• Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
62
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. ANALISIS DE LA EMPRESA7 hrs efectivas = 1 turno pago operarios=K1=8$us Costo maquinaria= K2=12$usEtapa 1.- SELECCIÓN DEL MATERIAL (MANUAL)2 operarias (MUJERES) Tolerancia variable: Por estar de pie: 4tc1=45*0.95 = 42.75 Cuerpo encorvado: 3tc2= (98-45)*0.8 = 42.4 Peso 5 Kg: 2tc3= (148-98)*0.95 = 42.5 Atención visual de gran cuidado: 2 tn = 42.55 Muy aburrido: 2 13% ts = tn (1 + tolvar + tol ctte) ts = 42.55 (1 + 0.13 + 0.11) ts = 52.762 + ts = 56.762 * = 170.016 Tolerancia variable: Por estar de pie: 2Etapa 2.- TRITURADO O PICADO DE PLASTICO Peso 50 Kg: 581 maquina cap = 600Kg tMq = 45 Ruido de alto volumen: 5 65%1 operario (VARON) tOPcarga = 10 tnOP = 20 tOPdescarga = 10 ts = tn (1 + tolvar + tol ctte) ts = 20 (1 + 0.65 + 0.09) tsOP = 34.8
  • 2. ts = tOP + tMq = 34.8 + 45 = 79.8 = 79.8Etapa 3.- LAVADO DEL MATERIAL1 maquina cap = 300Kg tMq = 45 Tolerancia variable: 25%1 operaria (MUJER) tOPdescarga = 10 ts = tn (1 + tolvar + tol ctte) ts = 10 (1 + 0.25 + 0.11) tsOP = 13.6 ts = tOP + tMq = 35 + 13.6 = 48.6 = 97.2Etapa 4.- EXTRUCCION GRANULADO4 maquina cap = 150Kg tMq = 701 operarias (MUJER) tcam = 2 min Tolerancia variable: 48%tc1= (16 + 4 + 14)*0.8 = 27.2tc2= (10 + 7 + 10)*0.9= 24.3tc3= (9 + 6 + 10)*1 = 25 tn = 25.5 ts = tn (1 + tolvar + tol ctte) ts = 25.5 (1 + 0.48 + 0.11) ts = 40.545 2 = 2.598 3 tc = (top + tcam)* N
  • 3. tc = (40.545 + 2)* 4tc = 170.18 ts = 170.18 = 170.18Etapa 5.- EXTRUSADO DE POLITUBOS6 maquina cap = 100Kg tMq = 1.7 hrs = 102 Tolerancia variable: 30%1 operarios (VARON) tOPcarga = 0.12 hrs = 7.2 tnOP = 14.4 tOPdescarga = 0.12 hrs = 7.2tcam = 0.03 hrs = 1.8 min ts = tn (1 + tolvar + tol ctte) ts = 14.4 (1 + 0.3 + 0.09) ts = 20.016 100 Kg = 2 rollos 5 = 5.59 6 tc = (top + tcam)* Ntc = (20.016 + 1.8 )* 6tc = 130.896 = 130.896
  • 4. Etapa 6.- EMPAQUETADO (MANUAL) Tolerancia variable: tc1= (1 + 2 + 2 + 5)*0.85= 8.5 Por estar de pie: 2 tc2= (12 + 3 + 4 + 7)*0.55= 14.3 Iluminación muy inf. de lo adecuado: 2 Peso 50 Kg: 58 tc3= (28 + 4 + 4 + 7)*0.5 = 21.5 Ex monótono : 4 tn = 14.767 Muy aburrido: 5 71% ts = tn (1 + tolvar + tol ctte) ts = 14.767 (1 + 0.71 + 0.09) ts = 26.581 = 3187.967 Operación ts ta ⧣ A Mejoras Op ta Nt NR ts2 ta2 ⧣ M Op Seleccion 170.016 318.967 2 4 85.14 104.58 1.622 2 42.57 52.29 8 Triturado 79.8 318.967 1 1 79.8 104.58 1.52 2 39.9 52.29 2 Lavado 97.2 318.967 1 1 97.2 104.58 1.851 2 48.6 52.29 2 Granulado 170.18 318.967 1 3 88.44 104.58 1.68 2 44.22 52.29 6 Extrusado 130.896 318.967 1 2 104.58 104.58 1.992 2 52.29 52.29 4Empaquetado 318.967 318.967 1 4 79.74 104.58 1.519 2 39.87 52.29 8 Suma 30
  • 5. Análisis de costos Pago operarios=K1=8$us Costo maquinaria= K2=12$usEtapa 4.- EXTRUCCION GRANULADON1 =2N2 =3 CTM1= =26.71 $ CTM2= =29.07 $ ts = tOP + tMq = 40.545 + 70 = 110.545 = 110.545  Aumentando 1 Mq + 1 Opts = 110.545 * = 88.44Etapa 5.- EXTRUSADO DE POLITUBOSN1 =5N2 =6 CTM1= =26.44 $ CTM2= =27.99 $ts = tOP + tMq = 20.016 + 102 = 122.016 = 122.016
  • 6.  Aumentando 1 Mqts = 122.016 * = 104.58Etapa 1.- SELECCIÓN DEL MATERIAL (MANUAL)1 Op 318.972 Op 159.483 Op 106.324 Op 79.74Etapa 6.- EMPAQUETADO (MANUAL)170.29 2 Op1173.53 3 Op85.145 4 Op
  • 7. RESULTADOS.-Bajo las condiciones actuales el tiempo estándar por ciclo calculado es de 318.97a) El tiempo estándar por rollo de 50 metros real para el cálculo de plazos de entrega es:26.58b) La producción estándar actual por jornada es 12 rollosc) El nuevo tiempo estándar real por ciclo es de: 105d) El tiempo mejorado por rollo de 50 metros real para el cálculo de plazos de entrega es:8.75e) La máxima producción estándar método propuesto por jornada es: 144 rollosf) Número total de trabajadores método propuesto en todos los turnos: 30 trabajadores