Sugar Cogen Presentation on PPP Model Financial Analysis
1. PRESENTATION
ON SUGAR COGEN
R.K.KAUL
Chief Energy Business
Saraya Industries Limited
New Delhi
rkkaul99@rediffmail.com ,rkkaul99@gmail.com
(M) 9810345642,
PUBLIC
PRIVATE
PARTNERSHIP
SUGAR COGENERATION ON BOOT BASIS
ISSUES , TECHNICAL & FINANCIAL ANALYSIS
``ONLINE ``
2. CONTENTS
ENERGY RESOURCES & SCENE IN INDIA
COGEN / TRI GEN BASIC DEFINITION / RANKINE CYCLE
PPP MODEL GIVE AND TAKE
BOOT MODEL –PUBLIC PRIVATE PARTNERSHIP
BASIS OF PROJECTS EVALUATIONS- THE MILLS
SUGAR BASE DATA – OPERATIONS-----REAL TIME ANALYSIS
TECHNOLOGY / HEAT MASS BALANCE / POWER BALANCE/STEAM BALANCE
REVENUES / COSTS / PBDIT / RETURNS/CASH FLOWS
SUMMARY / WAY FORWARD
3. ENERGY RESOURCES
BAGASSE
OTHER BIOMASS
RICE STRAW
WHEAT STRAW
MUSTARD HUSK
SUBABOOL
CANE TRASH
WOOD CHIPS
COCONUT SHELL
COAL INDIAN
COAL IMPORTED
IN SUGAR INDUSTRY
TOTAL RELIANCE ON
SUGAR OPERATIONS
NOT POSSIBLE
4. NATIONAL ENERGY DATA
POWER GENERATION RESOURCES-
MW
102,452.75
36,863.00
4,560.00
15521
THERMAL
HYDRO
NUCLEAR
RES
POWER GENERATION RESOURCES-
MW
93114
36158
4120
12194
THERMAL
HYDRO
NUCLEAR
RES
31-Mar-15
178341 69.75%
154170 60.30%
22971 10.89%
1200 0.57%
40867 19.37%
4780 2.27%
31692 15.02%
255680
6. STATUS
ENERGY NEED STANDS AT 2.75-3.00 LAC MW- NEXT 2-4 YRS
SUPPLY STANDS AT 1.5 LAC MW
GROWTH RATE >7.0 to 8.0 %
DEMAND SUPPLY GAP WILL CONTINUE / INCREASE
PRESSURE ON SAVING ENVIRONMENT
SIZE OF BUSINESS BIG
BUSINESSES KEEN TO HAVE A CUT OF THE BIG PIE
RENEWABLE POWER – THRUST WORLD OVER
HAVES & HAVE NOTS - GOVT/COOP/ PVT SEC
OVERALL ENVIRONMENT CONDUCIVE
PVT . SECTOR READY TO INVEST
BOOT IS
AN
OPTION
SUGAR
COGEN
HAS
POTENTIAL
7. SUGAR COGEN STATUS
Total Sugar Mills 526 (OP) / 695(INST)
Total TCD 2.5 Mn TCD
Cogeneration potential – 8000 to 10000 MW
Present Power Export - 3500 MW
BALANCE POTENTIAL – 3000 TO 4000 MW
INVESTMENT OPPORTUNITY- 15000 CR
RS
8. PP MODEL BASICS…….
BOOT – BUILD OWN OPERATE
TRANSFER
ITS GIVE AND TAKE MODEL
CPMPLETE TRANSPARENCY
ADMINISTRATIVE / TECHNICAL HELP
ACCURATE MEASUREMENTS
TIMELY DOCUMENTATION
9. COGEN / TRIGEN DEFINED
Cogen is Simultaneous generation and use of electricity and heat
Tri Generation is simultaneous generation and use of electricity , heat ,
and cooling
Both far superior in efficiency as compared to independent generation
Should be used where all forms of energy are required
ITS LIKE CO-EDUCATION –SAME TEACHER
( ENERGY)
10. PPP - BOOT ISSUES
POLITICAL WILL
ADMINISTRATIVE / BEUROCRATIC WILL
LOCAL MILL BOARD WILL
INVESTORS WILL
PROJECT DEVELOPERS WILL
PROJECT VIABILITY- FUEL / PRICING
11. PPP- BOOT MODEL:
Operates its own sugar plant
as usual
Invites Project developer to
setup cogen project
Give designated land-lease
free of cost
Gives Free water
Gives Free Bagasse
All legal
Commits to set up cogen
Does technical & legal deligence
Brings all capital at its own cost
and risk
Gives power & steam free for mill
operations
Provide capital for mill
modernisation/capacity
enhancement
Gets all legal clearances
The Mill The Project developer
12. PPP- BOOT MODEL:…cont..
Allows Connectivity to system
Agree on mill modernisation-work as
well as costs
Terms if steam/power norms not
followed
Pass Board resolutions as per need
Agree on concessation period,
revenue sharing/royalty on cane
crush
Complete project development
including design, order, erection
and commissioning
Procures balance of fuel
Share revenue as per agreement
Operate plants to optimum
capacity
Hands over the plant to mill at
ZERO COST after concessation
period
The Mill The Project developer
13. BOOT ISSUES CONT……
GUARANTEE FOR BAGASSE AVAILABILITY-MINIMUM QUANTITY
MINIMUM DAYS OF SEASON OPERATION
EXCESS POWER / STEAM DRAWN BY SUGAR PLANT
REVENUE SHARING v/S CANE CRUSH ROYALTY
PRICE FOR EXTRA STEAM / POWER- PSEB /EXCHANGE RATES
FUNDING FROM SDF – GOVT. HELP/ POLICY CHANGE
SENSITISING BANKING FOR THESE PROJECTS-DEDICATED FUNDS
MORTGAGING OF ALLOTED MILL LAND
BOOT PERIOD – 15/20/25/40 YEARS
MORATORUIM FOR RETURNS TO SUGAR 2-3 YEARS
ENHANCED RATE OF POWER TO GRID – some development -CE
TIME FOR IMPLEMENTATION
INTEGRATION OF SUGAR / COGEN/ CAPACITY ENHANVEMENT –
PAYMENT GUARANTEE BY GRID
14. BASIS OF EVALUATION
MILL PERFORMANCE OVER LAST 6-8 YEARS
ACTUAL CANE CRUSH AND BAGASSE AVAILABILITY
NO OF DAYS OF OPERATION IN A YEAR - SEASON & OFF SEASON
PRESENT / FUTURE STEAM & POWER CONSUMPTION
COGEN & MODERNISATION COST
COST OF MONEY, RETURNS TO SUGAR PLANT
SELLING POWER COST & CDM / REC BENEFITS
TECHNOLOGY / PLANT PARAMETERS / INTEGRATION
POWER OFFTAKE / CONNECTIVITY/DISTANCE TO GRID SUB STATION
STANDARDISATION OF PLANT CONFIGURATION
MILL MODERNISATION POTENTIAL
PROJECT DEVELOPERS INVESTMENT PHILOSOPY
INVESTORS RISKS INVOLVED
23. BASIC RANKINE CYCLE
There are four processes in the Rankine
cycle, each changing the state of the
working fluid. These states are identified
by number in the diagram to the right.
Process 1-2: The working fluid is pumped
from low to high pressure, as the fluid is
a liquid at this stage the pump requires
little input energy.
Process 2-3: The high pressure liquid
enters a boiler where it is heated at
constant pressure by an external heat
source to become a dry saturated
vapor.
Process 3-4:
The dry saturated vapor expands through a turbine, generating power. This decreases the te
Process 4-1: The wet vapor then enters
a condenser where it is cooled at a
constant pressure and temperature to
become a saturated liquid. The pressure
and temperature of the condenser is
fixed by the temperature of the cooling
coils as the fluid is undergoing a phase-
change.
35. ADVANTAGES TO SUGAR PLANT
1. The Cooperative Mill gets complete power plant at ZERO cost
2. Mill gets modernized in terms of power & Steam consumption
3. Plant gets reliable power steam –Improved quality and better
efficiency
4. Improvement in crushing capacity –improved revenues
5. Additional revenue by way of sharing/Royalty on cane crush
6. Improved Pollution Control with ESP
7. Employment to Local people
8. Better returns to cooperative members
9. Other biomasses used- revenue to farmers
10. Environment protection – as crop residue may not be burnt
36. SUMMARY WAY FORWARD
NEED FOR MORE CLEAN POWER IN THE COUNTRY
RENEWABLE ENERGY FOCUS
POLITICAL/ADMINISTRATIVE /LOCAL ``WILL`` REQD
BOOT A WIN WIN PROPOSITION IF IMPLEMENTED
PROPERLY ..TRANSPARENCY …UNDERSTANDING
BOOT PROCESS TO BE STANDARDISED
FEASIBILITY ANALYSIS UTMOST IMPORTANT
ALL ISSUES PRE DOCUMENTED & AGREED
GO FOR IT WITHOUT LOOSING TIME