Transnet Supplier Development Plan - Presentation Transcript
Transnet Supplier Development Plan
Compiled in terms of the DPE Competitive Supplier Development
Programme
February 2008
Supplier Development Plan
Table of Contents
APPENDICES ...............................................................................................................3
1. Definitions.............................................................................................................4
2. Executive Summary .............................................................................................5
Figure 1: CSDP Planning framework provided by DPE.................................................5
3. Background: Moving from NIPP to CSDP ..........................................................7
Process of developing Transnet’s first SDP ................................................................. 8
Figure 2: CSDP in Context ........................................................................................15
Governance and Policy (putting in the right Controls) ................................................ 16
4. CSDP Programme’s five-year Objectives.........................................................18
Objective 1: CSDP Delivery ....................................................................................... 18
Objective 2: Increasing SDP scope and detail ........................................................... 18
Objective 3: Supply Management skills improvement ................................................ 18
Objective 4: Supply Management capacity improvement ........................................... 18
Figure 3: SSM Critical Path.......................................................................................20
Figure 4: The Capability Maturity Curve ....................................................................21
Figure 5: The ICCPP process ....................................................................................23
5. Spend Analysis (detailed 5 years).....................................................................24
Figure 6: Spend Break down.....................................................................................24
Capex Breakdown ..................................................................................................... 25
Figure 7: Estimated Capex Commodity Spend Breakdown .........................................26
6. CSDP Approach and Opportunity Identification..............................................27
a) Developing the Approach...................................................................................... 27
Figure 8: CSDP Approach – Determining Opportunities.............................................28
b) Identify the Opportunities...................................................................................... 30
Figure 9: The Types of Opportunities .........................................................................30
Figure 10: Determining Degrees of Complexity .........................................................31
Figure 11: Initiative Ranking.......................................................................................32
Figure 12: Transnet Spend 2008 - 2012 ....................................................................33
7. Supplier Industry Analysis ................................................................................34
a) Macro perspective ................................................................................................ 34
Figure 14: Global Competitiveness Index ...................................................................34
Figure 15: SA’s list of most problematic factors for doing business .............................35
Figure 16: African Regional Competitiveness Ranking ...............................................37
Page 2 of 91
Supplier Development Plan
b) Micro perspective.................................................................................................. 37
Figure 17: Market Research on OEMs of Ship to Shore Cranes .................................40
Figure 18: KVD tree for Ship to Shore Cranes ...........................................................41
8. Priority Interventions and Associated Sectors ................................................42
Figure 19: CSDP Phased Approach ...........................................................................42
Phase 0 – Feasibility and Development Stage: Pilot Interventions............................. 45
Figure 21: CSDP Phase 0 Initiatives ..........................................................................47
Phase 1 – Priority Areas: Rolling Stock and Port Equipment...................................... 48
9. Key Performance Indicators..............................................................................50
Figure 22: CSDP Continuous Improvement Map ........................................................50
10. High-level implementation plan.........................................................................53
a) Internal Mobilisation plan ...................................................................................... 53
Figure 23: High Level Plan.......................................................................................53
Figure 24: The Supplier Development Value Chain ...................................................54
b) Change Management Programme (CMP).............................................................. 55
Figure 25: Internal Stakeholder Management ............................................................56
Figure 26: Continued Industry Collaboration post SDP development ........................57
11. CONCLUSION .....................................................................................................60
APPENDICES
A) Spend group specifics
B) Comparison of NIPP to CSDP
C) AS IS – TO BE tables for:
• Transnet organisational changes; and
• Supplier behavioral changes
D) NIPP Obligations
E) Guiding Principles in developing Transnet’s CSDP
F) Steps in the approach to CSDP opportunity identification
G) National Competitiveness Balance Sheet: South Africa
H) Competitiveness Roadmap 2007 to 2050
I) Frequently Asked Questions
Page 3 of 91
Supplier Development Plan
1. Definitions
ASGI-SA refers to Accelerated Shared Growth Initiative – South Africa, a national shared
growth initiative to halve poverty and unemployment by 2014.
BBBEE refers to Broad-Based Black Economic Empowerment
Capex refers to Capital Expenditure
Copex refers to Operational Expenditure which is capitalised
CSR refers to Corporate Social Responsibility which a program undertaken by
businesses to ensure that
MCIPS refers to Master of Chartered Institute of Purchasing and Supply (CIPS), a
recognised degree in SM
NVA refers to National Value Add which is a fundamental KPI of the programme
OEM refers to Original Equipment Manufacturers who own the intellectual property
rights and patents for the equipment which they sell and service
Opex refers to Operational Expenditure
SM refers to Supply Management, the function at Transnet which provides
procurement, inventory and logistic services
SOE refers to State Owned Enterprise which is a self-sustaining business that will
manage their own economic interests and ensure profitable returns and report to
the government shareholder department.
SPAID refers to Support Programme for Accelerated Infrastructure Development,
affiliated with the office of the president
SSM refers to Strategic Supply Management which is a corporate function providing a
centre of excellence service to SM leadership
UK refers to the United Kingdom
WEF refers to World Economic Forum
Page 4 of 91
Supplier Development Plan
2. Executive Summary
The Department of Public Enterprises (DPE) established a Competitive Supplier Development
Programme (CSDP) , which involves “procuring in such a way as to increase the competitiveness,
capacity and capability of the local supply base, where there are comparative advantages and potential
competitive advantages of local supply” (DPE draft Practice Note on CSDP, December 2007).
The ultimate goals of the CSDP are:
• to contribute to the ASGI-SA aims of increasing economic growth, employment creation, skills
development and BBBEE;
• to develop local industries to supply participating SOEs with high-quality, globally-competitive
goods and services;
• to improve the quality, efficiency and cost-effectiveness of the services provided by the SOEs, as
a result of their obtaining more-competitive goods and services from local suppliers; and
• to improve the competitiveness of the SOEs as a result of procurement savings from engaging
innovative, responsive and more competitive suppliers.
When Transnet elected to participate in the programme, the DPE provided it with a CSDP planning
framework which supports internal organisational aspects. The framework also has an external change
management focus, based on extensive consultation with the supply industry and sector.
Figure 1: CSDP Planning framework provided by DPE
Page 5 of 91
Supplier Development Plan
Internal process steps in Transnet’s SDP development
• An internal spend analysis (refer to Part 5) was conducted with a planning horizon of five years.
This analysis was followed by the identification of core spend commodities that might
appropriately be targets for CSDP-related supplier development interventions.
• Several suitable pilot initiatives were identified and the lessons derived from investigations of
these localisation opportunities were documented. This was then used to create a prototype for
the development of Transnet’s CSDP approach (refer to Part 6) of a multi-phased rollout. Rolling
Stock and Port Equipment were identified as the Phase 1 priority areas.
• An analysis (refer to Part 7) was carried out of the rolling-stock and port-equipment supply
industries.
• This formed the basis for identifying Transnet’s priority interventions linked to associated sectors
(refer to Part 8) and was included in a high-level implementation plan (refer to Part 10).
• Finally, Transnet’s five-year CSDP programme objectives (refer to Part 4) were measured against
the relevant Key Performance Indicators (KPIs) as contained in Part 9.
External process steps in Transnet’s SDP development
The priority interventions contained in Part 8 of this SDP document were presented at a second round
of discussions with industry, represented by a number of industry associations and interested
government stakeholders, including DTI, Department of Science & Technology (DST) and the Industrial
Development Corporation (IDC), in February, 2008.
The first consultative session took place in November 2007. Feedback from the second consultation
session was used in compiling this final SDP.
Transnet’s finalised first SDP was submitted to the Minister of DPE by the end of February 2008 for
approval, after which it will be implemented.
Transnet’s long-term aim in applying the CSDP will be to localise the supply chain of imported
manufactured goods or imported services to a reasonable level, while promoting local industries and
South Africa as an off-shore site of choice for OEMs and multi-nationals’ procurement personnel.
A local supply chain of previously-imported manufactured goods or services may not necessarily result
in direct cost reduction, but it should result in lower transport costs, shortened lead times and better
control of quality. It will also have a direct impact on job creation, economic development and
heightened awareness of South African manufacturing capability.
However, it is essential that all stakeholders understand that, while an ultimate goal of a reasonably
localised supply chain is hugely beneficial to Transnet, localisation will not be done at the expense of
quality or of asset reliability and it will not be at premium cost. The “C” of CSDP stands for competitive
and, as such, is aimed at attracting local suppliers who demonstrate the characteristics that will attract
positive global attention and not at those who participate in collusion or monopolistic practices.
NOTICE: Transnet must at all times balance the disclosure of information to supplier industries with
the requirements of the group’s commercial processes. Public disclosure to suppliers, industry
associations and government stakeholders must be grounded in sufficient facts to make the information
relevant to an industrial sector without disclosing specific purchase details prior to undertaking tender
activities. Any type of expansion is ALWAYS at the risk of the supplier within an industry sub-
sector and as such, Transnet will not assume responsibility for any activity that a supplier may
independently undertake based on this strategy or on public statements about CSDP.
Page 6 of 91
Supplier Development Plan
3. Background: Moving from NIPP to CSDP
Transnet’s capital expenditure (capex) over the next five years will be at an unprecedentedly high level.
This will require the focus of many diverse group resources to ensure that expenditure targets are
achieved successfully. It bears stating that meeting these capex targets is of critical importance to the
country. Failure to meet the capex targets may result in infrastructure constraints that hamper the
achievement of government’s overall growth initiatives and Transnet’s own service improvements.
However, local supplier industries have lost key capabilities and skills as a result of the drop in capital
expenditure in recent decades, and they have not adequately invested in plant and technology to meet
the latest expansion targets of SOEs and ASGI-SA. This lack of capacity has in part prompted the need
for change.
The CSDP replaces the National Industrial Participation Programme (NIPP), which is an import-offset
programme (for government agency expenditure) managed by the Department of Trade and Industry
(DTI). Under the NIPP programme all imports costing more than $10 million, require the supplier to
work with the DTI to invest the equivalent of 30% of the value of the purchase in a non-related industry.
Since inception of the programme ten years ago, the DTI has managed the obligations of seven
Transnet suppliers (see Appendix D for details of Transnet suppliers’ undischarged R1.189 billion NIPP
obligations).
Transnet GCE Maria Ramos formally notified the DPE that the group wishes to participate in the CSDP
with the result that Transnet’s suppliers of imported manufactured goods or services are no longer
required to participate in the NIPP for tenders issued after February 2007.
The overall goals of the CSDP are:
• to contribute to the ASGI-SA aims of increasing economic growth, employment creation, skills
development, and BBBEE;
• to develop local industries to supply the SOEs with high-quality, globally-competitive goods and
services;
• to improve the quality, efficiency and cost-effectiveness of the services provided by the SOEs, as
a result of their obtaining more-competitive goods and services from local suppliers; and
• to improve the profitability of the SOEs as a result of savings from sourcing from innovative,
responsive and more-competitive suppliers.
Each SOE participating in the CSDP must produce a Supplier Development Plan (SDP). The three
participating SOEs: Transnet; Eskom; and the Pebble Bed Modular Reactor (PBMR) are required to
submit their first SDPs for approval by the Minister of DPE between the end of February and June
2008, having first participated in extensive external consultation on these SDPs. The aim of the supply
industry and sector consultation is to share an ‘open window’ on participating SOEs’ opportunity areas
for local-supplier development. It is also intended as a forum to identify industry perspectives on matters
such as:
• comparative advantage;
• supplier development areas of interest to
- local industry: based on the local supply base’s core competences; and/or
- government: based on possible linkages to sectoral development plans for improving
sectors’ productivity and competitiveness.
Page 7 of 91
Supplier Development Plan
Process of developing Transnet’s first SDP
This document is Transnet’s first SDP and it was compiled in accordance with the timeframes and
framework set out in the DPE’s “Introduction to the CSDP” publication, as depicted in Figure 1 above.
Transnet’s development process involved internal organisational aspects (detailed below). It also has an
external change-management focus deriving from Transnet’s participation in the process of supply
industry and sector consultation as facilitated by DPE.
• Internal process steps in Transnet’s SDP development
- An internal spend analysis (refer to Part 5) was conducted with a planning horizon of five
years. The analysis was followed by the identification of core spend commodities that are
suitable targets for CSDP-related supplier-development interventions.
- Nine suitable pilot initiatives were identified and the lessons derived from the investigations
of these localisation opportunities were documented. This was then utilised to develop a
prototype for the development of Transnet’s CSDP approach (refer to Part 6) of a multi-
phased rollout, with rolling stock and port equipment as the Phase 1 priority areas.
An analysis (refer to Part 7) of rolling stock and port equipment supplier industries was
carried out and formed the basis for identifying Transnet’s priority interventions linked to
associated sectors (refer to Part 8), captured in a high-level implementation plan (refer to
Part 10).
• External process steps in Transnet’s SDP development
- The priority interventions contained in Part 8 of this Draft SDP document will be the subject
of a second round of discussions with industry, represented by a number of industry
associations and interested government stakeholders, including DTI, Department of Science
and Technology (DST) and the Industrial Development Corporation (IDC). The first
consultative session took place during November 2007. Feedback from the second
consultation session will be used in compiling the final document.
- Transnet’s finalised first SDP will be submitted to the Minister of DPE by the end of February
2008 for approval, after which the programme will be implemented.
The timely and effective roll-out of the capex programme is the catalyst that helps Transnet to positively
impact the South African economy by developing competitive national supplier industries. For this to
occur, Transnet developed its first SDP in such a way that it supports and ensures that the group’s
capex will be leveraged effectively so as to assist Transnet’s South African suppliers to increase their
capacity and capability to compete successfully both in local and in global markets. Transnet’s
overarching goal in participating in the CSDP is to localise the supply chain of its imported
manufactured goods or services at a reasonable level, while promoting local industries and South Africa
as an off-shore site of choice for OEM and multi-national procurement personnel.
Challenges to CSDP implementation
However, Transnet faces serious challenges in terms of the implementation of the CSDP. We are in
uncharted territory not previously attempted in South Africa.
Business Unit challenges:
• Lack of long-term forecasting on requirements, which causes instability of future demand to local
suppliers;
• Balancing aggressive timelines on the capex programme with a medium-term supplier-
development programme; and
Page 8 of 91
Supplier Development Plan
• Ownership of the supplier relationship (including engagement) is often not in the hands of Supply
Management.
Supply Management challenges:
• Lack of sufficiently-trained SM staff with the necessary skills and capacity;
• Lack of resources and time to develop fully the governance, policies and procedures needed to
have an effect on the currently available opportunities;
• Pressure by interested stakeholders to implement “all” of the deals “immediately”;
• The need to integrate the CSDP into a robust procurement process that balances the need to
provide adequate information to suppliers against the need to maintain the integrity of the tender
process; and
• Developing a guideline for evaluation of a supplier’s CSDP proposal to avoid subjective
adjudication that might lead to an error in choosing one development proposal over another and
that leads to an inappropriate tender award.
Supplier challenges:
• Tendency of the traditional supply base to take a narrow view of the relationship (collusion, sole
supply, entrenched with personnel outside of the Supply Management function, etc.);
• Immaturity of the local supply base, which has an entitlement mentality (the “right” to deal with
Transnet) without having the necessary technical expertise; and
• To change the belief that local suppliers should be chosen in preference to all other suppliers
regardless of cost (or being given confidential information during tenders to “match” prices), with
a view to becoming competitive.
While Transnet fully understands the need for and benefits of Supplier Development, caution is needed
when implementing this new approach.
As with any new process, if the basics are not in place to support the personnel undertaking the activity,
it will most probably fail. In this instance, all Supply Management basics are not yet in place (refer to
Capacity and Capability Building), but the timelines of the capex programme require the immediate and
concurrent rollout of CSDP. As such, this strategy is designed to ensure that Transnet can mitigate the
risks associated with these SM basics not yet being fully in place, while at the same time deploying
people with the more-advanced skills and judgment needed to implement the plan.
Therefore, it is important that, in participating in the CSDP, Transnet must ensure that:
• Deals are:
in the interests of Transnet’s final customers through consciously ensuring a positive overall
-
impact on the national economy; and
not solely based on the “number” of CSDP business cases per annum, but rather focused on
-
optimal value delivery on targeted capex acquisitions.
• SSM:
supports only those local suppliers who display the appropriate partnership attitude (defined
-
in Appendix C); and
utilises its resources effectively by (for example) dovetailing with current capital procurement
-
activities;
• SSM does not:
Page 9 of 91
Supplier Development Plan
create unrealistic entitlement expectations within the local supplier industry through
-
unsupported claims or lack of coherency on long-term expenditure or projects;
jeopardise the competitiveness, fairness and transparency of the bidding process*; and
-
violate the Public Finance Management Act (PFMA) and other applicable legislation and / or
-
governance practices in engaging with suppliers.
(*The dilemma is balancing two divergent needs: one for controlling the timing of the release of market
information to ensure a fair and equitable tender process, while at the same time providing timeous
information to ensure that local markets can respond to demand).
a) What needs to change
Within Transnet, the SM function, specifically procurement, has been given the primary
responsibility for managing the Supplier Relationship. Historically, however, SM has usually only
been involved in the evaluation, selection (if not already determined by the business end-users),
and award of business. In world-class organisations, SM is involved in: analysis, identification,
evaluation, selection, development, monitoring, dispute resolution and exit. The closure of this
gap is a prime concern of Transnet for ensuring good governance as well as successful
implementation of the CSDP.
The impact of this is that Transnet’s SM staff do not have the capacity or capability to deal with
medium to complex Supplier Development deals. While there are pockets of expertise within the
organisation, there has not been a concerted effort at developing or utilising these (and other
new) skills. This is in part due to the fact that:
• Supplier Development is an advanced skill in Supply Management and its positive impact has
only recently been understood by North American and European practitioners. The South African
market is usually 5 – 10 years behind in the ability to apply new skill sets;
• Transnet’s engineers and operations personnel still have excessive involvement in the
procurement process and, contrary to group policy, have often, made a commitment to the
supplier prior to award. This, in its turn, reduces Transnet’s leverage to get additional
concessions from the supplier to do more than simply provide the goods and services contracted
for;
• Often, SM is not informed of pending expenditure and is treated as a “rubber stamp” for contracts
and purchase orders. Transnet must change the focus of key personnel to ensure that SM is
viewed as the owner of the process and must be included in all purchases. However, until the SM
staff capability is sufficiently uplifted, this will require a major change effort within the organisation.
• In addition, Transnet does not have a consolidated view of total spend across all business units
which makes analysis difficult;
• The concept of “triple bottom line” and Corporate Social Responsibility (CSR) is not generally
appreciated in South Africa to the level that as it is in other global markets. This means that
Transnet has not understood how to leverage this requirement in our dealings with off-shore
suppliers; and
• Transnet SM staff members struggle to meet the day-to-day activities within the aggressive
timeframes and required governance that must be accommodated as part of Public Procurement
policies. Specialised deals and long-term benefits realisation are often the casualties of this need
for compliance.
To help overcome the challenges of the CSDP and other Supplier Development and Management
activities, a comprehensive set of change-management activities will be implemented internally and
outside Transnet, as detailed in Part 3.
Page 10 of 91
Supplier Development Plan
b) Case for Change – Benefits
The CSDP, with sufficient market information and skills to implement correctly, will have the following
benefits for Transnet:
• A measurable impact on National Value Add (from reduced imports and increased exports);
• A marked improvement in sources of supply (from improved cost, availability and quality
perspectives);
• An increased awareness of spend, suppliers as partners, applicable industries and localisation
opportunities;
• A reduced dependency on imports and exposure to foreign exchange fluctuations; and
• An improved capability and capacity among Transnet staff with an initial focus on SM staff. In the
short term this should enable the effective development and implementation of localisation
initiatives and should eventually set an example for other SM professionals, both in the public and
in the private sectors.
c) Transformation Required
Transnet has embarked on a significant turn-around in all aspects of its business, under four points:
efficiency and effectiveness; balance sheet restructuring, risk and governance; and human capital. This
transformation has required significant commitment and change among our staff. While implementing
an effective CSDP and other government growth initiatives touches many different group functions,
(SM, Maintenance and Planning, Capital Asset Management, and Operations), it is a fundamental
reality that the SM function needs to be Transnet’s focus, if we are to implement and manage CSDP
successfully.
Once this plan is approved, both by Transnet’s Exco and by the DPE, the following change activities will
be launched to ensure the successful implementation of the CSDP in line with Transnet SM’s critical
path (also refer to Capacity and Capability Upliftment):
Internal Change Management actions:
Structure, resources and skills:
• In collaboration with the operation divisions, determine and then motivate the structures and
resources needed to ensure implementation;
• Improve the capability of the procurement staff by ensuring that the current capability- and
capacity-building programme (made up of boot camps, workshops and e-Learning) is fully
subscribed and that performance is managed; and
• In addition to the current capability- and capacity-building programme, a short-term, supplier
development skills-focused training programme is created to improve the skills of the staff
selected to deliver the localisation initiatives linked to the capex programme.
Governance and risk management:
• Ensure that all governance, policies and procedures are completed, at least to a level that will
minimise risk to Transnet;
• Establish the rules of engagement for all stakeholders to minimise confusion, to reduce litigation
exposure and to ensure that Transnet is fully in control of the CSDP process;
Page 11 of 91
Supplier Development Plan
• Ensure that the organisation’s internal and external legal advisors (and through them the local
judiciary) are informed of the accepted procurement processes within SOEs, specifically as they
relate to CSDP;
• At all times balance supplier coherency with Transnet’s competitive advantage. Public disclosure
to suppliers, industry associations and government stakeholders must be grounded in sufficient
facts to make the information relevant to an industrial sector looking to expand. It must also be
based on the understanding that expansion is ALWAYS at the risk of the supplier within an
industry sub-sector. Transnet will not assume responsibility for the risks run by individual
suppliers, other than providing a contractual agreement (which is unique to the supplier).
• Continually interpret and apply the CSDP regulations to ensure that every reasonable attempt is
made to deliver fair, transparent and equitable transactions.
Development of best-practice SM:
• Transnet must continue on the path towards best practice SM as per the SM critical path,
especially as Supplier Development (of which CSDP is a sub section) is an advanced SM skill;
• Engage in SM best-practice benchmarking to ensure that the planned growth of SM expertise is
achieved and that gaps are identified and addressed timeously. This progression will not only
stabilize SM’s transactional service delivery to Operating Divisions, but will also provide a solid
base for the CSDP’s implementation.
Development of best practice Demand Management:
• Transnet’s engineers and VITs (Very Important Technologists) need to:
start instilling a programme of standardisation of capital equipment, thereby improving
-
management of costs over the life cycle of these assets; and
participate in cross-functional sourcing teams on a continuing basis, including being part of
-
any negotiation team engaging with strategic suppliers, thereby creating an united front
when interacting with suppliers; and
• Transnet’s corporate strategic planners need to develop a new long-term planning system, which
will vastly improve forecasting, thereby smoothing the patterns of demands on suppliers and
reducing excessive stockholding and ordering.
Building internal support for CSDP:
• Ensure that management, senior officials and SM staff understand and make the most of the
value of best-practice procurement by:
understanding that the power of procurement is contained not only in its ability to manage
-
spend but also in understanding the capabilities of suppliers as well as understanding the
market and industry and how to leverage supplier capabilities internally. It also lies in the
ability, to present South Africa’s industrial capability externally to the global SM fraternity as
an attractive source of supply; and
measuring the correct variables, namely:
-
a) total cost of ownership - a Strategic Sourcing measure; as well as
b) National Value Add (NVA) – a CSDP-specific measure.
Page 12 of 91
Supplier Development Plan
External Change-Management actions:
Stakeholder communication and interaction
• Develop a communications plan that will ensure all key stakeholders are informed of Transnet’s
CSDP on a continual basis;
• Engage in regular sessions with government support partners, such as DTI, Department of
Science and Technology (DST) and the Industrial Development Corporation (IDC) to discuss
progress, share experiences and identify and work together on areas of collaboration; and
• Ensure that the communications plan includes activities to address all key off-shore suppliers as
well as current and potential local suppliers, via local industry associations, publications and
journals, and news articles.
Supplier management and interaction
• As part of strategic-supplier contracts, CSDP participants will be subject to:
Annual benchmarking of performance measured against an initial baseline and the CSDP
-
agreement;
Periodic continuous improvement workshops to address improvement initiatives identified
-
through the benchmarking and other reporting mechanisms;
On an as-and-when-required basis, engage with government support partners, such as DTI,
-
DST and IDC to work on collaborative projects.
d) Transnet (AS IS – TO BE)
The greatest organisational challenge Transnet faces in implementing effective Supplier-
Development initiatives, is the lack of capability and capacity of SM staff, and the lack of trust this
fosters among Transnet’s senior managers.
This means that over and above developing this Plan and the procedures and governance needed to
implement CSDP opportunities, the upliftment of SM staff’s skills will remain a primary focus. The SM
function is characterised by:
• Fragmented Supply Chain
• Insufficient Supplier-Management Skills
• Lack of understanding of regulations – inconsistent application
• Lack of market research
• Little power or understanding of how to interpret and use power
• Focus on “doing it right” rather than “doing the right thing”
• Risk averse
• Transaction focused
• Poor Time Management
• Adversarial Relationships
• Apathy
See detailed table in Appendix C.
Page 13 of 91
Supplier Development Plan
e) Supplier (AS IS – TO BE)
Historically, Transnet has adopted a very-antagonistic relationship with its suppliers and have not
spent much time in formal relationship activities (while headway is being made in Transnet Capital
Projects, this is the exception, not the norm). Often, our internal stakeholders informally manage the
relationship which makes it difficult to dislodge entrenched suppliers from operations when a new
contract is awarded. In addition, our stakeholders will “gold plate” which means they create
specifications that only the preferred supplier can deliver even though those specifications are not
required and add unwanted cost to the process. Our end users will also design solutions that are not
compatible (often inferior) with the current market capability which means the supplier cannot provide
us with “off-the-shelf” solutions which, in turn, adds to base-price and after-sales service costs.
When the specification is challenged, the procurement staff are undermined or ignored. We have a
legacy of decades of this behavior, which means we have suppliers who understand our
requirements better than we do and who understand what is not really required and how much we
are overpaying.
Our supplier market is difficult to deal with:
• It is hard to determine ownership and financial inter-relationships;
• Many of our significant suppliers “enjoy” and exploit the benefits of sole supply (that we have
fostered over time);
• We do not have the time, latitude or sophistication to analyse long-term advantage from
partnering or guaranteeing demand longer than the single purchase. We often lose sight of the
impact to the supply chain for future spares and repair purchases. This costs us in terms of
lead time, administration costs and resources involved in activities that do not add value; and
• We do not have the time to analyse the market for performance, new entrants, current
benchmark prices, current trends, etc.
See detailed table in the Appendix C.
f) Supplier Relationship Management
One of the activities performed by any effective Supply Management function is Supplier
Relationship Management (SRM). Organisations participating in SRM achieve a reduction in total
cost of ownership, improved service, more flexibility and innovative solutions, which translates
into improved customer service. This is achieved through incorporating key suppliers as an
integral and vital part of our customer service approach. This leads to the:
• development of collaborative solutions;
• elimination of unnecessary costs through over-specification and lack of standardisation; and
• incorporation of supplier- and market-innovation into the organisation.
We are constantly facing difficulties in maintaining source of supply, containing costs and
understanding market dynamics. Because of this and the introduction of the new programme,
Transnet is currently in the process of developing its SRM strategy, of which Supplier
1
Development (including CSDP) is a part .
1
It is important to note that while CSDP is an important initiative and will potentially have an impact on the South African
economy, it is a relatively small portion of Transnet’s overall supply management value chain.
Page 14 of 91
Supplier Development Plan
Figure 2: CSDP in Context
Supplier Development within Transnet is made up of the following four elements:
• Preferential Procurement: focuses on maximizing expenditure with those suppliers who have the
most-optimal combination of technological capability, price and BBBEE status (accreditation), thus
empowering less-advantaged suppliers.
While preferential procurement is intended to redistribute wealth within the market, it often comes
at a premium. The key to effective preferential procurement is to focus on long-term demand and
relationships. This will ensure that the supplier can provide the goods or services at a market-
related price.
• Enterprise Development: focuses on investing resources (including funds) into small, micro and
new suppliers who currently (or can through development) provide goods and services to
Transnet.
Enterprise development is closely related to other empowerment initiatives. By building or
expanding black-empowered enterprises, a sponsor company can develop its own supply base or
future equity partners. Enterprise development is intended to convince larger companies of the
need to invest resources or transfer skills from themselves to small, black-run companies. By
engaging in enterprise development there is the creation of sustainability in the company to first
meet its obligations in terms of current contracts and then solicit other business from the market.
• Competitive Supplier Development Programme (CSDP): involves the localisation of our supply
chain by encouraging foreign direct investment from our international suppliers into local
businesses (or empowerment partners) so as to assist in expanding their capability and capacity
to provide goods and services not only to Transnet but as well as to export markets.
• Public-Private Partnerships (PPP): involves the investment by private entities into Transnet capital
assets usually either to improve current service to the private entity or in return for future long-
term service contracts for maintaining / operating the capital asset.
Page 15 of 91
Supplier Development Plan
A PPP is a contract between a public sector institution/municipality and a private party, in which
the private party assumes substantial financial, technical and operational risk in the design,
financing, building and operation of a project. Two types of PPPs are specifically defined:
- Where the private party performs an institutional/municipal function
- Where the private party acquires the use of state/municipal property for its own commercial
purposes. 2
Supplier Development offers Transnet significant benefits, and this plan will assist us in achieving
these benefits in a sustainable way while following good governance.
g) Risks in Developing the SDP
When developing any new strategy or programme within Transnet, it is critical that a great deal of
effort is devoted to ensuring successful delivery while simultaneously adhering to good
governance.
Transnet should not enter into complex, long-term relationships with suppliers without fully
understanding its requirements, the expected results, the governance required to satisfy
legislative obligations and responsibilities (such as PFMA) and the resources required to make a
commitment to a specific programme.
The following outlines some of the considerations that Transnet will be taking into account, while
developing and implementing this plan.
Governance and Policy (putting in the right Controls)
As a public entity, Transnet has an added responsibility to ensure that its procurement process is “fair,
transparent, competitive and cost effective” as required by the Constitution in order to obtain value-for-
money outcomes. This means that any strategy and process that Transnet SM creates, has to keep
this responsibility at the core of all that we do. The CSDP is no exception.
Transnet has several challenges:
• How to communicate our planned expenditure volume over the coming five years without
compromising our tender processes or negotiating advantages?
• When we are evaluating tenderers and all things being equal, how do we evaluate the “best”
localisation proposal or supplier-development opportunity and justify an award on this basis?
• When given an unsolicited idea that has enormous potential, how will we use our current policies
to award the contract to the supplier, without going through a competitive process such as a
public tender?
• What happens if policy is not followed correctly or is inexpertly applied and the decision we take
actually adversely affects the economy and / or our supply chain? What kind of legal exposure
will Transnet have?
• This is new to South Africa and Transnet; do we have the expertise and the time to develop and
implement effective financial and operating controls?
2
Public Private Partnership Manual, National Treasury
Page 16 of 91
Supplier Development Plan
Communications (providing the right “signal)
This programme is based on the fundamental premise that the SOEs can create a cohesive picture of
future spend, that will be the catalyst for suppliers’ investment in their own capacity and capability to
meet SOEs’ future requirements.
There are several concerns about how we go about communicating this to the market:
• Will the use of industry associations (as apposed to talking to individual suppliers) be the most
appropriate mechanism for two-way communication between an SOE and potential sources of
supply on SOEs’ future spend, in return for industry information regarding innovation?
• Who from Transnet Procurement should and who should not have these discussions with
potential sources of supply (so as to ensure segregation of duties once tenders are issued)?
• What frequency is adequate to send the message to industries?
• How detailed do we need to be to get the message across, without being too specific?
• What happens if the message is perceived to be a commitment, which suppliers act on? What
happens if a supplier incurs a loss, which renders him unable to supply in terms of his current
obligations?
• What happens if a supplier claims that he was unfairly treated by not receiving the same
information as his competitor, based on such communication with industries?
• Other than through tender, how do we effectively communicate to international markets?
How will we manage the programme (providing space to experiment, i.e. “learning by
doing”)
Transnet currently does not have the capacity or capability to identify, analyse and implement these
types of supplier development initiatives. The current reality is that during the period between our no
longer being subject to a NIPP obligation and the full implementation of the CSDP, we are engaged in
some large purchases that can present extremely good opportunities for localisation.
• How will we deal with the interim deals until the SDP has been approved and implementation
officially started?
• How will we bring our people “up to speed” in the short period that we have available?
• How will we find the right people and the budget needed to implement our strategy once the SDP
is approved?
• What do we need to create from scratch and what Supplier Development programmes are
currently available in the country?
Addressing the aforementioned risks will assist Transnet in avoiding situations that might lead to sub-
optimal deals and to eventual value destruction, for example failure to complete a comprehensive
understanding of the market could lead to developing a relationship with an inappropriate long-term
supplier. Transnet’s CSDP approach (refer to Part 6) and the high-level implementation plan (refer to
Part 10) were developed to addresses these issues and concerns.
Page 17 of 91
Supplier Development Plan
4. CSDP Programme’s five-year Objectives
Transnet Supply Management’s long-term strategy in terms of CSDP is to localise the supply chain of
imported manufactured goods or services to a reasonable level, while promoting local industries and
South Africa as an off-shore site of choice for OEM and multi-national procurement personnel
Transnet SSM framed the four key success factors (CSF) that are critical to improving the organisation’s
CSDP performance as part of the overall CSDP programme’s five-year objectives. These programme
objectives are linked to the CSDP programme’s Key Performance Indicators (KPIs) contained in Part 9.
The four CSFs are:
Objective 1: Delivery of the CSDP
Objective 2: Increasing Scope and Detail
Objective 3: Capability Improvement
Objective 4: Capacity Improvement
Transnet’s five year CSDP programme objectives are:
Objective 1: CSDP Delivery
The plan must be formalised and implemented through the development of:
• An oversight committee responsible for approvals;
• a project team that is responsible for the overall delivery, update and amendment of the plan;
• a proper project plan to identify required resources and deliverables;
• governance, procedures and policies;
• tangible business cases of CSDP initiatives that will direct the delivery of localisation benefits in
line with OEMs’ contractual requirements; and improved contract-management practices.
Objective 2: Increasing SDP scope and detail
• SDPs will be updated periodically, with a concurrent incremental development of their scope and
detail, as Transnet’s business practices improve in terms of:
Operating Division management starting to use longer-term demand planning (currently
-
five-year view provided on spend analysis);
Technical experts adopting and managing standardisation practices to drive down the life-
-
cycle costing of manufactured equipment; and
Supply Management broadening its reach of Strategic Sourcing practices in (capex)
-
commodities.3
Objective 3: Supply Management skills improvement
Transnet SM professionalises its staff in line with the Integrated Capability and Capacity
Procurement Programme (ICCPP) – (see detail of current activities in Part 4).
Objective 4: Supply Management capacity improvement
Transnet SM improves its capacity in line with the SM Critical Path (see detail of current activities in
Part 4).
3
DPE CSDP Practice Note, 2007
Page 18 of 91
Supplier Development Plan
In fulfilling these four programme objectives, Transnet will be in a position to ensure continuous
improvement of its direct performance in implementing CSDP localisation initiatives as well as
strengthening the supporting practices required to ensure the success of the overall CSDP.
a) SM improvement and the Critical Path
The current Transnet procurement capability (and capacity) constraint is a result, in part, of the
thirty-year decline in capital expenditure by government and SOEs. During this period, the public
sector’s capacity to procure capital goods was significantly impaired as relevant skills were lost
and capital-procurement offices within government were closed. Consequently, in the current
environment existing public-sector capacity and capabilities are fully stretched and are
inadequate. Add to this situation new regulatory changes such as the Construction Industry
Development Board (CIDB) and new contracting methodologies, the Public Finance Management
Act (PFMA) requirements and the severe skills shortages in South Africa for Procurement and
Supply Management (PSM) and you have a skill base that is less than capable of handling
Supplier Relationship Management in general, let alone CSDP. Despite the current recruitment
drive to fill critical vacancies in SM, Transnet still does not factor as an Employer of Choice in the
market.
Transnet has undertaken several initiatives to rectify this situation at the cost of considerable
investment and resource allocation. The results, to date, indicate that change has occurred, but
our level of maturity (in comparison to other organisations) still remains low.
In October 2005 (subject to yearly review), Transnet SM identified its Critical Path to
improvement. The Critical Path is based on a scientific approach that demonstrates the skills
capabilities required at any given maturity level within the PSM function and shows the steps that
are required to “mature”. At the heart of the approach is the understanding that you may never
reach the next maturity level, unless the skills set and capability of the current level are
satisfactorily achieved. There is no defined timeline on how long it takes to get from one level to
the next, but an organization MUST develop the appropriate skills level, before it can fully master
the activities of the next level.
The following diagram (Figure 3) illustrates the “critical path” that Transnet supply management
has embarked on to become:
“an integrated, value added professional partner to our stakeholders,
providing a reliable, cost-effective and customer-focused service.”4
4
Transnet Supply Management vision statement, October 2005
Page 19 of 91
Supplier Development Plan
Figure 3: SSM Critical Path
The Critical Path
In order to focus our limited resources on generating the maximum value for Transnet, SM entered into
a process of identifying the key interventions (as shown above) required to transform the function to
meet our service-delivery promises to our stakeholders.
• Our first focus has been on the improvement of our fundamental transactional capabilities and
on improving our people skills and confidence. Phase one was implemented in November 2007
and has not yet been completed.
• Our second focus has been on “fixing” SAP implementations, standardising content and
developing control frameworks for key processes. The design phase is completed, but the
implementation is still in progress.
• Our third focus has been on compliance and risk management which ensures that all of the
process controls are in place and are effective.
As can be seen in Figure 3 above, Supplier Relationship Management (SRM), theoretically will only
start once the other objectives have been completed. We had not expected to start on this portion of
the Critical Path until late 2008 (South African procurement practitioners in general, do not practice
SRM effectively). Meeting the requirements of CSDP means that we must fast-track change initiatives
for this level of capability sooner than initially envisaged.
It is therefore obvious that, in parallel to the development of the SDP, it is critical that Transnet SSM
achieves its current Critical Path objectives in a shorter time. As can be seen from Figure 4 below,
Transnet (see Part 4) will have to propel the organisation from a level of little or selected supplier
management capabilities to a level of maturity that incorporates SRM into our day-to-day functions.
Page 20 of 91
Supplier Development Plan
A fully-operational SRM approach would ensure that:
• All future spend is evaluated for the appropriate supplier development opportunities and this is
communicated to the category managers and buyers;
• All CSDP opportunities would be articulated, captured in appropriate documentation and
circulated for approval. The proper process would be adhered to so as to bring a business case
to fruition;
• Priority Supplier Industries would be monitored by category teams to ensure that there are no
major changes to the suppliers within the industry and that benchmarks are kept to ensure we
receive value for money;
• Supplier performance would be monitored and changes (to the supplier or to Transnet) effected, if
performance is not satisfactory.
Figure 4 below indicates the relative amount of change required in the organisation as a whole, before
SRM will be truly effective. As with any organisation, we currently have exceptional instances of SRM
capabilities and must take every opportunity to leverage this skill. But, on average, we do not practice
nor do we have the capacity to practice this skill.
As discussed in Part 3 and Part 10, not only does Transnet have to increase its efforts in education and
training of SM and other function staff, we also need to embark on a program of organisational Change
Management endorsed by Transnet’s senior management, to ensure their future and continued support
for CSDP.
Figure 4: The Capability Maturity Curve
Page 21 of 91
Supplier Development Plan
b) SM skills upliftment and the ICCPP
In Part 3, concerns regarding the level of professional SM skills were raised. This section
outlines some of the key interventions that Transnet SM is undertaking and will continue to
undertake in this critical arena.
During December 2006, Transnet with the DPE and two professional Institutes -- the Institute of
Purchasing and Supply of South Africa (IPSA) and the United Kingdom-based Chartered Institute
of Purchasing and Supply (CIPS) – developed a skill-upliftment programme for SOEs. The
proposed solution, named The Integrated Capability and Capacity Procurement Programme
(ICCPP) was designed to supply a range of interventions to address the level of professional
skills in PSM in targeted SOEs in Southern Africa, bringing together an integrated delivery
programme to introduce PSM professional qualifications.
Overall, the ICCPP addresses capacity and capability building at three levels, namely:
• Individual level
- training programmes and skills development
- knowledge transfer/learning through experience
- professional development
• Organisational level
- stakeholder sensitisation
- process enhancement
- reduction of the total cost of ownership of goods and services
• Institutional level
legal framework
-
professional institute.
-
Figure 5 below illustrates the ICCPP programme’s intervention approach:
• “Bottom-up professionalisation” will be achieved through the design, set up,
customization and operation of the Institutes of Southern Africa Procurement Academy
with CIPS Inside. The Academy’s base framework is the UK national occupational
standards for Supply Chain Management (SCM), which are delivered electronically to
learners. The system was recently commissioned and Transnet has started the process of
enrolling learners.
• “Top-down rapid intervention” was designed to ensure quick but systematic development
of formal procurement skills for the 5% of Transnet’s SM practitioners responsible for 90% of
high-risk, high-value projects. It is based on the following delivery models:
Page 22 of 91
Supplier Development Plan
Integrated Capacity and Capability Procurement Programme
Top down rapid
development
SOEs specific
intervention
Procurement
Mini “MBA” /
“Bootcamp”
Institutes of Southern Africa Procurement Academy
with CIPS Inside
Action Learning Programme
(fast tracked accredited qualifications)
professionalisation
Procurement Courses
Bottom up
(linked to accredited qualifications)
Organisation Competency Models
(based on standardised job specs)
Institute Membership Professional Standards
Institutes initiative
Figure 5: The ICCPP process
• FAST TRACK STEP 1: Mini Procurement “MBA” or “Boot Camp”
An intense eight-day event, the “mini Procurement MBA” or “Boot Camp,” kicks off the fast-
tracking process for the top 5% practitioners. This serves as the access point to become eligible
for the next phase.
• FAST TRACK STEP 2: “Learning in Action” programme
An accelerated 15 – 18 month “Learning in Action” programme, resulting in full MCIPS
professional certification at Honours degree level – certification is normally a 36-month process.
This work-based programme is based on specific organisational objectives and the identified skill
gaps of participants.
The introduction of the CSDP required Transnet SM to expand further the Fast Track Step One from
Boot Camps focused on Strategic Sourcing and Capital Expenditure Sourcing, to include training on
Supplier Development. We will also be creating an extensive training course for Supplier Development
Managers, with delivery set to take place during second half of 2008/09.
We currently do not have an integrated Supply Management structure across Transnet and we have a
vacancy rate of at least 15% across the organisation. Many of our 400+ procurement staff have been
with Transnet for more than 15 years and we also have a small group of new hires with a different view
on Supply Management.
This has led to a situation of varied skill sets and ability to deliver. In general, however, Transnet SM
does not have spare capacity that can easily be “retrained” or expanded into SRM activities.
This will force us, in the short term, to focus on only a few key initiatives to gain insight into the potential
value, effort and risk that will be involved in the activity. In parallel, as previously mentioned, Transnet
SM will develop or procure a specialised programme in Supplier Development.
Page 23 of 91
Supplier Development Plan
5. Spend Analysis (detailed 5 years)
The ability to procure coherently and efficiently, while managing effective win-win relationships with
suppliers, is a powerful way of creating a conducive investment and capability-development
environment in national industries. This will allow a progressive lowering of the costs of doing business
for participating SOEs.
However, as SM we must have a clear understanding of Transnet spend, the supplier base and supply
chain to determine future opportunities in terms of localisation and Supplier Development.
At the outset, it is important to understand how spend is segregated in general. Figure 6 below shows
this breakdown.
There are a range of areas where the SOEs will have large predictable spend
requirements – these are the focus areas for supplier development
Operational Expenses Capital
OPEX
Spend on goods and
CAPEX
services PROJECT CAPEX
extending / upgrading the SOEs’
SOEs’
production capacity
LONG TERM ASSET BASE (equipment related)
Top twenty requirements
(T)OPEX
(C)OPEX
(C)OPEX
To maintain the SOEs’ To maintain the SOEs’ extended /
Current production capacity upgraded production capacity
PROJECT CAPEX – Project management objectives: project in on budget, on time, to spec
CAPEX + COPEX + TOPEX – Strategic sourcing: Optimising total lifetime cost or long term efficiency
OPEX – business objectives: cost optimisation depending on supplier relationship strategy
Figure 6: Spend Break down
For Transnet (at a high level), the breakdown is as follows:
• Operational Expenditure (Opex): roughly R14 billion per year of which some 70% goes to our
top-20 suppliers. Our supplier base is roughly 16,000 suppliers across Transnet.
• Capital expenditure (Capex): we currently plan an expenditure of R80 billion on capital projects,
over the next five years, aimed at capacity expansion and upgrading current facilities. The split is
60% mega projects (defined below) and 40% on business unit related projects. All projects over
R300 million are managed internally through Transnet Capital Projects.
Page 24 of 91
Supplier Development Plan
Capex Breakdown
The major projects (and equipment purchases) are listed below.
• Rolling Stock: Fleet upgrade plan includes:
Upgrade of 100 GM diesel locomotives
-
Upgrade of 100 GE Electric Locomotives
-
400 new locomotives
-
7000 new wagons
-
Replacement of On-Trac machines
-
• Infrastructure:
Coal Line expansion
-
Ore Line expansion
-
Eskom – Majuba coal supply
-
Coega Line
-
Substation upgrades
-
• Port Equipment:
Straddle carriers
-
Rubber-tyred Gantries (RTGs) and cranes
-
Ship-to-Shore (STS) Cranes
-
Reclaim / reach / mobile stackers
-
Rail siding cranes
-
Haulers and trailers
-
Forklifts
-
Tug Boats
-
Dredgers
-
• Pipeline:
- New Multi-Purpose Pipeline (NMPP) from Durban to Johannesburg
• General Construction:
- Construction of the Port of Ngqura
- Harbour improvements in Durban and Cape Town (including widening and deepening, quay
refurbishment, increased terminal capacity)
- Car port in Durban
- Improved Durban Container Terminal (DCT) trucking access and throughput
- Richards Bay Dry Dock Terminal Upgrade
- Saldanha Bay upgrades
Page 25 of 91
Supplier Development Plan
Figure 7 provides a detailed analysis (as at October 2007) of Transnet’s Capex Commodity Spend
Breakdown:
Oreline Special
Materials Quantities Unit Total Marine Projects Projects Projects
Concrete m3 502,174 471,825 15,080 15,080
Steel Reinforcing Ton 96,328 12,890 81,900 1,506
Rock m3 10,189,640 10,053,640 135,000 500
Brick Walls m2 62,998 50,149 12,100 -
Structural Steel Ton 70,798 34,886 30,494 5,282
Dredging m3 8,966,517 1,366,517 6,600,000 1,000,000
Earth Moving m3 4,930,782 4,151,362 710,000 1,420
Rock/Concrete Removal m3 27,190 6,560 20,000 10
Pre-cast Sleepers No 582,510 44,790 428,000 69,720
NMPP Pipe* Ton 23,681 14,181 9,500 -
Ballast m3 515,743 60,000 326,743 69,000
Bitumen Ton 63,855 62,732 240 768
Form Work m2 52,711 49,861 - 2,500
Steel – Rail Wagons Ton 62,367 18,367 - 44,000
Steel – Rails Ton 27,610 620 21,600 5,390
Steel – Plate (Tanks) Ton 1,453 855 598 -
Concrete Piping m 23,943 15,543 3,600 1,600
- -
Locomotives (Line & Shunting) No 178 29 80 69
Wagons No 8,505 569 5,336 2,600
STS (Ship to Shore) Cranes No 6 6 - -
RTG’s No 30 30 - -
Reach Stackers (containers) No 6 6 - -
Stacker / Reclaimer (Ore) No 8 - 2 6
Tugs No 4 3 1 -
Iron Ore Stockyard Conveyor System No 13 - - 13
Figure 7: Estimated Capex Commodity Spend Breakdown
Page 26 of 91
Supplier Development Plan
6. CSDP Approach and Opportunity Identification
For CSDP to be successful, it is absolutely necessary that Transnet should create a robust and effective
approach to developing opportunities. This is to ensure that Transnet focuses its energies on the most
appropriate areas that will provide the most value from the limited resources that it has.
The aim of the CSDP is to identify localisation interventions that will leverage Transnet’s expenditure on
imported goods and services and that will address the market inadequacies so as to create an
environment conducive to investment in new and/or upgraded local manufacturing capacity. In order to
maximise the impact of the CSDP, these interventions need to be focused on:
• Those goods/services with the most potential for competitive local manufacture (with the ability to
export based on spare capacity);
• Those goods/services for which South African industries have current capability to produce (or
with some element of development expenditure / effort can produce); and/or
• Those goods/services in which foreign investors (such as overseas OEMs) are willing to support
South African supplier development.
a) Developing the Approach
Initially, Transnet will need to focus on those opportunities that emerge as part of the capex
programme’s capital equipment and long-term opex supply tenders. It will also need to review
previous and recent capital equipment purchases to unwind NIPP obligations and then develop
any CSDP initiatives that may arise due to such unwinding.
Figure 8 demonstrates the necessity of ensuring that in the first phase of implementing the
strategy, Transnet focuses its attention on the opportunities that will give the greatest benefit,
without needing to extend or intensively train the current resource base. Transnet needs to focus
on the localisation opportunities that have low to medium risk with medium impact to the market.
The main opportunities:
Targeted Skills: Transnet has a current need for approximately 1000 highly-skilled artisans to
meet day-to-day operational requirements. This skill set, can in some instances, be provided by
our CSDP partners.
Maintenance and Repair capabilities: In addition to the day-to-day operational skills, Transnet will
require additional skills to manage the capital investment programme, such as port equipment
maintenance, substation and signaling maintenance, pipeline maintenance, etc.
Page 27 of 91
Supplier Development Plan
Figure 8: CSDP Approach – Determining Opportunities
Component Manufacture / Upgrade: Transnet currently has many of these capabilities, but
primarily to serve its own requirements. In fact, Transnet Rail Engineering (TRE) has various
centres of competency, which have been vetted by a number of its strategic Original Equipment
Manufacturer (OEM) suppliers.
System / sub-system manufacture: While Transnet currently refurbishes its older fleet
(locomotives, tugs etc), the organisation does not engage in design and is not currently interested
in this as an opportunity. Other local suppliers may however see this as an attractive proposition.
Transnet’s CSDP approach is designed to make certain that we:
• Provide flexibility to accommodate innovations available in the market and in building the most
appropriate relationship(s):
- each supplier will have different requirements and abilities, which must be catered for;
- while the policy will ensure governance, our approach will optimise value from the supplier
relationship, without having to create an equity relationship or retain money on behalf of the
supplier. The relationship will be contractual; and
- the approach will use a total-cost-of-ownership model which looks at all of the relationship
cost variables including purchase costs, internal costs and life-cycle costs.
• Focus on a case-by-case evaluation and delivery:
each purchase that we make will not be subject to a CSDP localisation opportunity;
-
every purchase that has a possible CSDP element will not be pursued, due to resource
-
shortages and the need for control and good governance; and
Value for money impact versus effort will drive the decision on a case-by-case basis to
-
decide on which CSDP opportunities we should engage.
Page 28 of 91
Supplier Development Plan
• Have the necessary procedures and policies to apply dynamic capabilities to exploit emerging
opportunities:
Procedures will be developed based on the CSDP value chain and will cover all aspects
-
from identification, evaluation, approval and measuring;
The Detailed Procurement Procedure (DPP) will be updated with the relevant policies that
-
will provide the necessary controls and governance (also refer to Part 10);
The Controls will be reviewed with Internal Audit for approval; and
-
Appropriate templates will be developed, including opportunity identification, business case,
-
measurement reports and generic contracts.
• Deliver in an effective, sustainable manner:
All plans and business cases will be well defined, measurable and implementable;
-
Key staff will be tasked with the CSDP programme. A high-level oversight body will ensure
-
governance, suitability and validation of the business case;
An effective approach will ensure that the KPIs are reasonable, measurable, attainable and
-
applicable in all situations; and
A contractual relationship will ensure sustainability and a long-term commitment.
-
• Develop a supplier code of ethics;
Transnet will work with appropriate stakeholders (such as DPE, DTI, industry associations
-
etc) to develop a code of ethics that will serve to establish the expected relationship that
arises from a CSDP opportunity.
• Provide mechanisms for measurement and benchmarking.
Each business case will outline the expected KPIs for the opportunity. Primarily these will be:
-
1. National Value Add (NVA);
2. Transnet total cost of ownership (TCO) reduction;
3. export volumes; and
4. employment created.
See Appendix E: Guiding Principles in developing Transnet’s CSDP Approach
Steps in the Approach include:
1) Align spend - identify the opportunities
2) Conduct the sourcing event
3) Categorise and record the opportunity
4) Approve the opportunity in principle
5) Negotiate with the supplier
6) Develop the business case and obtain approval
7) Create and finalise the contract
8) Measure the supplier
Each step will be mapped and defined in a Transnet Policy and Procedure manual. For details, refer
to Appendix F.
Page 29 of 91
Supplier Development Plan
b) Identify the Opportunities
Transnet has to date identified several CSDP opportunities that needed to be analysed and
evaluated (refer to Part 8). This has proven to be a difficult task, because of the need to keep
pace with the tender process, the market and business needs, while trying to implement deals
systematically and effectively, without a proper procedure, governance model and approval
process.
From investigating several pilot localisation initiatives (refer to Part 8), it became clear that
Transnet will look at the following types of CSDP opportunities:
GFB – General Freight Business
RTG – Rubber Tyred Gantries
Figure 9: The Types of Opportunities
Local Expansion: this type of opportunity will occur when a supplier, based on the increased
Transnet spend, is able to expand current capability that not only meets the Transnet
requirement but that also allows it to take on other customers. It will mostly involve a foreign
company partnering and investing with a local (preferably level 5 BBBEE empowerment status or
better) entity.
In some instances an OEM will invest in a local industry to produce products that are for local
consumption only (not for export as it is not economically viable to do so). This type of
opportunity will be import avoidance and measured accordingly.
Increased Export Capacity: in this instance, a local manufacturer or foreign entity expands
capacity to provide Transnet requirements and overseas demand. This will usually be done at the
company’s own expense and risk. Our award allows the supplier to project demand, but also to
provide a stable economic view for foreign investment.
OEM Manufacturing: this opportunity is specifically aimed at promoting South African
businesses as offshore suppliers of choice for OEM companies. We would broker deals with
foreign suppliers to partner with local manufacturers who are capable of competitively
manufacturing their capital equipment spares under licence, thus ensuring local source of supply
for spare parts and an increased export base.
Page 30 of 91
Supplier Development Plan
A large portion of the goods we acquire are from international suppliers, which exposes Transnet
to foreign exchange (forex) variations, long lead times and lack of security of supply, due to the
organisation not being a “Customer of Choice” for large international OEMs. This type of
opportunity will allow Transnet to localise its supply chain, making the organisation less
dependent on imports. By manufacturing the parts under the OEM name (rather than local
reverse manufacturing), local business will have access to the global market and Transnet will
reduce its internal testing cycle (2 or more years).
It is expected that most of our CSDP localisation opportunities will be of this type.
Optimising NIPP obligations: seven of our suppliers, including Alstom, Kalmar, Mitsui and
Liebherr, have NIPP obligations with the DTI, based on past Transnet contracts for imported
manufactured goods. In conjunction with the DTI, Transnet will be developing a model for
unwinding and/or implementing solutions to meet these NIPP obligations and incorporate them
into subsequent CSDP programmes without duplicating any obligations.
Other: In the course of dealing with suppliers, we are often approached with a problem or an idea
that may not fit within our current model. Transnet may become involved if there is value in
pursuing the opportunity with little effort.
Industrial complexity of CSDP opportunities
In determining whether any of the expenditure categories identified in Part 5 are suitable for a CSDP
localisation supplier development opportunity, the ranking system detailed in Figure 10 below, gives one
an understanding of the complexity, suitability and resources required by OEMs to localise parts of their
supply chain.
Each localisation opportunity can be evaluated in terms of its ability to be a CSDP opportunity. Figure
10 provides examples, while definitions are contained in Figure 11 below. In applying the concepts
detailed in Figure 10 to Transnet’s spend analysis (refer to Part 5), the following conclusions can be
drawn, as to the most appropriate focus areas for CSDP opportunities for Transnet to investigate:
Figure 10: Determining Degrees of Complexity
Page 31 of 91
Supplier Development Plan
Shallow Intermediate Deep
• Local capability • Barriers to entry • Requires government
intervention (in order to
• Technological impact
- not likely to export or
persuade the private
• Centres of Excellence
- already have export
sector to build new
capability
(COEs) export quickly
capability)
• Enterprise Development
• High barriers to entry
• Empowerment
(such as high capex
(preferential
and/or R&D costs)
procurement)
• PPP
Figure 11: Initiative Ranking
• Shallow industrial complexity spend items (i.e. construction valued at R40 billion over five
years): The sources of supply are already based locally and this should best be supported
through supplier development actions, such as Enterprise Development and increasing the
Preferential Procurement drive.
• Intermediate industrial complexity spend items (i.e. assembly, equipment components, parts
manufacture and maintenance and repair): The sources of supply are international firms which
own the design, however there is local potential to manufacture to design. Part of Transnet’s
five-year spend on rolling stock and port equipment (and to a lesser extent infrastructure and
pipeline) falls into this category (see Figure 12 below), this being best suited to CSDP
opportunities.
Changing the source of supply to the local market on these items will be subject to certain
barriers to entry. Such barriers should be overcome by the private sector investing in capacity
and capability upgrades to become part of an OEM’s localised supply chain. A prerequisite to
such private-sector investments is that SOEs should execute their procurement in such a way as
to underwrite (indirectly) their tier-2 suppliers’ investments, by a clear long-term contractual
commitment with an overseas OEM, containing localisation obligations to local suppliers investing
in capacity and capability upgrades.
• Deep industrial complexity spend items (i.e. improving local manufacture of tug boats,
manufacture of diesel engines or establishing an OEM for locomotives): The localisation of deep
industrial complexity related commodities will require joint private- and public-sector long-term
investment to overcome the even higher barriers to entry. Transnet’s first SDP will not be looking
at such opportunities.
The following Figure 12 illustrates Transnet’s current planned capex expenditure by category. The figure
shows the intended focus areas for CSDP.
Page 32 of 91
Supplier Development Plan
Figure 12: Transnet Spend 2008 - 2012
Figure 13 (below) – Industry Sub-Sector Breakdown - is a summary of
Transnet’s potential tier-2 supplier opportunities, based on intermediate industrial complexity, by industry sub-sector.
Page 33 of 91
Supplier Development Plan
7. Supplier Industry Analysis
In the short term, Transnet will focus its attention on those industries that the previous analysis has
justified. However, prior to analysing Transnet’s Supplier Industry for Rolling Stock and Port Equipment,
South Africa’s national competitive position will be reviewed from international and regional
perspectives.
This macro view is deemed necessary to fully address the spirit of CSDP: grasping the \"C”
(Competitiveness) in CSDP. The aim of this part of the SDP is to come to grips with the issues that
influence global competitiveness of enterprises (suppliers) today and into the future.
a) Macro perspective
The South African supply base’s International Competitiveness
The World Economic Forum’s Global Competitiveness Report 2007-2008, which measures 131
countries, determines rankings calculated from publicly-available data, while the Executive
Opinion Survey is based on a comprehensive annual survey of 11,000 business leaders,
conducted by the World Economic Forum together with its network of Partner Institutes (leading
research institutes and business organisations) in the countries covered by the report. In terms of
th
this report (refer to Figure 14 below) South Africa ranked 44 (out of 131 countries) in 2007 –
th
2008 against its 36 position (out of 122 countries) in 2006.
Figure 14: Global Competitiveness Index
Based on this Global Competitiveness Report an analysis is done per participating country, thus
drawing up:
Page 34 of 91
Supplier Development Plan
• a National Balance Sheet – refer to Appendix G; and
• a list of the most problematic factors for doing business in that country (refer to Figure 15 below).
Figure 15: SA’s list of most problematic factors for doing business
NOTE: Percent of responses: From a list of 14 factors, respondents were asked to select the five most
problematic for doing business in their country and to rank them between 1 (most problematic) and 5. The
bars in the figure show the responses weighted according to their rankings.
IMD, one of the world’s leading business schools, located in Lausanne, Switzerland, is the author
of the \"Competitiveness Roadmap 2007 to 2050\" (see Appendix H) attempts to describe and
assess the main issues that will affect the world competitiveness landscape during the next four
decades. Issues are shown along two axes, degree of impact and time-scale, to provide a clear
\"mental map\" of the environment in which nations and companies will operate. This is a
subjective assessment, which aims to bring some coherence to the multitude of issues that are
said to be having an impact – sooner or later – on the competitiveness landscape.
Roadmap issues with a potential impact on South Africa and the CSDP are:
• “New Attractiveness for Africa: Africa is becoming attractive again thanks to energy and
commodity investments. More than 700 Chinese companies operate in Africa. Emerging powers
benefit from the absence of a colonial past in the region”.
Potential CSDP impacts to consider:
- SOEs should use this increased attractiveness of the region to influence OEMs to localise
part of their supply chains in South Africa.
- SOEs when deciding on OEM partners, should also consider those in emerging economies,
such as China and India as a possible source of supply. Chinese STS crane manufacturer
ZPMC already holds a dominant position in the market for example (also refer to Part 7).
• “Productivity is harmonized worldwide: Productivity is harmonized around world operations as
companies become truly global and widely diffuse the same technology and processes among
Page 35 of 91
Supplier Development Plan
the markets where they locate their assets. The value chain is managed at the global level. The
nationality of companies matters less and less”.
Potential CSDP impact to consider:
SOEs should use this trend of OEMs becoming “world citizens” and the requirement to
-
improve the “triple-bottom-line” to make sure that local tier-2 and/or tier-3 suppliers become
part of these global supply chains and that the technology diffusion also takes place in South
Africa. In acquiring these skills, local suppliers could develop a base from which to build
more-advanced skills in the future.
• “China, India and Russia as Technological Powers: China, India and Russia regain their age-
old status as technological powers. Foreign companies no longer hesitate to transfer research
centres to these countries that have a long tradition of excellence in science and innovation”.
Potential CSDP impacts to consider:
SOEs should try to copy the above model, by stressing South Africa’s strength in science
-
and innovation, when trying to convince OEMs to localise their supply chains. Note from
Figure 14 above that South Africa’s competitive position is, for example, better than that of
India.
Through supporting the supplier benchmarking programme for local tier-2 and/or tier-3
-
suppliers, SOEs can contribute to the continuation of this tradition of excellence.
• “Manufacturing jobs shrink: During the past decade, the world’s production of manufactured
goods has grown by some 50% while manufacturing jobs have declined by 10%. Such a trend
also takes place in emerging powers such as China. Higher productivity world-wide – in part due
to the internationalization of technology and manufacturing processes – is the explanation”.
Potential CSDP impact to consider:
SOEs should understand that the localisation of their imported manufactured equipment may
-
not have as large a long-term impact on job creation as they might like to see (unless they
can compete with the economies of automation).
Continuous productivity improvement will be critical to the competitiveness of local tier-2
-
and/or tier-3 suppliers. Again SOEs could create a positive pull to encourage this by
supporting the supplier benchmarking programme.
It is false economic improvement to provide jobs at the expense of a decent wage simply to
-
be competitive.
The South African supply base’s Regional Competitiveness
The Africa Competitiveness Report 2007, published by the WEF, World Bank and African
nd
Development Bank, places South Africa as the 2 most competitive African country (refer to
Figure 16 below). This report states that African businesses can become far more competitive,
but African governments and their international partners will need to improve access to finance,
rebuild infrastructure and strengthen institutions.
Page 36 of 91
Supplier Development Plan
2007 Africa Competitiveness
Report Top Ten
Rank Country Score
1 Tunisia 4.72
2 South Africa 4.42
3 Mauritius 4.22
4 Egypt 4.09
5 Morocco 4.02
6 Libya 4.00
7 Algeria 3.98
8 Botswana 3.83
9 Namibia 3.76
10 Kenya 3.61
Figure 16: African Regional Competitiveness Ranking
b) Micro perspective
Industry competitiveness of the South African supply base
In conjunction with Wits University and McKinsey, Transnet is undertaking a study of the key
spend areas for Rolling Stock and Port Equipment to understand:
• Strengths and weaknesses of supplier cluster and industry from Transnet’s perspective, initially
focusing on those key industry sub-sectors that will be pivotal sources of supply to Transnet’s
“mega projects5”, while not requiring significant public-sector investment. This will ensure that the
developmental pace is sufficient to meet demand.
• Analysis of imports and the desire of international companies to invest in South Africa (either
directly through joint ventures with local suppliers or through foreign direct investment
opportunities). Each opportunity must prove global competitiveness (whether a purely local or a
foreign investment initiative) as the key criteria, before a business case will be developed.
• It is critical that the opportunity is locally sustainable over the long term, as Transnet does not
want to create a situation where once the commodity is no longer required (the capex expenditure
is complete), the foreign supplier leaves the country and no longer provides investment support to
the local manufacturer. (One opportunity explored and rejected was an offer from a Chinese pipe
manufacturer to invest in building a large-pipe manufacturing facility for the Pipeline project.
However, there was no long-term plan once the pipeline was completed).
Simultaneously, Transnet will use internal resources and expertise to understand how the
organisation’s strategic requirements will be met through external expenditure and where
opportunities exist that will not put expansion at risk or increase costs. We have embarked on
understanding scarcity of supply, off-shore sourcing, the ability of the local market to supply and
the investment needed to make this happen.
Background
There are just fewer than 600 firms in the South African “other transport equipment” sector, with a
total output of R5.9 billion. The high number of firms is largely explained by the aggregation of the
sector to include railway equipment, shipbuilding and boat manufacturing, aircraft and related
equipment, motor cycles and other types of vehicles.6
5
Capital projects over R300 million
6
CSID Research Reports, 2006 /07
Page 37 of 91
Supplier Development Plan
South Africa has mineral-based, well-developed resource extraction and primary manufacturing
industries (such as steel manufacturing), and competitive energy and skills. In order to increase
South Africa’s global competitiveness, these comparative advantages should be leveraged into
higher value manufacturing products.
In general, over the past twenty years South Africa’s secondary manufacturing sectors (such as
the foundry industry) and finished manufacturing sectors (such as the capital goods industry)
under-performed, due to a number of reasons, including:
• the removal of protection and increased imports;
• high costs of inputs, even where South Africa has a comparative advantage; and
• an insecure and declining local demand base.
Certain industries however had a stable demand base and long-term customer relationships
during the same period, with a resulting growth in capital goods exports, for example in the
mining and paper industries. In these industries buyers established strategic collaborative
relationships with key suppliers, including:
• Systematic communication of opportunities, constraints and plans;
• Working in clusters to find solutions to key problems, enabling research and development
investment by suppliers and on site testing of innovations; as well as
• Joint designing of standards and specifications.
The development of high-value manufacturing, such as capital equipment, is therefore clearly
dependent on competitive inputs from its lower-tier sectors. Continued improvements in
technological capabilities and cost-competitiveness are crucial for lower-tier sectors to compete
globally. However, competitiveness is frequently hampered by a lack of technology support
structures and a lack of conformance to internationally-accepted standards.
SA supply base for Transnet’s Primary Focus Areas: Rolling Stock and Port Equipment
As detailed in Part 8, during Phase 1 Transnet will be focusing on two primary areas, namely
Rolling Stock and Port Equipment.
We will focus on these areas because:
• Successful implementation of the CSDP will depend on a localised supply chain. Currently,
new-equipment purchases provide us with the opportunity to manage the transition from
100% imports to a contractual local content;
• We are currently in the tender process for this equipment and it is at this stage that Transnet
can fully exercise its influencing “power”;
• We have limited resources and we must focus these resources to obtain optimal results; and
• This programme is new to us and to our stakeholders. We must focus on key areas of return
to provide a proof of concept.
Rolling Stock
By far, the biggest player in the sector is Transnet Rail Engineering (TRE), which is responsible
for the manufacture and repair of local rolling stock. TRE has factories across South Africa and is
involved in many aspects of manufacturing of assemblies and components as well as the
maintenance of Rolling Stock. It is also a manufacturer of wagons (tier-1 supplier to Transnet
Page 38 of 91
Supplier Development Plan
Freight Rail). Tier-1 suppliers are direct suppliers of fit-for-purpose equipment (systems and sub-
systems). Other tier-1 suppliers are: GE, GM, Alstom, EMD, Mitsui and Siemens.
Transnet strategic tier-2 suppliers (manufactures of assemblies and sub-assemblies or key
maintenance / testing services) include: Union Carriage & Wagons Partnership, Siemens, DCD-
Dorbyl (subsidiaries Rolling Stock Division, Metpro and Ringrollers), Scaw Metals and Surtees.
Apart from Metpro, which is located in Rosslyn, all the companies mentioned above are located
on Gauteng’s East Rand7.
In general, firms in the railway equipment sector tend to specialise in products that are not in
direct competition with other local producers. This stems partly from the vast array of components
that the sector needs. In addition, a long-term co-dependency also exists between major players
and their suppliers. TRE, for instance, sub-contracts a significant amount of the work to other
firms despite having in-house capabilities.
Port Equipment
The local Marine Handling Equipment and Machinery sector is moderately competitive globally
with long lead times for equipment.
Ship-to-shore (STS) cranes, straddle carriers and rubber-tyred gantries (RTG”s) make up the bulk
of Transnet Port Terminals (TPT) requirements for port equipment. During recent Strategic
Sourcing interventions Transnet researched the global supplier universe (conducted before
approaching the market for competitive bids / tenders) for STS cranes and straddle carriers
(RTGs are manufactured by the same suppliers as straddle carriers).
An example of such market research into Port Equipment is shown in Figure 17 below. The South
African Marine Handling Equipment and Machinery sector is moderately competitive globally,
such as the example of local company IMPSA shows in the case of costing on STS cranes,
where it came in third in terms of price.
7
CSID Research Reports 2006/7
Page 39 of 91
Supplier Development Plan
Figure 17: Market Research on OEMs of Ship to Shore Cranes
As part of a Strategic Sourcing intervention Transnet SM compiles a key value driver (KVD) tree
for the commodity under review. The KVD tree for STS cranes in Figure 18 shows the three key
cost drivers for STS cranes over their life cycle, namely the purchase price (58%), maintenance
costs (16%) and mid-life refurbishment (10%). The example again shows IMPSA’s costs relative
to an international competitor.
Page 40 of 91
Supplier Development Plan
TCO GROUPING IMPSA Rxm LIEBHERR Rxm AVERAGE Rxm % Split
Energy 6.73 6.73 6.73 6.0%
Maintenance cost 17.61 18.59 18.10 16.1%
Maintenance cost - Electrical Spares 0.63 0.63 0.63 0.6%
Maintenance cost - Mechanical Spares 7.09 8.77 7.93 7.1%
Purchase costs 70.00 61.00 65.50 58.3%
Mid-Life Refurbishment 11.34 11.34 11.34 10.1%
Warehousing/Inventory Cost 1.20 1.20 1.20 1.1%
Disposal cost 1.00 1.00 1.00 0.9%
Grand Total 115.59 109.25 112.42
Maintenance cost Crane
Important Cost Components IMPSA Rxm LIEBHERR Rxm AVERAGE Rxm % Split
Painting of cranes 14.286 14.286 14.286 78.9%
Planned maintenance 3.325 4.300 3.813 21.1%
Grand Total 17.611 18.586 18.098
LIFECYCLE COSTING MODEL
Cost
Mid-Life Refurbishment Rxm % Split
Replace trolley brakes 2.00 17.6%
CRANES
Replacement of hoist motors dc 2.00 17.6%
Upgrading PLC and Drives 2.00 17.6%
Replacement of hoist gearbox 1.50 13.2%
TYPICAL
Replacement of trolley motors dc 0.78 6.9%
Replacement of hoist motors ac 0.64 5.6%
Overhaul trim list skew system 0.50 4.4%
Other 1.92 16.9%
Grand Total 11.34 In-Use Disposal
Procurement
Costs Costs
Costs
Figure 18: KVD tree for Ship to Shore Cranes
Page 41 of 91
Supplier Development Plan
8. Priority Interventions and Associated Sectors
Figure 19 outlines the phased approach that Transnet will be adopting in its CSDP implementation,
detailing the priority areas and associated sectors which Transnet has identified for rollout in the various
phases, listed below.
Figure 19: CSDP Phased Approach
Phase 0: Feasibility and Development Stage: Pilot Interventions
Phase 1: Rolling Stock and Port Equipment
(including working with DTI and Transnet suppliers with NIPP
obligations)
Phase 2: Infrastructure and Pipeline
Phase 3: Opex and other opportunities
Other: Emerging Opportunities
Based on the spend analysis that Transnet conducted (refer to Part 5) and the opportunity areas
identified to be best suited to CSDP interventions, together with the Supplier Industry Analysis
conducted (refer to Part 7), Transnet’s SDP will start off with an initial focus on those suppliers within
the manufacturing sector and the related support industries of Rolling Stock (R9 billion over five years)
and Port Equipment (R6 billion over five years).
For Transnet this translates into focusing on:
• Capital Equipment spare parts OEM manufacturing;
• Components and Assemblies; and
• Specialised Equipment Maintenance Skills (such as crane repair, port equipment maintenance;
locomotive assembly/maintenance, thermite welding, bearing repair etc).
Page 42 of 91
Supplier Development Plan
During Phase 0 Transnet identified and investigated numerous CSDP opportunities. For Phase 1 two
Priority areas have been identified with several capex and large Capitalised Operational Expenditure
(copex) purchases pending. Transnet will have to ensure that the organisation does not by-pass any
significant emerging opportunities through a too-narrow prioritisation of opportunities. In the first year
Transnet SM intends to concentrate its efforts on two or three key supplier development opportunities.
This will allow us to perfect the process, fine tune governance and controls, provide Operating Division
training and to ensure that localisation benefits are contracted with selected OEMs and benefit
realisation tracked through OEM contract management.
In starting off the CSDP programme, Transnet will be implementing in multiple phases. The Phase 0
pilot initiatives led to an overall programme approach and the identification of the two priority areas for
the first phase of implementation. In a similar way it is foreseen that Phase 1 lessons learnt in the
targeted environment could be built upon during Phase 2, to assist in better evaluation and
implementation of other CSDP opportunities on the horizon.
Transnet believes that in following this approach we will ensure that we shall:
• have adequate resources to prove the CSDP concept through aligning with major capex
purchases as part of the competitive bidding process;
• monitor the delivery of targeted CSDP initiatives as part of the capex contract management
process;
• shape our future supplier relationships and supply chains for manufactured equipment;
• be able to apply a similar procedure when we are able to address short-fallings or unravel NIPP
obligations in recent purchases of such manufactured equipment.
The following Figure 20 – Transnet Supplier Base and CSDP - is instrumental in demonstrating the
overall approach as it relates to Transnet’s focus areas, negotiation power during the deployment of its
“going to market” phase of Strategic Sourcing and activities in terms of Supplier Development.
Page 43 of 91
Supplier Development Plan
Transnet’s CSDP phase one Strategic Approach will be to focus on Tier 1 suppliers and
to assist them in engaging Tier 2 suppliers
Supplier Supplier
Supplier Base
Development Development
Category Activities
Transnet’s CSDP
Export
Port Equipment Rolling Stock SM personnel
lobby with
Sphere of Control
Focus
OEM Global
Sourcing Team
OEMs: Kalmar, Liebherr
OEMs: GE, GM, EMD,
Cranes, Straddle Carriers, SM personnel
Mitsui, Alstom, Siemens
RTGs, Tugs, Dredgers RFx process
Tier 1 and contract
OEM
Systems – negotiation
IP
Subsystems FDI
CSDP Focus
Suppliers’
TRE SM personnel
Kalmar DCD advise on
Liebherr / CPS Projects available
Tier 2 UCW Goods
partners and
Transnet’s ED
Alstom s Services
SCAW TRE
Assemblies involvement
SURTEES*
Focus
Skills
Suppliers’ PP Focus
SM personnel
Tier 3 identify ED
opportunities
Components
Sphere of Influence
Transnet’s
PP Focus
Other
*SURTEES IS A WAGON MANUFACTURER IN MINING INDUSTRY
**ED – Enterprise Development / PP – Preferential Procurement
Figure 20 shows how Transnet SM will be using its direct sphere of control to contract with OEMs as
tier-18 suppliers. By including CSDP requirements into tender documents for prioritised focus areas, SM
will be stretching its sphere of influence to reach tier-2 suppliers (being OEMs’ tier-1 suppliers).
Examples of CSDP related requirements, which Transnet SM could utilise in tenders to influence OEMs
to put together innovative proposals on ways to increase the localisation of their supply chains, could
include, amongst others:
• Aligning OEMs with appropriate tier-2 suppliers;
• Defining the degree of localisation and the role Transnet Rail Engineering (TRE) places in the
manufacturing / assembly / maintenance of the equipment;
• Recommending that tier-2 local suppliers participate in supplier benchmarking, as part of their
commitment to continuous improvement, thereby increasing OEM buyers’ visibility of local
suppliers’ capabilities, thereby enabling OEMs to broaden their supply base on a more scientific
basis, while increasing their security of local supply; and
• Requiring that chosen tier-2 and tier-3 local suppliers should be contributors to Broad-based
Black Economic Empowerment (BBBEE) by pre-defining acceptable BBBEE contribution levels in
terms of DTI's Codes of Good Practices.
Figure 20 therefore indicates Transnet’s CSDP obligations, being effected by means of the direct
contractual relationship with its overseas and / or local OEMs (Transnet tier-1 suppliers), who will be
accepting contractual localisation obligations to extend their supply chains to suppliers in South Africa.
The OEMs so contracted will thus retain the control and management over their supply chains, both
8
Tier-1 suppliers are those suppliers who provide the product or service which Transnet is directly procuring (locomotives, cranes,
etc). Tier-2 suppliers provide assemblies and sub assemblies or major skills for the Tier-1 suppliers. Tier-3 suppliers provide the
components or general labour for the above tiers.
Page 44 of 91
Supplier Development Plan
internationally as well as locally. The OEMs’ newly introduced local tier-1 suppliers become Transnet’s
tier-2 suppliers in the future, while OEMs’ local tier-2 suppliers are Transnet’s tier-3 suppliers.
Figure 20 furthermore points out the three types of Supplier Development activities that Transnet will
be engaging in (also refer to Part 3) in terms of these supplier relationship activities, namely:
• CSDP with OEMs as Transnet’s tier-1 suppliers;
• Enterprise Development (ED) in support of OEMs’ tier-1 and tier-2 local suppliers, engaged in
manufacturing subassemblies and components for OEMs respectively (being Transnet’s tier-2
and tier-3 suppliers); and
• Preferential Procurement (PP) in terms of other local suppliers.
Finally Figure 20 indicates the types of SM activities that Transnet SM will perform in terms of
managing supplier relationships at the various tier levels, namely:
• Transnet’s buyers will interact with its overseas and / or local OEMs (tier-1 suppliers) by:
Means of the tender or RFx (Request for Information / Proposal / Quotation) process to
-
contract with OEMs; as well as
Lobbying with OEMs’ buyers to promote certified local suppliers as an attractive alternative
-
source of supply in OEMs’ predominantly international supply chains. Transnet could thus
assist its local tier-2 suppliers who have attained Centre of Competence certification, by
contracting with OEMs to grant such local suppliers the rights to sell into OEMs’ international
supply chain (i.e. become exporters), provided that those local suppliers can meet the OEM
buyers’ cost and quality criteria for example.
Advising OEMs on the role of TRE, either as the maintenance division of Transnet and/or as
-
a preferred supplier, as the case may be; and
Advising OEMs on available9 local partners to manufacture sub-assemblies.
-
• Transnet’s buyers will also engage with OEMs in setting up Transnet’s third-tier local
suppliers by:
Advising OEMs on the role of TRE as a preferred manufacturer of component(s), if
-
applicable; and/or
Advising OEMs on available local partners to manufacture (other) components; and/or
-
Identifying Enterprise Development opportunities for such tier-3 suppliers.
-
Phase 0 – Feasibility and Development Stage: Pilot Interventions
Transnet SM decided to follow an emergent strategic approach in developing its SDP, that is to
“learn by doing”. Seeveral pilot opportunities were identified and subjected to the following process:
• Pre-Feasibility (idea stage – relevant to unsolicited bids)
• Feasibility (in discussion with potential suppliers):
• Business Case (actual opportunity benefits are determined).
The status of Transnet’s pilot initiatives are listed below:
9
Every effort will be taken to ensure that OEMs do not engage with suppliers who have been disqualified by Transnet.
Page 45 of 91
Supplier Development Plan
Intervention Phase Commodity/ Comments
Type Company
Pre-feasibility Train Toilets
Increased The company contacted the office of the
Export Consulate-General of the Republic of South
Capacity / Africa to determine if there is an opportunity to
Local invest in South Africa.
Expansion This may be beneficial in the light of the new
locomotives being assembled in South Africa.
Pre-feasibility Sleepers
Local Transnet Freight Rail (TFR) is currently
Expansion discussing opportunities with two international
manufacturers, to establish facilities in
competition with the local sole supplier. Another
supplier in the market may be a catalyst for
competitive pricing.
Pre-feasibility Pipeline
Local On the power of the Transnet business, our
Expansion current supplier (pending award) will expand
local facilities not only to supply Transnet but
also for exports
Pre-feasibility Scrapped rails
Local The company contacted SSM to determine if
Expansion there is an opportunity to buy scrap rails at less
than market price, which would enable them to
compete with the Chinese in the global market of
striking tools, shovels and spades.
Pre-feasibility
OEM Electric We need to revisit the current electric
Manufacturing locomotives locomotives, to determine whether local content
and train can be expanded. This may be an opportunity to
components implement a NIPP Direct proposal to DTI.
Having a local manufacturer of components and
sub assemblies would reduce order lead times,
safety stock and freight costs.
Pre-feasibility
OEM Bulk Handling Our current supplier has large NIPP
Manufacturing Equipment commitments, but no approved plans to deliver.
/ Skills (marine) We have an agreement with the DTI to develop a
Transfer plan on how to meet these NIPP obligations in
combination with their new CSDP requirements.
Pre-feasibility
OEM Bearing Currently, these companies repair our large
Manufacturing Manufacture component bearings. We need to determine
and Repair their appetite for further partnering with local
companies for this activity, as well as opening
local plants.
Localised repair and production would reduce
lead times and cost.
Business Case Brake Shoes
OEM The manufacturer has partnered with a local
Manufacturing manufacturer to open a factory (currently in
production). The facility was built on speculation
that they had a chance at being awarded the
Page 46 of 91
Supplier Development Plan
Intervention Phase Commodity/ Comments
Type Company
next tender. Should they win the award, we will
measure NVA (National Value Add) in this
industry.
Locomotives
OEM Feasibility We are currently in negotiations for the provision
Manufacturing (pending of 212 diesel locomotives, We have agreed in
/ Skills signature of principle to a 40% localisation of manufacture
Transfer the contract) and assembly of the locomotives.
Figure 21: CSDP Phase 0 Initiatives
Lessons learnt from Phase 0 pilot opportunities
Transnet SM started off using the model as defined by the DPE to develop its SDP. Due to a lack of
market-supply information and industry analysis on Transnet’s overall spend base, our first exposure to
the programme began with numerous, unconnected initiatives.
Focusing on these initial opportunities served a valuable purpose in putting together Transnet’s
proposed CSDP approach as well as deciding on a multi-phased implementation. A number of
unexpected, but critical, lessons emerged from investigating these opportunities:
• Source of opportunities: unsolicited versus competitive bids
Most of the opportunities under investigation came to our attention through unsolicited proposals
from suppliers interested in longer-term relationships. Others were linked to strategic sourcing
initiatives. It became clear that these types of initiatives were problematic in that they were not
governed by the competitive bidding/tendering process, which meant that extraordinary due
diligence and analysis was necessary making it very time consuming.
In fact, following up on unsolicited CSDP proposals that were ill-aligned to Transnet’s capital
expansion too often resulted in SM resources being deployed to investigate opportunities with a
relatively low return in terms of NVA improvement based on relatively smaller spend
commodities, than could have been achieved by merely focusing on the major capex areas. Most
of the deals ended up actually benefiting the prospective new suppliers more than Transnet, in
that it would have enabled these suppliers to become an exclusive local source of supply to
Transnet.
Thus although many procurement mechanisms can be employed to obtain CSDP localisation
proposals, (including competitive bidding, strategic-supplier negotiations without going to open
tender, unsolicited bids etc.), using the unsolicited bids above without using the well-known
tendering process to proved problematic.
• Focus of opportunities: top 20 opex commodities versus high-value capex
Initially, it was assumed that opportunities would be found in the top-20 value opex commodities,
such as wheel centres. This is the traditional focus of Strategic Sourcing interventions. However,
it was realised that focusing on CSDP during the sourcing process involved additional resources
and often caused confusion in the market (strategic sourcing itself was already a new dynamic
that strained relationships). Focusing on high-value capex equipment, provided more
opportunities for improving costs and impacting future supply chains through localisation.
In addition, the tender process gave the inexperienced SM teams the ability to select the most-
competitive strategic OEM international partner based on technical know-how and commercial
considerations, while also “crowding in” innovative thought on how best to localise the supply
Page 47 of 91
Supplier Development Plan
chain. Through ensuring that localisation is subjected to the same rigour of competition between
OEM bidders, the risk related to CSDP initiatives can be contained.
• Internal CSDP opportunity: Transnet Rail Engineering (TRE) as preferred tier-2 supplier
The third lesson came from the results of the industry analysis that indicated that Transnet Rail
Engineering (TRE) has a dominant supplier position in the local market initially in Rolling Stock
maintenance and manufacturing and possibly extending this into Port Equipment maintenance
over the medium term. Discussions between TRE, TPT and TNPA (Transnet National Ports
Authority) will be held shortly to discuss the ports’ maintenance requirements and TRE’s ability to
meet these needs.
It would be a critical error in judgment not to leverage Transnet’s current strength in maintenance
and engineering. Transnet will need to place TRE at the centre of Transnet’s CSDP programme.
However, for TRE to obtain preferred tier-2 supplier status, there are three pre-conditions that
must be meant, namely that:
- TRE has no intention of becoming a locomotive OEM (design and sale of fit-for-purpose
locomotives to the market), as this would create a conflict of interest in Transnet SM allowing
TRE access to OEM proprietary information in its becoming part of the OEM’s local supply
chain;
- TRE’s manufacturing would be based on target costing to ensure global cost
competitiveness; and
- TRE commits to continuous improvement, as supported by independent supplier
benchmarking and/or success of the Lean implementation programme.
The Pilot opportunities will now be realigned to the multi-phased focused CSDP approach.
Phase 1 – Priority Areas: Rolling Stock and Port Equipment
The practical three lessons from the Phase 0 prototyping (as detailed above) were combined with the
theoretical approach described in Part 6, to increase the robustness of CSDP implementation in
Phase 1.
In order to optimise Transnet’s benefits in terms of increased National Value Add (NVA), while still
dealing with limited resources in terms of capability, capacity and willingness, it will be necessary in
Phase one of CSDP implementation that:
• the source of localisation proposals should preferably be via a low-risk tender-based environment
in terms of the “going to market strategy”;
• the initial focus should be on recent and pending purchases of high-value capex equipment (rail
and port), together with its related year-on-year future opex spend to maintain this equipment;
• TRE should factor optimally into the relationships being structured with overseas OEMs
(Transnet’s tier-1 suppliers) by:
being involved in all assembly projects to understand the future maintenance and spares
-
requirements;
becoming a tier-2 supplier itself, through manufacturing components and/or assembling sub-
-
systems for the OEM, where this is commercially optimal; and
being recognised as the party responsible for maintenance of the newly-acquired capital
-
equipment and therefore having an acknowledged key role in managing the newly-localised
supply chain.
Page 48 of 91
Supplier Development Plan
Phase 1 will target those areas where maximum immediate NVA is thought probable, by linking
CSDP initiatives directly to the priority capex purchases for manufactured equipment for Rail and
Port expansion projects. As such, the Phase 1 focus will primarily be on engaging with the tier-1
OEM Suppliers of recent and pending purchases for Rolling Stock and Port Equipment. Figure 20
indicates the key suppliers (tier one and two) and/or commodities in the primary focus areas of port
equipment and rolling stock where CSDP opportunities may exist.
Page 49 of 91
Supplier Development Plan
9. Key Performance Indicators
Transnet believes that its first CSD plan, though not based on perfect historical spend data, was
developed to optimise the organisation’s benefits in terms of increased NVA. Through adopting a
many-phased, focused rollout approach, Transnet will be able to deal with its plans for skills upliftment,
while putting in place a comprehensive change-management programme at the same time as
launching Phase 1 of its CSDP rollout.
Transnet’s Phase 1 implementation focus will be on recent and pending purchases of high value
Rolling Stock and Port Equipment, jointly valued at R15 billion over the next five years. TRE will be
factored into each deal being structured with an overseas and / or local OEM in an optimal manner by
recognising TRE’s key role as “maintainer of choice” for Rolling Stock in the short term (with the
possibility of extending this to Port Equipment) and thus in managing the newly-localised supply chain;
and/or by TRE itself becoming a tier-2 and/or tier-3 supplier, through assembling sub-systems and/or
manufacturing components, should this be commercially optimal.
Figure 22: CSDP Continuous Improvement Map
As detailed in Figure 22 above, as well as described in Part 10, Transnet’s SDP will be supported by an
extensive Change Management Programme, of which one component is the on-going rollout of
Transnet’s large-scale procurement capacity and capability programme.
Part 4 contains Transnet’s four key critical success factors to continuously improving the organisation’s
CSDP performance expressed as the overall CSDP programme’s five-year objectives. Transnet will be
measured by how well it has fulfilled these four objectives by its progress in improving its direct CSDP
initiative. It will also be measured by its progress in implementing the practices needed to support the
CSDP.
Page 50 of 91
Supplier Development Plan
The CSDP programme KPIs that Transnet will focus on include:
• Direct measures of the success of the CSDP initiatives themselves; and
• Indirect measures to track improvement in business and SM practices.
Objective no 1:
CSDP Delivery (KPI No 1):
CSDP initiatives deliver localisation benefits in line with OEM-contracted requirements
• How is Transnet SM doing against its detailed CSDP implementation plan (measure of
anticipated change)?
- Status of each CSDP opportunity against plan
- Supplier Performance against contract
• Has Transnet’s spend profile changed and is the SDP still aligned to this spend and the market?
- Conduct an annual spend analysis (historical spend)
- Review key suppliers and commodities to ensure alignment
- Review resource base and ensure that we are generating value.
Objective no 2:
Increasing SDP scope and detail (KPI no 2):
Periodic updates of SDP reflect improvement of business practices and SM practices
• Is Transnet’s five-year spend (capex and opex) determined and visible to SM and can a ten-year
estimated spend be determined?
• What progress is visible in updated SDPs in terms of improvement being made in terms of:
Operating Division management using longer-term demand planning?
-
Technical experts improving the use of standardisation practices in driving down the life-
-
cycle costing of manufactured equipment? and
Supply Management broadening its reach of Strategic Sourcing practices in (capex)
-
commodities?
Objective no 3:
SM capability improvement (KPI no 3):
Transnet’s SM practices are maturing to improve support of Supplier Development initiatives
• How is Transnet SM doing against the Critical Path and Flight Plan (Continuous Improvement)?
• Are the KPIs of the strategic objectives being met (as documented in Transnet’s Strategic
Directive)?
• Is Transnet SM meeting its change-programme objectives and are our skills sets improving?
Compare “AS IS” status to expected performance
-
Benchmark capabilities against baseline
-
Review control framework calculations against expected progress
-
Page 51 of 91
Supplier Development Plan
Objective no 4:
Supply Management skills upliftment (capacity) ( KPI No 4):
Transnet’s SM staff applies procurement best practices in a professional manner
• How is Transnet SM doing against the ICCPP professionalisation planning?
• Are Transnet SM’s staff skills sets improving?
Compare “AS IS” status to expected performance
-
Benchmark competencies against baseline
-
• Are cycle times improving? Is this leading to more capacity for value-added activities?
• Has Transnet achieved its training targets for Supplier Development practitioners?
Page 52 of 91
Supplier Development Plan
10. High-level implementation plan
Transnet’s SDP was developed to be robust and practical, surrounded by an in-depth change-
management programme, within the necessary governance and controls for staff to achieve success.
As implementation is seen as critical, Transnet SSM clearly stated that it will not issue a theoretical plan
without focusing on enabling Transnet to achieve its overall business objective of increasing its market
share through increasing capacity by means of successfully rolling out of the capex programme on time
and within budget.
In addition to an internal-mobilisation plan, it is foreseen that Transnet’s CSDP initiatives will have to be
supported with an in-depth Change-Management Programme (CMP) aimed both at internal
organisational transformation and at external collaboration with the supply industry and other
government stakeholders. Transnet believes that its comprehensive implementation focus on managing
stakeholders will ensure that Transnet’s SDP is not merely issued to satisfy compliance requirements of
the DPE. It will also focus on the true spirit of CSDP by making a contribution to NVA by localising
Transnet’s manufactured-equipment supply chain to a realistic level.
a) Internal Mobilisation plan
Transnet’s detailed mobilisation plan (see example below Figure 23) will be finalised as soon as this
SDP is approved by DPE. Two components that have already been determined are the changes
required in terms of SM policy and procedures, as well as the need to establish an integrated
communications plan. These two components are discussed below.
Figure 23: High Level Plan
Policy and Governance
Part of Transnet’s turnaround strategy, which has now been completed, was to ensure that we follow
good corporate governance and that we embed a control mentality ethos in our staff and in our
processes. This required Transnet SM, as part of the second Critical Path focus area (also refer to
Part 4), to develop its policies, procedures and governance prior to implement any new programme
fully. This needs to be done for CSDP as well as for subsequent programmes.
Page 53 of 91
Supplier Development Plan
In theory, senior Transnet staff understand the benefits of participating in a CSDP programme.
Culturally, however, many are extremely reluctant to engage in any activity that is not supported by
policy as detailed in the organisation’s DPP (Detailed Procurement Procedure). Since CSDP is an
unfamiliar procedure, staff is not sure of how to proceed. As such they will not participate before the
“rules of engagement” are completely detailed in the DPP.
Figure 24: The Supplier Development Value Chain
While formulating this first SDP, Transnet SM also started developing the appropriate control
mechanisms to manage CSDP. They include:
• Updating the DPP with the appropriate policies to govern the process;
• Designing appropriate procedures (based on the value chain shown above in Figure 24) to
manage the process;
• The use of robust templates, complete with instructions on how to complete these templates;
• The creation of a control framework to ensure that we have consistent means of managing and
auditing the process; and
• Developing a set of KPIs and measures (including means to calculate) that are applicable in the
delivery of an opportunity.
Developing the Integrated Communication Plan
For the CSDP programme to be successful, Transnet must ensure that it has a well-considered,
comprehensive plan to manage its communications, public notifications and CSDP tender
opportunities.
The communications plan will address:
• Types and frequency of meetings with our stakeholders – internally and externally (also refer to
Part 10);
• The framework for the messages and/or information that must be communicated, the intended
audiences and expected delivery times;
• Those purchases that are likely to contain a CSDP or Enterprise Development opportunity and
that will ensure that the appropriate category manager or buyer is notified; and
Page 54 of 91
Supplier Development Plan
• The frequency and subject of oversight meetings with suppliers who have a current CSDP
contractual obligation.
Stakeholder communication and interaction
The plan will ensure that all key stakeholders are informed of Transnet’s CSDP on a regular basis. It
is proposed that Transnet should engage in regular sessions with government’s support partners,
such as DTI, DST and the IDC to discuss progress, to share experiences and to identify and to work
together on areas of collaboration.
Supplier and industry association communication and interaction
The plan will ensure that all key tier one suppliers (overseas and/or local OEMs), as well as current
and potential local tier two or three suppliers, via local industry associations, are informed of:
• Transnet’s procurement process, including CSDP and the selection criteria of the commercial and
supplier-development processes;
• Transnet’s CSDP progress on a continual basis.
Information on Transnet’s procurement process, including CSDP criteria, is important, as many local
suppliers have an entitlement mentality, believing that participating in the tender process or merely
being in the distribution corridors within the Transnet supply chain warrants business.
When dealing with off-shore suppliers, the CSDP message could be linked to the concept of
Corporate Social Responsibility (CSR) and Sustainability Management in explaining Transnet’s
requirements. This can help to leverage localisation requirements effectively. Overseas OEMs and
local suppliers alike must be informed that all Transnet CSDP deals will be:
• proceeded by thorough supplier due-diligence studies. This will include a supplier universe, a
specific analysis of the supplier(s) in question and a review of those suppliers seemingly in
control of the sub sector. This analysis will also include the review of Transnet’s current supplier
relationships;
• subject to supplier benchmarking so as to establish a baseline of performance against industry
peers and to monitor performance against agreed targets.
b) Change Management Programme (CMP)
The envisaged CMP will address Transnet as an organisation (internal focus) and look towards
collaboration with CSDP stakeholders (external focus).
Stakeholders need to be managed on both fronts as well. Transnet cannot achieve the benefits of
CSDP in a vacuum. It is essential that key stakeholders, internal and external, should be engaged
from the onset to:
• ensure alignment;
• avoid duplication of effort;
• optimise the benefits of the CSDP initiatives; and
• ensure that the shared experiences of the process are recorded and built into new initiatives on a
continuing basis.
This will reinforce so-called “double-loop learning” and strengthen future CSDP initiatives for all
stakeholders.
Page 55 of 91
Supplier Development Plan
Internal change management
Internal organisational transformation will be address as follows (detailed in Part 4):
• Short-term focus
Building internal support for CSDP;
-
Putting in place CSDP structures and resources;
-
Continuing SM skills upliftment;
-
Strengthening SM governance regarding CSDP; and
-
Building best-practice risk management into the CSDP process.
-
• On-going continuous improvement focus
Developing best-practice Supply Management, including benchmarking of Transnet’s SM
-
capabilities; and
Developing best practice Demand Management, including improving long-term forecasting
-
and focusing on (equipment) standardisation.
Stakeholders who need to be managed inside the organisation include;
A. INTERNAL STAKEHOLDER WHAT TRANSNET NEEDS
•
TRANSNET EXCO Support for supplier development in general and CSDP
specifically
•
BU EXCO Support for supplier development in general and CSDP
specifically
• Timeous execution of approved business cases
• Follow governance and procedure
•
BU CPOs Identification and communication of opportunities
• Timeous execution of approved business cases
• Follow governance and procedure
• Ensure appropriate staff attend training and are
continually trained in Supplier Management /
Development
• Ensure that the structure supports continuous Supplier
Development and Management
• Provide spend information quarterly
Figure 25: Internal Stakeholder Management
External change management: government support to local supply base
As part of the initial development of participating SOEs’ SDPs, SPAID at the request of the DPE
facilitated the process of consultation between:
• Participating SOEs, namely Transnet, Eskom and PBMR;
• the Supply Industry via various Industry Associations; and
• the Government Sector (incl DTI, DST, IDC etc)
to identify industry perspectives in terms of comparative advantage, areas of excitement and areas
of productivity improvement.
Page 56 of 91
Supplier Development Plan
As depicted in the diagram below (Figure 26), Transnet believes that the implementation phase of
SDPs should include continued collaborative industry interaction. As implementation gets
underway, it would be advisable to build on the relationships established during the development of
SDPs. Under DPE’s guidance the interactions could be hosted as a collaborative forum so as to
share progress and compare experiences on such matters as (supplier) benchmarking, enterprise
development, industry development, development financing and technology upgrading.
From an SOE perspective, Transnet believes such collaboration will assist in building better
practices in subsequent CSDP implementation phases, while assisting in creating a more-cohesive
picture of future prioritised capex requirements with local industry.
Transnet believes that continued industry collaboration will signal the organisation’s commitment and
showcase its (improving) ability to procure coherently and efficiently, while managing effective win-
win relationships with suppliers on all tiers. Should all participating SOEs start using this signalling
mechanism, we have a better chance of creating a conducive investment and capability-
development environment in national industries, which should in the medium to longer term allow a
progressive lowering of the costs of doing business for participating SOEs.
Figure 26: Continued Industry Collaboration post SDP development
Page 57 of 91
Supplier Development Plan
Transnet’s needs in relation to its external stakeholders interested and/or involved in CSDP, is detailed
in the table below,
B. EXTERNAL STAKEHOLDER WHAT TRANSNET NEEDS
•
DPE Gain support for CSDP among other government
agencies, such as DTI, DST and IDC
• Communicate successes of CSDP initiatives publicly –
this is important to participating OEMs
• Provide assistance to participating SOEs as required,
such as:
Resources, for example: benchmarking through
-
UNIDO, research through Wits University
Funding advise,
-
• Create an SOE Forum to share experiences and ideas
on:
- CSDP initiatives;
- internal change-management activities (also refer to
Part 10); and
- external change-management activities (also refer to
Part 10)
• Continue the Supplier Benchmarking Forum between
participating SOEs, interested government stakeholders
and UNIDO (as the benchmarking service provider). Post
the development of SDPs to:
- share benchmarking experiences a continuous basis
so as to improve the methodology;
- improve engagement models to reach more potential
subscribers to the benchmarking service, both in the
international realm (overseas OEMs’ sellers &
buyers), as well as potential local SOE tieri2 and tier-
3 suppliers;
- share relevance of the to-be-established database of
benchmarked local tier-2 and/or tier-3 local suppliers
as a means for tendering OEMs to propose
participants for localising their supply chains;
- share experiences on continuous improvement
actions taken by benchmarked local tier-2 and/or
tier-3 local suppliers through the contractual
feedback to be provided by OEMs on the
implementation of their localisation plans;
- share experiences of benchmarked local tier-2
and/or tier-3 local suppliers who sell to OEMs’
international supply chains.
• Create a forum for general collaboration on CSDP
between participating SOEs and government
stakeholders (such as DTI, DST, IDC, CSIR etc) and
post the development of Supplier Development Plans to
share experiences on a continuing basis
• Facilitate collaboration between participating SOEs and
Industry Associations post the development of SDPs to
Page 58 of 91
Supplier Development Plan
B. EXTERNAL STAKEHOLDER WHAT TRANSNET NEEDS
share experiences and future opportunities on a regular
basis
•
DTI Joint assistance (development of a procedure) in
“unwinding” our suppliers from their NIPP obligations
aligned to their CSDP obligations
• Assistance for OEMs with registration and legal issues in
setting up operations in South Africa
• Assistance for OEMs with customs and duties for SOEs’
mega project imports
• Identification of potential suppliers and industries, based
on DTI’s industry knowledge
• Assistance in leading and supporting trade delegations to
OEM procurement personnel
• Acceptance of this plan
•
DST & CSIR Assistance for suppliers requiring Research and
Development on new technologies, or in teaming up with
OEMs’ technologies
•
IDC Provide (development) funding options, as required by
either OEMs and/or local tier-2 and/or tier-3 suppliers
• Provide advise and/or assistance to Transnet SM on:
- business case development for CSDP opportunities;
- due diligence of local suppliers requesting
admittance to CSDP on a business case-by-case
basis
• Provide access to IDC market research on industry
information and statistics
•
RESEARCH BODIES Provide information as required
(WITS UNIVERSITY, CSIR etc )
•
SPAID Hosting of collaboration initiatives in developing SDPs
• Review and acceptance of this Plan
•
INDUSTRY ASSOCIATIONS Liaise with Supplier Development Managers with respect
to market dynamics and dissemination of information
(communication)
• Sector information
• Review and acceptance of this Plan
Figure 27: External Stakeholder Management
Page 59 of 91
Supplier Development Plan
11. CONCLUSION
Transnet’s long-term aim with CSDP is to localise its supply chain of imported manufactured goods or
services to a reasonable level while promoting local industries and South Africa as an off-shore site of
choice for OEM’s and multi-nationals’ procurement personnel. This will depend on Transnet’s ability to
create a cohesive picture of future spend, to be the catalyst for local suppliers’ investment in their own
capacity and in their capability to meet Transnet’s future requirements.
To achieve this ambitious aim, over the next five years Transnet will need to implement CSDP in a
phased manner, starting off by engaging with opportunities in two priority-focus areas, namely Rolling
Stock and Port Equipment, while preparing SM staff to exploit emerging localisation opportunities. The
CSDP rollout will be supported by a holistic Change Management Programme, which will include a
strong focus on stakeholder management and communication.
Transnet’s CSDP will be implementing in various phases. The Phase 0 pilot initiatives led to an overall
programme approach and to the identification Rolling Stock and Port Equipment as of the two priority
areas for the first phase of implementation. Phase 1 lessons learnt in the targeted environment will be
built into Phase 2, which will focus on Infrastructure and Pipelines. Emerging CSDP opportunities on the
horizon will be dealt with on an ad hoc basis.
While Transnet realises that a localised supply chain of previously-imported manufactured goods or
imported services may not necessarily result in direct cost reduction, it will result in shorter lead times,
lower transport costs and better control of quality on components and sub-assemblies. On a macro
level it will create employment and serve to increase the country’s export base for manufactured
equipment and components.
Transnet believes that in following its proposed approach we will be reducing risk and ensuring that:
• we have adequate resources to prove the CSDP concept through dovetailing with major capex
purchases, as part of their competitive bidding process;
• delivery of these targeted CSDP initiatives is monitored as part of the capex contract
management process; while
• Transnet can shape the future of its supplier relationships for targeted high-value capex
equipment (OEMs on tier-1 with its increased localised supply chains for tier-2 and tier-3
suppliers); to be closely followed by
• Unraveling the past by reviewing recent purchases of such manufactured equipment, so as to
avoid possibly sub-optimal localisation outcomes.
By doing this, Transnet will use the timely and effective roll-out of its capex programme to benefit the
South African economy by developing competitive national supplier industries for targeted manufactured
equipment.
Page 60 of 91
APPENDIX A: Sub Sector Details
Locomotives (D, E, D-E,
Mobile Harbour Cranes
Subsectors on tier one
Opportunity for CSDP
Ship to shore cranes
Rubber Tyre Grantry
Straddle Carriers
Tugboats
Capital Equipment ►
Dredgers
Wagons
Cranes
and 2
MC)
Subsectors Identified for CSDP Discussions
Focus Areas + tiers ▼
tier one tier two tier three
Engines x - x x x x x - 38 Electricity distribution and control apparatus
Alternator
Main battery, backup
Engines x - x x x x x - 40 Accumulators, primary cells and primary batteries
Battery System system, regeneration
Engines x - x x x x x - 29 Basic iron and steel products
Engine Block Steel, casting
Engines x - x x x x x - 49 Parts and accessories
Fuel Injection injector valves
Engines x - x x x x x - 49 Parts and accessories
Exhaust steel, welding
Engines x - x x x x x - 38 Electricity distribution and control apparatus
Auxilliary diesel alternator
Engines x - x x x x x - 29 Basic iron and steel products
Block Valves
Engines x - x x x x x - 32 Other fabricated metal products
Cooling system
Steering Mechanism x - x x x x x - 32 Other fabricated metal products
Steering Axle
Steering Mechanism x - x x x x x - 29 Basic iron and steel products
Steering wheel
Braking System - - - - - x - x 49 Parts and accessories
Air brakes
Braking System - - - - - x - x 49 Parts and accessories
vacuum brakes
Braking System x x x x x x x x 49 Parts and accessories
Parking brake
Braking System x - x - - - - x 49 Parts and accessories
Disk Brake
Braking System x - x - - x - x 32 Other fabricated metal products
Brake Blocks
Braking System x x x x - - - - 32 Other fabricated metal products
Brake shoes and drums
Braking System x x x x x - x - 49 Parts and accessories
Hoist brake
59
Supplier Development Plan
Appendix A (cont.)
Grantry Cranes
(D, E, D-E, MC)
Subsectors on
tier one and 2
Ship to shore
Locomotives
Rubber Tyre
Opportunity
Tugboats
for CSDP
Dredgers
Straddle
Harbour
Wagons
Carriers
Capital Equipment ►
Cranes
cranes
Mobile
Subsectors Identified for CSDP
Discussions
Focus Areas + tiers ▼
tier one tier two tier three
Electrical System x x x x x x x - 39 Insulated wire and cables
Cable
Electrical System x x x x x x x - 38 Electricity distribution and control apparatus
Alternator
Electrical System x x x x x x x - 41 Electric lamps and lighting equipment
Lighting Bulbs
Electrical System x x x x x x x - 41 Electric lamps and lighting equipment
Lighting Switches
Electrical System x x x x x x x - 41 Electric lamps and lighting equipment
Lighting Conductor
Electrical System x x x x x x x - 37 Electric motors, generators, transformers
Auxilliary generator
Electrical System x x x x x x x - 38 Electricity distribution and control apparatus
Power Units
Electrical System x x x x x x x - 42 Other electrical equipment
Electrical boxes
Electrical System x x x x x x x - 42 Other electrical equipment
Auxilliary Switchboard
Propulsion System - - - - x - x - 30 Non-ferrous metal products
Brass Impellors
Lifting Mechanisms x x x x x - x - 29 Basic iron and steel products
Cable Chain
Lifting Mechanisms x x x x x - x - 38 Electricity distribution and control apparatus
Load sensor cells
Lifting Mechanisms x x x x - - - - 31 Structural metal products
Lifting boom Frame
Lifting Mechanisms x x x x - - - - 31 Structural metal products
Lifting boom Suspension
Lifting Mechanisms x x x x - - - - 34 Special purpose machinery
Lifting boom Hydraulics
Lifting Mechanisms x x x x x - x - 29 Basic iron and steel products
Rope sheaves
Lifting Mechanisms x x x x x - x - 33 General purpose machinery
Cranes
Lifting Mechanisms x x x x x - x - 50 Other transport equipment
Skew Transfer
Lifting Mechanisms x x x x x - x - 29 Basic iron and steel products
Yoke
60
Supplier Development Plan
Appendix A (cont.)
Subsectors on tier
Straddle Carriers
Locomotives (D,
Mobile Harbour
Opportunity for
Grantry Cranes
Ship to shore
Rubber Tyre
E, D-E, MC)
one and 2
Tugboats
Capital Equipment ►
Dredgers
Wagons
Cranes
cranes
CSDP
Subsectors Identified for CSDP Discussions
Focus Areas + tiers ▼
tier one tier two tier three
Transmission System x x x x x x x - 49 Parts and accessories
Draw gear
Transmission System x x x x x x x - 49 Parts and accessories
Gearbox gears, plates
Transmission System x x x x x x x - 49 Parts and accessories
Clutch
Transmission System x x x x x x x - 49 Parts and accessories
Levers
Mechanical fluid transfer x x x x x x x x 32 Other fabricated metal products
Valves
Mechanical fluid transfer x x x x x x x 33 General purpose machinery
Pumps
Mechanical fluid transfer x x x x x x x - 33 General purpose machinery
Compressors
Mechanical fluid transfer x x x x x x x x 29 Basic iron and steel products
Cylinder
Miscellaneous Marine
Mechanical fluid transfer - - - - x - x - 34 Special purpose machinery
equipment
Mechanical fluid transfer x x x x x x x x 31 Structural metal products
Piping
Bogies - x - - - x - x 31 Structural metal products
Axles
Bogies - x - - - x - x 31 Structural metal products
Wheels
Bogies - x - - - x - - 29 Basic iron and steel products
U-tube
Bogies - x - - - x - - 29 Basic iron and steel products
Canonbox
Bogies - x - - - x - x 32 Other fabricated metal products
Bearing
Bogies - x - - - x - - 37 Electric motors, generators, transformers
Traction Motor
Bogies - x - - - x - - 49 Parts and accessories
Pinion gear
Bogies - x - - - x - x 31 Structural metal products
Sideframe
Bogies - x - - - x - x 32 Other fabricated metal products
Springs
61
Supplier Development Plan
Appendix A (cont.)
Subsectors on tier
Straddle Carriers
Locomotives (D,
Mobile Harbour
Opportunity for
Grantry Cranes
Ship to shore
Rubber Tyre
E, D-E, MC)
one and 2
Tugboats
Capital Equipment ►
Dredgers
Wagons
Cranes
cranes
CSDP
Subsectors Identified for CSDP Discussions
Focus Areas + tiers ▼
tier one tier two tier three
Locking Mechanism x x x x - - - x 34 Special purpose machinery
Twist Locks
Petroleum, chemical products, rubber and plastic
Hydraulic System x x x x x x x - 25
Hydraulic hoses
products
Hydraulic System x x x x x x x - 33 General purpose machinery
Hydraulic Pumps
Structure x x x x x x x x 31 Structural metal products
Body Frame
Beams, frames, steel
Structure x x x x x x x x 31 Structural metal products
Chassis welding
Structure x x x x x x x x 31 Structural metal products
Steps and Ladders steel, welding
Structure x x x x x x x x 31 Structural metal products
Underframe steel, welding
Structure x x x x x x x 26 Glass and glass products
Windscreen
Structure x x x x x x x x 31 Structural metal products
Suspension system steel, welding
Structure x x x x x x x x 31 Structural metal products
Platforms steel, welding
Structure x x x x x x x x 31 Structural metal products
Guard Rails steel, welding
Structure x x x x - - - - 31 Structural metal products
Columns steel, welding
Structure x x x x x x x x 31 Structural metal products
Sill Beams steel, welding
Structure x x x x x x x x 31 Structural metal products
Side Beams steel, welding
62
Supplier Development Plan
Appendix A (cont.)
Subsectors on tier
Straddle Carriers
Locomotives (D,
Mobile Harbour
Opportunity for
Grantry Cranes
Ship to shore
Rubber Tyre
E, D-E, MC)
one and 2
Tugboats
Capital Equipment ►
Dredgers
Wagons
Cranes
cranes
CSDP
Subsectors Identified for CSDP Discussions
Focus Areas + tiers ▼
tier one tier two tier three
Micro
Control + Instrumentation System x x x x x x x - 45 Professional equipment
computers
Control + Instrumentation System x x x x x x x - 45 Professional equipment
PLC Systems
Field
Control + Instrumentation System x x x x x x x - 45 Professional equipment
Instruments
Control + Instrumentation System x x x x x x x - 29 Basic iron and steel products
Levers
Hydraulic
Control + Instrumentation System x x x x x x x - 38 Electricity distribution and control apparatus
control
Facilities - - - - x x x - 27 Non-metallic mineral products
Toilets
Facilities - - - - x x x - 35 Household appliances
Mess rooms
Facilities - - - - x x x - 33 General purpose machinery
Heating system
Filtration System x x x x x x x - 33 General purpose machinery
Ventilation System x x x x x x x - 33 General purpose machinery
Airconditioning System x x x x x x x - 35 Household appliances
Ignition Appliance x x x x x x x - 334 Total Manufacturing
Communications System x x x x x x x - 44 Radio, television and communication apparatus
63
APPENDIX B: Programme Comparison
The following table outlines the key differences in the two programmes.
Dynamic NIPP CSDP
• Financial and credit based • OEMs are contracted by
Supplier Obligation
• 30% of the import value of a participating SOEs.
• SOEs use the tender process to
deal
• Develop an agreed plan optimally localise its supply
chain.
together with DTI and
• Contracts include actions which
implement within seven years
OEMs need to take to improve
selected industry sector National
Value Add (NVA)
.
• Manufacturing / repair of parts
Industry Focus The Industrial Sector Plan
focuses on the following sectors: and assemblies used in capital
• Agriculture equipment
• Cultural industries (crafts) • Maintenance skills and
• Export sectors (Clothing and specialised testing
• Diagnostic skills
Textiles; chemicals)
• Tourism
• Knowledge Intensive Industries
(ICTs )
Primarily – knowledge-intensive,
value-adding growth with equity10
Transnet’s Infrastructure Supplier investment in unrelated Focused on the localisation of the
industries, as overseen by DTI SOEs’ supply base by agreement,
i.e.
- short term – assembly;
- long term – OEM part
manufacture /
maintenance
-
Management DTI and the OEM Supplier Transnet & the OEM Supplier
11
at 2006
10
The DTI, Accelerating Growth and Development; The Contribution of an Integrated Manufacturing Strategy; 2002
11
Note: The development of the CSDP programme and this SDP began before the introduction of the DTI’s “NIPP Direct”
programme. As such no comparison was made to this programme.
64
Supplier Development Plan
APPENDIX C: Transnet (AS IS – TO BE)
The largest challenge Transnet as an organisation faces in implementing effective Supplier
Development initiatives, is the lack of capability and capacity of SM staff, and the lack of trust this
fosters among Transnet senior management.
This means that over and above developing this Plan and the procedures and governance needed
to implement CSDP opportunities, the upliftment of SM staff’s skills will remain a primary focus.
AS IS TO BE
Fragmented Supply Chain:
Our current operations are predominately We have created a Supply Management critical
fragmented and business unit oriented. There is path approach that addresses the steps
no over arching approach to the delivery of the required to achieve an integrated supply chain.
supply chain function and there is duplication Each step on the critical path is defined, the
across every activity and geography. changes required have been identified and the
delivery is prioritised.
This will enable us to have better visibility of our
consolidated spend, supply base, potential
development opportunities and our
performance.
Better visibility of all spend across the
organisation is the key to supplier participation
and the development of CSDP deals.
Level of Supplier Management Skills
The majority of our staff have minimal formal Numerous interventions have been initiated to
skills in this area and have had limited ability to assist in educating our staff:
apply the skills that they have acquired.
• Yearly workshops: the majority of staff is
gathered to review current status, strategy,
trends and to discuss issues
• Bootcamps: intensive interventions focused
around topics that are relevant to targeted
staff
• eLearning: on line professional development
training program
• Specialised interventions: delivery of
specialized training programs (the first will be
supplier development) aimed at immediate
but professional staff skills upliftment.
The staff will eventually be benchmarked and
assessed against global and South African
standards.
65
Supplier Development Plan
AS IS TO BE
Lack of understanding of regulations –
inconsistent application We have started a process of DPP training
While the processes are governed by extensive across the country. However, we have not
policy (Detailed Procurement Policy – DPP), it is followed up with enforcement. We will continue
not consistently applied. Often, when it is to ensure the business is informed of any
applied it is taken far too literally to be effective. changes and proper / expected performance.
The next version of the DPP is due to be
released this calendar year.
In addition, we will continually monitor
performance against the Control Framework.
Lack of market research
As a function we spend far less than 1% of our Upliftment of skills and re-structuring will enable
time analyzing the market. us to improve this capability. In the short term,
we will ensure that we use appropriate external
skills to assist us in this process.
Little power or understanding of how to
interpret and use power See above
The tender process has steered us to conceding
to supplier recommendations and the market
Only through market analysis capability and
perception of best price rather than targeted
capacity will we be able to mitigate this concern.
price, quality and service (TCO).
Focus on doing it right rather than doing
the right thing Skills upliftment and proper processes will
assist us in changing this mentality.
We are often more concerned with adherence to
the rules rather than ensuring that the best
supplier is chosen and the best possible deal is Professional procurement practitioners will
reached. Compliance often is the excuse for focus on total cost of ownership and making the
lack of change, focus on the transaction and “best deal”.
ignorance of the market.
Risk averse
We are so risk averse that in almost every deal Training will change the focus of staff from risk
that we make we will take every effort to accept adverse to risk aware. This means, the most
the risk rather than mitigate it appropriately. appropriate mitigation action will be employed at
all times while creating a deal.
Transaction focused
We often measure ourselves on the number of Training for key personnel, will enable them to
transactions completed rather than the focus on longer term objectives rather than
accumulated value generated. “buying”.
66
Supplier Development Plan
AS IS TO BE
Poor Time Management
Our approval process and planning processes Transnet must continue to focus on
are inefficient. This means that we often take simplification and standardization of its
too long for some portions of the process and processes. This will include determining the
are often under severe time constraints to appropriate cycle times and minimum deliver
deliver a solution. This means we often are not standards across the Supply Chain.
taking the appropriate measures to secure the
best deal.
It will also involve cross-functional workshops to
understand the changes needed in the approval
process (implementing the OGC gateway) and
planning (maintenance / operations
improvements).
Adversarial Relationships
Transnet often views all suppliers as hostile and Skills upliftment is required to improve our
“out to rip us off”. This leads buyers to: relationship with our suppliers.
• Take a stance of false “power” asking for
unreasonable concessions during the Transnet must learn more about the supplier
tender process (enforced by one sided market, to form better, less adversarial
penalty clauses) and then not following relationships.
through
• Demand price and delivery cuts without
understanding the market
• Playing two or more suppliers against one
another to try to drive down costs
(rotating awards, etc.)
Often, the suppliers do know more about our
operations and will take advantage of our lack of
knowledge, fragmented supply chain and
capability limitations to secure better deals for
themselves.
Apathy
Many of our staff have spent years in trying to Transnet needs to invest time and effort in
make changes and improvements in their jobs improving the morale of its staff. We have
and in the way that Transnet conducts business made plans to achieve this through our various
to no avail. Over time, they have resigned interventions and improvement programmes.
themselves to “the way it is” and they place little
effort in doing more that the minimum required.
When we address these issues, Transnet will be enabled to address supplier issues.
67
Supplier Development Plan
Supplier (AS IS – TO BE)
The following table illustrates the changes that we must spearhead in our supplier base:
AS IS TO BE
Sole Source Suppliers:
A large portion of our supply base has been the Transnet must focus on developing an effective
12
sole supply of our capex and opex source of supply (optimal total cost of
requirements. This has been through: ownership) by:
• Historical purchase leads to further • Involving multiple suppliers, through market
purchases interventions, to ensure that we have an
appropriate mix of supply;
• Lack of alternate supply
• Focusing on resolving service issues or
• Single, local source of supply (usually building a reciprocal relationship with those
through agencies) suppliers who have no competition in the
market;
• Gold Plating (artificially making our
requirements specific to a single supplier) • Searching for alternate non-traditional
sources if possible (reverse engineering
• Internal stakeholder personal preferences
possibilities; new industry solutions, etc),
As well, brand orientation precludes us from especially if the supplier is non-responsive or
standardization and substitution activities. considers us a nuisance.
• Improve our internal capability to deliver
globally competitive goods and services (Rail
Engineering)
• Minimizing the negative affect of
unnecessary internal testing cycles for new
items.
SMMEs only 35% of GDP:
Currently, the government has not reached any CSDP will not address this issue (enterprise
of the targets for SMME (US contribution is over development).
70% of GDP).
• We must ensure that we segment our spend
based on development opportunities
appropriately and to insist that those
suppliers entering into a CSDP arrangement
with Transnet enter into appropriate tier2 and
3 relationships to rectify this issue.
12
Operational Expenditure: this is external purchases for goods and services on a day to day basis
68
Supplier Development Plan
AS IS TO BE
Lack of global competitiveness in the OEM
space:
Our approach is to negotiate localisation based
A large portion of our equipment is provided by on CSR principles and the OEM’s balance
suppliers in limited competitive spaces. sheet objectives (which is one of our last
“resorts). First, tenders will be evaluated on
proposed localisation solutions and then
contractual agreements will be reached to
achieve these objectives.
We need to build an arena for trust and mutual
respect (which is not the case currently)
Foreign dependency / hostage – victim
mentality:
While our capex expenditure is large, the
Transnet needs to focus on relationship
foreign import portion that would be applicable
development and management with large
to CSDP is confined predominately to capital
OEM’s. The more professional the relationship,
equipment and specialised service support. Of
the more opportunity for reasoned dialogue and
these tenders, most suppliers will be confined
dispute resolution.
due to standardisation requirements, current
long term contracts in place or lack of time to Improved demand management will improve our
investigate alternate sources of supply. lead times. We need to align our demand with
the suppliers’ mechanisms for fulfillment.
Our current foreign suppliers are not interested
in our purchase volume for spare parts and
therefore supply on a sporadic basis (based on
other priority customer demand, their cost, time,
and cost of distribution). Our demand is
inconsistent and fragmented which means we
often send low value, large volume orders. This
leads the supplier to “park” demand until a
sufficient volume is accumulated for shipment.
69
Supplier Development Plan
AS IS TO BE
Not deal oriented
The tender process creates an attitude of “I win We must adopt a commitment to change that
if I am best price” regardless of the market allows our personnel to adopt the appropriate
price. skills and developing effective deals without
losing focus on the basic fundamentals of public
In addition, the tender process, by nature, procurement.
requires that more than 80% of the solution is
defined by Transnet – whether we know the
current market or not. This “crowds out supplier
Our staff will be updated with the Right Attitude /
innovation”.
Commitment, then it will be expected of the
suppliers. This will be comprised of:
• Mutual respect and benefit
Because we follow a “three quote process” we
don’t often research what is best overall.
• Mutual Support during good and bad times
• Minimum “red tape” and reduction in difficulty
Once we enter into a deal – it’s over. We leave to deliver
no mechanisms in place to manage or rectify
• Benchmarking will set the standard for
issues.
current purchase standards / supplier
capability and future improvement
With strategic purchases, we will have a
Continuous Improvement focus, where we will
look to solve demand and supply side issues.
Not used to strategic sourcing and Our staff are currently being trained on the
negotiation: Transnet strategic sourcing methodology (D-
cubed), and more intensive training will occur.
All of our key buyers, will be able to conduct
sourcing events.
We will need to educate the suppliers on the
strategic sourcing process and how the
suppliers that do not get the award can use the
process as an improvement mechanism rather
than a motivation to sue.
70
Supplier Development Plan
AS IS TO BE
One sided deals
Often, Transnet will unenthusiastically (believe All of the interventions that we have identified
that there is a better deal but take no action to so far will help to reduce this tendency, but
determine what it is) enter into a deal. This is other requirements such as:
often due to:
• Learning to build relationships based on
• sincerity and honesty
Literal adherence to the rules of three
quotes, best price tendering
• Making more buyers accountable for the
• Lack of market awareness quality and the nature of the deals
• •
Learned behavior Encouraging the introduction of innovation
and new technology within Transnet with a
• Lack of understanding of the power base focus on TCO reduction and enhanced fit
(their own in relationship to the deal and for purpose goods and services
in relationship to Transnet Management,
•
the supplier’s, the impact of the deal on Encouraging open book pricing with our
the supplier’s bottom-line, etc). strategic partners
• •
Lack of Proper training Rewarding suppliers (where possible) with
the appropriate attitude of cooperation and
• Lack of time (poor planning) collaboration.
Often, the supplier will “bully” the buyer into the
deal through use of intimidation, superior
expertise and knowledge, product availability,
and other tactics.
71
Supplier Development Plan
APPENDIX D: NIPP Obligations
Transnet related IP Obligations
Transnet Suppliers
DTI discharge
with NIPP Spend Commodity Value of NIPP Obligation
date
obligations
1 Jan de Nul Dredging 2012 € 9.4800 m R 94.80 m
not signed yet
2 Kalmar 158 Straddle carriers € 27.2500 m R 272.50 m
3 Liebherr 14 Cranes 2013 € 24.7600 m R 247.60 m
4 Mitsui (MARS) 110 Locos 2013 $50.4300 m R 353.01 m
Venus (Mitsui
5 subsidiary) 32 Locos 2014 $27.7400 m R 194.18 m
Berth 306 construction @
6 Van Oord Richards Bay 2013 $3.9850 m R 27.90 m
discharged
7 Alstom SA 9E Locos R 25.3800 m
TOTAL NIPP OBLIGATIONS OF 7 TRANSNET DEALS: R 1,215.37 m
TRANSNET SUPPLIERS' UNDISCHARGED NIPP OBLIGATIONS R 1,189.99 m
1.1 Jan de Nul
Jan De Nul (Belgium) was awarded a contract (Contract No. NPA 395) for the
“Dredging Works for the proposed Port of Ngqura” by the National Ports Authority.
The obligation value is €9,48 million. The company has until 2012 to discharge
this obligation.
1.2 Kalmar
Kalmar Industries Oy Ab (Finland) was awarded a contract for the supply of 158
(one hundred and fifty eight) straddle carriers as per contract number HQH232C,
from 2001 to 2006 by the South African Port Operations (SAPO). The obligation
value is €27,25 million. There has been no positive co-operation from Kalmar
regarding how this obligation will be discharged and no agreement has been
signed yet.
1.3 Liebherr Container Cranes
Liebherr (Ireland) was awarded contract for the supply of 14 (fourteen) ship-to-
shore container cranes in terms of the Tender Reference Number HQH 23/05, by
South African Port Operations (SAPO). The obligation value is €24,76 million. The
company has until 2013 to fulfill this obligation.
72
Supplier Development Plan
1.4 Mitsui African Railway Solutions (MARS)
MARS (South Africa), a subsidiary of Mitsui of Japan was awarded a contract by
Spoornet for the development and supplying of 110 locomotives in terms of the
Main Line Locomotives Investment Programme (MLLIP) tender number
102072105. The obligation value is US$50,43 million and this obligation is
supposed to be discharged by 2013.
1.5 Venus Railway Solutions
Venus (South Africa), a subsidiary of Mitsui of Japan was awarded a contract by
Spoornet for the development and supplying of 32 locomotives in terms of the
Main Line Locomotives Investment Programme (MLLIP) tender number
102072105. The obligation value is US$27,73 million and this obligation is
supposed to be discharged by 2014.
1.6 Van Oord
Van Oord (The Netherlands) was awarded a contract by National Port Authority for
the construction of berth 306 at the Port of Richards Bay in terms of the contract
RCB/ENG 00038/3/RBCT 306. The obligation value is US$3,985 million and it is
supposed to be discharged by 2013.
1.7 Alstom SA (South Africa)
Alstom was awarded a contract by Spoornet for the design and construction of the
Spoornet’s 9 E locomotive in terms of contract number 200068/S00AT7. The
obligation value amounting to ZAR25,38 million has already been discharged.
73
Supplier Development Plan
APPENDIX E : Guiding Principles followed developing
Transnet’s CSDP Approach
Design Requirement Deliverable
• Stability: Transnet will make every effort to ensure that
Flexible approach
they provide the market with a coherent view of our
spend and our key focus areas
• Solution oriented: As Transnet changes and matures,
they will go to market more often looking for solutions
from suppliers to work more closely in developing
relationships and the market, not just making purchases
• Relationship: any CSDP opportunity will be contractual
and will focus on remedies and continuous
improvement.
• Total cost of ownership model: all CSDP opportunities
must focus on all impacts to costs: purchase costs,
internal costs and life cycle costs. Any CSDP deal will
measure how the deal will improve Transnet’s bottom
line and the impact to the economy.
•
Case by case evaluation Manage the plan: While Transnet will have, as part of
the process to develop and maintain a development
plan, pre-determined some of the of potential
opportunities, each subsequent proposal must be
reviewed on first it’s own merit and then on how it fits
into the overall plan.
• Value for effort will drive the decision as to whether to
pursue a CSDP opportunity. Not all opportunities will
generate NVA directly. Some deals will actually
improve quality, reduce cycle times, improve the
relationship with foreign OEM suppliers or improve our
skill base.
• Contact: Transnet will determine and communicate the
method in which suppliers can approach us with
unsolicited bids.
74
Supplier Development Plan
Design Requirement Deliverable
• The Plan: the plan is a “living document” which is
Procedures and policies
constantly validated, updated and changed when
required.
• Prioritisation of needs and spend will occur on a yearly
basis to ensure that we have sufficient resources to
implement.
• Processes: must at a minimum provide the necessary
guidelines for identification, evaluation, approval and
measuring CSDP opportunities.
• The Detailed Procurement Procedure (DPP) must be
updated with the relevant policies to ensure good
governance and ensure compliance to the PFMA and
other legislation.
• Templates: templates will be developed and distributed
to Supplier Development Managers to assist in the
creation of - opportunity identification, business case,
measurement reports; contracts. This will ensure
consistency and ability to compare the merits of each
deal.
•
Deliver in an effective, Implementable: each deal must be measurable, add to
sustainable manner the economy and provide Transnet with added value
• Over sight: once a deal has been agreed and
contracted, a resource must be available to review the
progress to the implementation plan.
• KPI’s / measurable: Each deal must be supported by
robust measures and supplier / market benchmarks.
This will ensure successful impact to Transnet and the
market. Benchmarking will ensure that the supplier is
involved in improvement processes as well.
• Long-term commitment: to be effective, the deal must
be longer than the original purchase contract. This is to
ensure that there is an adequate exchange of
Intellectual Property (IP), skills and / or expertise.
• Commitment to change: throughout the deal, change
must be encouraged for both the supplier and Transnet.
Where Transnet is impeding the deal, actions need to
be taken to rectify the situation.
75
Supplier Development Plan
Design Requirement Deliverable
•
Supplier code of ethics Develop a Code: Transnet, in conjunction with other
key stakeholders, will attempt to create a Code of
Ethics that will help to manage relationships and
provide a path for change.
•
Stakeholder Management Involvement: Transnet will ensure that all stakeholders
are informed and consulted on a regular basis. We
anticipate the following interventions:
- Ongoing discussions with industry associations
through contact with Managing directors and public
forums as required;
- Bi-monthly discussions with the relevant contacts at
the DTI regarding industry sector plans;
- Regular meetings with DTI regarding NIPP
obligations (as per supplier requirement); and
- Meetings on Plans, opportunities and supplier
benchmarking as planned by the DPE.
• Industry Information: Transnet will participate in any
government initiative such Power clusters / component
hubs, etc. that focus on improving the performance of
an industry sector or sub-sector.
76
Supplier Development Plan
APPENDIX F: Steps in Transnet’s CSDP Approach
1) Align spend - identify the opportunities
2) Conduct the sourcing event
3) Categorise and record the opportunity
4) Approve the opportunity in principle
5) Negotiate with the supplier
6) Develop the business case and obtain approval
7) Create and finalise the contract
8) Measure the supplier
The following is a high level overview of the approach:
1) Align spend - identify the opportunities
Once our spend has been analysed for the upcoming year, we would determine if there are
any CSDP (and other development opportunities), based on their potential value. We have
identified four major types of opportunities (as shown below) that Transnet will focus on in
its strategy. On the basis of the value of our spend commitment, one of the four types
apply:
• Local Expansion;
• Increased Export Capacity;
• OEM Manufacturing; and
• Optimising NIPP Obligations.
For further details, refer to the next section (Determine the Opportunities).
2) Conduct the sourcing event
From a governance and control perspective, we have determined that it will be more
appropriate to focus on opportunities that arise through the tender process:
• The process satisfies all of our regulatory and social obligations as a public entity.
It ensures that we provide a consistent mechanism for evaluation and award. As
such, we will reduce our exposure to litigation and claims of preferential treatment;
• This is the point at which Transnet can exert the most influence in the relationship
and can help to ensure that an optimal deal will be reached;
• At this point, we can effectively reach more potential suppliers who may provide
more suitable solutions than traditional suppliers;
77
Supplier Development Plan
Transnet will entertain unsolicited opportunities or joint development initiatives with current
suppliers under the following conditions:
• If the opportunity will generate substantial benefits with minimum effort;
• The deal is unique and cannot easily be provided by the supplier’s competitors;
• If the supplier is a long-term or sole supplier and the deal will provide mutual
benefit; or
• If a supplier began with a Transnet Enterprise development initiative and is now in
the position to expand globally.
A committee of supplier development managers and other senior management will
adjudicate any other type of initiative.
3) Categorise and record the opportunity
Once the tenders have been evaluated or the initiative has been approved in principle, the
opportunity will be categorised and loaded into the opportunity template. This template will
provide the:
• Background of the deal;
• The details of the relationship and investment to be made;
• The expected benefits (both financial and secondary);
• The TCO model for the commodity;
• The risks that need to be mitigated;
• The National Value Add (NVA) and other measures; and
• The signed Memorandum of Understanding (MOU).
4) Approve the opportunity in principle
Once the details of the opportunity have been captured and initial discussions have
occurred with the supplier, the opportunity will be reviewed by the supplier development
managers and the CPO forum to provide guidance and approval.
If required, the opportunity will also be reviewed by the Acquisition Council to agree award,
if the CSDP proposal was a determining factor in the award (i.e. technical capabilities,
price and BBBEE status were all relatively equal and the supplier was awarded the tender
based on their proposal).
78
Supplier Development Plan
5) Negotiate with the supplier
Once approval has been obtained, negotiations (over and above the contract) will begin
with the preferred bidder(s), as approved by the Acquisition Council. These negotiations
entail developing:
• The details of the relationship;
• The services / parts to be supplied;
• The investment agreement;
• The future pricing / delivery agreement; and
• Terms and conditions
6) Develop the business case and obtain approval
Once the main details of the deal have been agreed, the business case is created and
approval is sought by the appropriate governance body (Transnet is currently looking at the
feasibility of using the Investment Committee). The business case is a Transnet standard
that is currently used for all capex purchases. The business case is not so much
concerned with Return on Investment (ROI) but rather on the overall TCO Model for
Transnet.
Once a business case is developed, it is circulated to the appropriate business unit
Supplier Development Managers and CPOs for final comments. It is then sent for
approval.
Currently, the primary policy is that Transnet, in principle, will not enter into an equity
arrangement with a supplier. However, it may be a requirement that any monies invested
will have to generate a return equal to the current Transnet hurdle rate.13 Most deals will
not involve the exchange of money either in Transnet holding funds or investing funds on
the suppliers’ behalf or Transnet providing funds to the supplier.
Value will be placed on all aspects of the transaction, including but not limited to:
intellectual property, skills transfer, off shore training, expansion, enterprise development,
reduction of price, reduction of lead time, etc.
7) Create and finalise the contract
Once the business case is approved, Transnet will enter into a contractual agreement with
the supplier. Most deals should have an life span greater than the initial purchase contract
for it to be a truly effective CSDP opportunity.
13
Currently set at approximately 8.5% to 9%
79
Supplier Development Plan
8) Measure the supplier
The contract will include all of the processes and procedures for relationship management.
It will include:
• The mechanism for measurement and the anticipated KPIs;
• The frequency of the measurement;
• The parties involved;
• The required continuous improvement activities; and
• The benchmark activities that will be entered into, the parties involved, and the
frequency.
80
Supplier Development Plan
APPENDIX G: National Competitiveness Balance Sheet: South Africa
Global Competitiveness Index: South Africa: Country/Economy Analysis
Rank Score
(Out of 131 countries/economies) (Out of 7)
4.42
Global Competitiveness Index 2007-2008 44
Global Competitiveness Index 2006-2007 (out of 122) 36 4.54
Subindex A: Basic requirements 61 4.45
1st pillar: Institutions 39 4.55
2nd pillar: Infrastructure 43 4.22
3rd pillar: Macroeconomic stability 50 5.08
4th pillar: Health and primary education 117 3.96
Subindex B: Efficiency enhancers 36 4.44
5th pillar: Higher education and training 56 4.12
6th pillar: Goods market efficiency 32 4.73
7th pillar: Labor market efficiency 78 4.16
8th pillar: Financial market sophistication 25 5.19
9th pillar: Technological readiness 46 3.57
10th pillar: Market size 21 4.89
Subindex C: Innovation and sophistication factors 33 4.16
11th pillar: Business sophistication 36 4.61
12th pillar: Innovation 32 3.71
81
National competitiveness balance sheet: SOUTH AFRICA
NOTABLE COMPETITIVE ADVANTAGES Rank/131 NOTABLE COMPETITIVE DISADVANTAGES Rank/131
1st pillar: Institutions
1st pillar: Institutions
01.12 Business costs of crime and violence 126
01.17 Efficacy of corporate boards 4
01.13 Organized crime 112
01.16 Strength of auditing and reporting standards 6
01.14 Reliability of police services 104
01.18 Protection of minority shareholders’ interests 13
01.08 Burden of government regulation 101
01.09 Efficiency of legal framework 17
01.06 Favoritism in decisions of government officials 53
01.01 Property rights 22
01.03 Diversion of public funds 49
01.05 Judicial independence 23
01.04 Public trust of politicians 48
01.02 Intellectual property protection 24
01.07 Wastefulness of government spending 27
01.10 Transparency of government policymaking 30
01.15 Ethical behavior of firms 39
01.11 Business costs of terrorism 43
2nd pillar: Infrastructure
2nd pillar: Infrastructure
02.08 Telephone lines (hard data) 87
02.06 Available seat kilometers (hard data) 21 02.07 Quality of electricity supply 83
02.05 Quality of air transport infrastructure 22 02.04 Quality of port infrastructure 48
02.02 Quality of roads 38
02.03 Quality of railroad infrastructure 41
02.01 Quality of overall infrastructure 43
3rd pillar: Macroeconomic stability
03.02 National savings rate (hard data) 103
3rd pillar: Macroeconomic stability
03.03 Inflation (hard data) 70
03.05 Government debt (hard data) 49
03.04 Interest rate spread (hard data) 43
03.01 Government surplus/deficit (hard data) 48
82
Supplier Development Plan
4th pillar: Health and primary education
4th pillar: Health and primary education
04.11 Education expenditure (hard data) 32 04.05 Business impact of HIV/AIDS 129
04.06 HIV prevalence (hard data) 126
04.04 Tuberculosis incidence (hard data) 125
04.03 Business impact of tuberculosis 124
04.08 Life expectancy (hard data) 120
04.01 Business impact of malaria 109
04.07 Infant mortality (hard data) 99
04.09 Quality of primary education 99
04.10 Primary enrollment (hard data) 93
04.02 Malaria incidence (hard data) 86
5th pillar: Higher education and training
05.08 Extent of staff training 21 5th pillar: Higher education and training
05.05 Quality of management schools 22 05.04 Quality of math and science education 128
05.07 Local availability of specialized research and training 33 05.03 Quality of the educational system 104
services
05.02 Tertiary enrollment (hard data) 90
05.06 Internet access in schools 86
05.01 Secondary enrollment (hard data) 51
6th pillar: Goods market efficiency
06.08 Agricultural policy costs 14
06.03 Effectiveness of anti-monopoly policy 18
6th pillar: Goods market efficiency
06.04 Extent and effect of taxation 26
06.12 Business impact of rules on FDI 79
06.15 Buyer sophistication 33
06.07 Time required to start a business (hard data) 70
06.02 Extent of market dominance 36
06.13 Burden of customs procedures 68
06.09 Prevalence of trade barriers 38
06.10 Trade-weighted tariff rate (hard data) 65
06.05 Total tax rate (hard data) 39
06.14 Degree of customer orientation 64
83
Supplier Development Plan
06.11 Prevalence of foreign ownership 56
06.06 Number of procedures required to start a business 52
(hard data)
7th pillar: Labor market efficiency 06.01 Intensity of local competition 52
07.03 Non-wage labor costs (hard data) 11
07.08 Reliance on professional management 15
7th pillar: Labor market efficiency
07.06 Firing costs (hard data) 38
07.05 Hiring and firing practices 129
07.02 Flexibility of wage determination 121
07.01 Cooperation in labor-employer relations 120
07.10 Female participation in labor force (hard data) 102
07.07 Pay and productivity 92
07.04 Rigidity of employment (hard data) 70
07.09 Brain drain 69
8th pillar: Financial market sophistication
08.02 Financing through local equity market 4
08.08 Regulation of securities exchanges 5
08.06 Strength of investor protection (hard data) 9
8th pillar: Financial market sophistication
08.01 Financial market sophistication 15
08.07 Soundness of banks 16
08.04 Venture capital availability 41
08.05 Restriction on capital flows 111
08.09 Legal rights index (hard data) 47
08.03 Ease of access to loans 44
9th pillar: Technological readiness
09.04 FDI and technology transfer 24
09.02 Firm-level technology absorption 30
09.03 Laws relating to ICT 32
9th pillar: Technological readiness
09.01 Availability of latest technologies 40
09.08 Broadband Internet subscribers (hard data) 74
84
Supplier Development Plan
09.06 Internet users (hard data) 73
10th pillar: Market size 09.07 Personal computers (hard data) 62
09.05 Mobile telephone subscribers (hard data) 47
10.01 Domestic market size index (hard data) 19
10.02 Foreign market size index (hard data) 28
11th pillar: Business sophistication
11.08 Extent of marketing 17
11.01 Local supplier quantity 26
11.02 Local supplier quality 29
11th pillar: Business sophistication
11.09 Willingness to delegate authority 30
11.06 Control of international distribution 32
11.05 Value chain breadth 79
11.04 Nature of competitive advantage 70
12th pillar: Innovation
11.07 Production process sophistication 47
11.03 State of cluster development 45
12.04 University-industry research collaboration 24
12.03 Company spending on R&D 26
12.02 Quality of scientific research institutions 27
12.07 Utility patents (hard data) 39 12th pillar: Innovation
12.01 Capacity for innovation 43
12.06 Availability of scientists and engineers 104
12.05 Government procurement of advanced technology 52
products
85
Supplier Development Plan
APPENDIX H: The Competitiveness Roadmap 2007 to 2050
86
APPENDIX I: Frequently Asked Questions
The following, is a list of questions and comments forwarded to Transnet from our key stakeholders.
Transnet responses are herewith included.
Engaging First Tier Suppliers
Comment 1 - Local OEMs will not be considered: Transnet will be upgrading and increasing its
locomotive and port handling equipment over the next 5 – 10 years. These categories of capital
equipment are only available from established Original Equipment Manufacturers (OEMs). Transnet will
utilise a combination of open tenders and confined purchases to engage the market.
Any South African OEM has the right to participate in an open tender and is evaluated in the same way
as all of the other respondents. As previously stated at the forum, all evaluation is based on the Total
Cost of Ownership which means that advantages like a local supply chain, BBBEE status, reduced
freight costs, etc are considered.
Comment 2 – Negotiation time is too late to involve 2nd and 3rd Tier Suppliers: Transnet’s approach is to
localise the supply chain, not to determine the local partners that the OEMs may choose. The alignment
of the OEM and local suppliers is determined after the contract is signed and will be based on several
factors such as
benchmarking, Restricted Lists, etc.
Identifying, Benchmarking and Engaging Second and Third Tier Suppliers
Comment 3 – Engaging 2nd and 3rd tier suppliers: Once OEM suppliers are awarded the business, they
will have a time limit to enter into an agreement on how they will meet their CSDP obligations. This will
include discussing the mechanism by which they will engage the market and also to provide advice on
the market capabilities.
Comment 4 – How can 2nd and 3rd Tier Suppliers respond without sufficient notice: Since Transnet does
not always know which supplier will be awarded the business, it will be impossible to notify the market of
the contact people or the extent to which the deal will be localised or what will be the agreed
deliverables.
Comment 5 – There should be a database of suppliers: The intended supplier benchmarking
programme will assist in developing the database and the continuous improvement plans for suppliers.
The DPE will determine the management of the process long-term and the costing model.
Comment 6 – Communication: A comprehensive communication programme needs to be developed to
ensure that the local supply base (especially outside of the current participating industries and
stakeholders) is informed of the CSDP and know the steps required to participate. Currently, Transnet
is insuring that all tenders include reference to the programme and that key stakeholders are being
informed of the programme. A full blown approach will be developed once the SDP has been accepted
by the DPE.
Comment 7 – Need to understand capacity and capability: The ability to set up regular communication
with industry associations is a very valuable off-shoot of the CSDP. Transnet intends to engage with the
associations to update market intelligence and to ensure that local suppliers are engaged and that we
are aware of the capacity and capability of the market.
Comment 8 – Signaling: Transnet will make every endeavor to inform the market of upcoming
expenditure, however, the information will be as accurate as is possible without compromising our
tender process (providing sensitive information that will impact the price).
87
Supplier Development Plan
Price Premiums
Comment 9 – Not acceptable to not pay premiums to local or BBBEE suppliers: Transnet is of the
opinion that if a supplier requires the payment of a premium, then they are not competitive and may not
be able to provide the service / goods required. However, this does not in anyway preclude us from
understanding that in the right circumstance that both the supplier and Transnet may benefit from
enterprise development. In addition to the CSDP, we will be developing our overall Supplier
Management Framework which will assist us in determining our developmental focus.
Type of Initiatives
Comment 10 – There must be a focus on skills transfer as well: Transnet has indicated through the
diagram below, that there are numerous opportunities with a supplier, including skills transfer. In fact, in
our current national situation, skills transfer is essential. Whether that will lead to exporting the skills is
not a focus for Transnet in the short to medium term.
88
Supplier Development Plan
Transnet Procurement Policies
Comment 11 – Targets for localisation must be established: Transnet has not identified pre-establish
targets as this may diminish the suppliers’ innovative responses. Rather, Transnet will set effective
evaluation criteria and rigid process controls.
Comment 12 – Transnet procurement rules make engagement and communication difficult: Transnet is
above all a public entity and while not bound by National Treasury rules, we must be cognisant of the
constitutional imperative that guides our policy decisions. Or process must be fair, open, transparent,
add value for money, and competitive. We therefore have fairly restrictive supplier relationship rules but
must ensure that we are able to adapt to the market and changes in supply.
Comment 13 – Capacity and Capability Building: Transnet realises that to achieve the expectations of
the CSDP, our staff must have the ability to deliver. We have engaged in very aggressive programmes
to uplift our skill set and capacity of our staff.
Comment 14 – Communication with Suppliers: Our policy prohibits communication with suppliers prior
to the release of a tender. This is to ensure transparent and fair relationships. This also poses a
problem when it comes to gathering sufficient data about what the market has to offer. Transnet will be
taking steps to ensure that we get the optimum information from the market prior to purchases.
Intergovernmental Support
Comment 15 – The Government agencies must come to the table to support the programme: There are
many interventions and coordination programmes required by government to make this programme and
its intended results come to fruition. There must be a coordinated effort to bring together the
competencies and reach of each agency to ensure success. This will be a dialogue that needs to be led
by the DPE.
Conclusion
For the CSDP to be successful, communication and governmental support will be pivotal. Transnet is
absolutely intent on participating with the DPE, DTI, and others to ensure that the correct interventions
are used to engage the right suppliers to generate the most effective results.