• Save

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this presentation? Why not share!

New Simulation Systems installed by Transnet

on

  • 2,173 views

Presented by: Jacques Moncorge at the 2009 Railways and Harbours Conference in Cape Town.

Presented by: Jacques Moncorge at the 2009 Railways and Harbours Conference in Cape Town.

Statistics

Views

Total Views
2,173
Views on SlideShare
2,164
Embed Views
9

Actions

Likes
2
Downloads
0
Comments
0

2 Embeds 9

http://www.railwaysandharbours.com 7
http://www.slideshare.net 2

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    New Simulation Systems installed by Transnet New Simulation Systems installed by Transnet Presentation Transcript

    • New Simulation Sytems installed by TRANSNET – March 6th 2009 Jacques Moncorgé Regional Manager
    • Agenda
      • CORYS TESS Corporate Presentation
      • TRANSNET FREIGHT RAIL Simulators
      • Questions / Answers
    • CORYS TESS Main Figures Growth Net Profit 34 M€ > 10% / Year > 6% 2008 Revenue Shareholders
    • CORYS TESS Activity by Sector & Zones POWER TRANSPORTATION USA 19% FRANCE 37% ASIA & AUSTRALIA 14% EUROPE (Others) & AFRICA 30% Zones Sectors
      • World leader
        • Over 60 clients and 400 simulators
      • Customers
        • Rolling stock manufacturers
        • Operators
        • Training centres
      • Solutions
        • Driving simulators
        • CBT / WBT
      • Fields
        • Metro
        • Tram & LRV
        • Bus
        • Mainline & suburban
        • High speed
        • Freight
      • European leader
        • Over 40 clients and 150 simulators
      • Customers
        • Electrical Utilities
        • Training centres
        • System integrators
      • Solutions
        • Training simulators from basic principles to replica full scope
        • Engineering simulation platforms
        • Operator training
      • Fields
        • Conventional and nuclear electricity production
        • Public and industrial distribution grids
    • CORYS TESS Worldwide Presence & Recent Contracts Power & Engineering contracts Transportation contracts CORYS T.E.S.S offices
    • Transport References
      • Maintenance
        • Over 400 simulators managed worldwide
        • 20 person dedicated maintenance department with local partners for on-site operation
      • Renovation
        • Renovation due to obsolescence
        • Porting of existing code onto new hardware platforms
        • Full upgrade to latest workshops
        • Renovation of competitor systems
      Maintenance & Renovation
    • Research & Development
      • Permanent innovation strategy through continuous R&D investment
      ALICES workshop Integrated modeling & simulation environment for real time power plant and complex process simulation CORAIL workshop Integrated toolbox for train simulation development, including CGI Track Builder Tool.
      • R&D policy to develop and continually update standard internal workshops, specific to each type of product
    • Agenda
      • CORYS TESS Corporate Presentation
      • TRANSNET FREIGHT RAIL Simulators
      • Questions / Answers
    • Transnet Freight Rail Project Description (INGISA Project)
      • Delivery of 16 containerised simulators, a seat motion system per container
      • Upgrade of 3 existing full scope, one of which with a 6 DOF motion system
      • Early deliveries : 9 delivery dates from June 2008 to June 2009 (every 2 month)
      Container simulator Cab simulator
    • Common Multipurpose Desk for the 19 simulators
      • 8 types of locomotives : 1 diesel and 7 electrical
      • Multipurpose driver desk with interchangeable casing
      5 Master Controllers + 4 Brakes
    • Train Models
      • Types of locomotives : diesel, electrical (3kV DC, 25 kV, 50 kV)
      • Consists including up to 500 wagons and 38 locomotives
      • L/V modelling : ratio of lateral forces on each wheel to the vertical load holding it down to the rail
      • Liquid load behaviour
    • Computer Generated Images
        • 2700 km of lines simulated in computer generated images
        • Automatic generation using client data for tracks and GPS+SIG data for landscape
    • Old Static Simulators (2) Upgrade Simulators (2) UPGRADE Inside Cab Instructor Station
    • New Full Scope Simulator (1) FULL REPLACEMENT
    • New containerised simulators (16) Desk Instructor Station Container NEW Motion Seat
    • Instructor Station – Main Interface
    • TPD – Track Profile Display
    • On Board Interfaces
    • Human Machine Interfaces 34D Desk Emulator 34D Virtual Train Display 9E Desk Emulator 9E Driver Display Unit
    • Some CGI views
    • Some visual effects
    • Train derailment …
    • CGI Example
      • One CGI video to add (2/3 min)
    • Agenda
      • CORYS TESS Corporate Presentation
      • TRANSNET FREIGHT RAIL Simulators
      • Questions / Answers