun
Supervisor
Gaslift
Dec 96 Maersk, Harald
Shift Supervisor
CLT
Nov 96 Maersk, Gorm
Supervisor
CLT
Oct 96 Statoil, Veslefrikk
Supervisor
CLT
Jul 96 – Sep 96 Statoil, Sleipner T
Shift Supervisor
CLT
Mar 96 – Jun 96 Saga, Snorre
Supervisor
CLT
Jan 96 – Feb 96 Statoil, Sleipner T
Shift Supervisor
CLT
Nov 95 Statoil, Sleipner A
Shift Supervisor
CLT
20cb78b5-34ab-4348-ae95-785d50bd2ac4-150821220157-lva1-app6892.doc
Page 5 of 7
21.08.2015