Botswana electricity industry has challenges in meeting its energy needs. Firstly, the country can hardly meet its peak power demand and, secondly, the country relies heavily on power supply from its neighbouring countries. However, southern Africa is experiencing an increasing power supply deficit, leading to shortages of power for trading. After a slump in 2009, which was due to the global economic crisis and a consequent drop in diamond exports, Botswana electricity demand recovered strongly in 2010. Despite stagnating in 2011, demand is expected to continue growing from 2012 to 2020. Hence, Botswana needs to expand its power generation capacity, as well as reinforce its transmission and distribution network.
Abdominal Aortic Aneurysms Global Clinical Trials Review, H1, 2013
Update of the Botswana Electricity Industry
1. Find Industry reports, Company profiles
ReportLinker and Market Statistics
>> Get this Report Now by email!
Update of the Botswana Electricity Industry
Published on March 2012
Report Summary
Botswana electricity industry has challenges in meeting its energy needs. Firstly, the country can hardly meet its peak power demand
and, secondly, the country relies heavily on power supply from its neighbouring countries. However, southern Africa is experiencing
an increasing power supply deficit, leading to shortages of power for trading. After a slump in 2009, which was due to the global
economic crisis and a consequent drop in diamond exports, Botswana electricity demand recovered strongly in 2010. Despite
stagnating in 2011, demand is expected to continue growing from 2012 to 2020. Hence, Botswana needs to expand its power
generation capacity, as well as reinforce its transmission and distribution network.
Table of Content
Update of the Botswana Electricity Industry (From Slideshare) Page 1/3
2. Find Industry reports, Company profiles
ReportLinker and Market Statistics
>> Get this Report Now by email!
Fax Order Form
To place an order via fax simply print this form, fill in the information below and fax the completed form to:
Europe, Middle East and Africa : + 33 4 37 37 15 56
Asia, Oceania and America : + 1 (805) 617 17 93
If you have any questions please visit http://www.reportlinker.com/notify/contact
Order Information
Please verify that the product information is correct and select the format(s) you require.
Update of the Botswana Electricity Industry
Product Formats
Please select the product formats and the quantity you require.
Site License--USD 6 000.00 Quantity: _____
Site License+Hardcopy--USD 6 500.00 Quantity: _____
Corporate License--USD 7 500.00 Quantity: _____
Contact Information
Please enter all the information below in BLOCK CAPITALS
Title: Mr Mrs Dr Miss Ms Prof
First Name: _____________________________ Last Name: __________________________________
Email Address: __________________________________________________________________________
Job Title: __________________________________________________________________________
Organization: __________________________________________________________________________
Address: __________________________________________________________________________
City: __________________________________________________________________________
Postal / Zip Code: __________________________________________________________________________
Country: __________________________________________________________________________
Phone Number: __________________________________________________________________________
Fax Number: __________________________________________________________________________
Update of the Botswana Electricity Industry (From Slideshare) Page 2/3
3. Find Industry reports, Company profiles
ReportLinker and Market Statistics
>> Get this Report Now by email!
Payment Information
Please indicate the payment method, you would like to use by selecting the appropriate box.
Payment by credit card Card Number: ______________________________________________
Expiry Date __________ / _________
CVV Number _____________________
Card Type (ex: Visa, Amex…) _________________________________
Payment by wire transfer Crédit Mutuel
RIB : 10278 07314 00020257701 89
BIC : CMCIFR2A
IBAN : FR76 1027 8073 1400 0202 5770 189
Payment by check UBIQUICK SAS
16 rue Grenette – 69002 LYON, FRANCE
Customer signature:
Please note that by ordering from Reportlinker you are agreeing to our Terms and Conditions at
http://www.reportlinker.com/index/terms
Please fax this form to:
Europe, Middle East and Africa : + 33 4 37 37 15 56
Asia, Oceania and America : + 1 (805) 617 17 93
Update of the Botswana Electricity Industry (From Slideshare) Page 3/3