Parnell Square
The Works <ul><ul><li>The works are split into 2 distinct phases </li></ul></ul><ul><ul><li>Enabling works </li></ul></ul>...
The Aim <ul><li>The aim for RPA is to design and construct the works without materially impacting on the existing business...
Keeping  the City Open for Business <ul><li>By maintaining pedestrian access to all premises </li></ul><ul><li>By maintain...
Keeping  the City an attractive destination <ul><li>Noise and dust limits strictly controlled and monitored </li></ul><ul>...
Enabling Works Summer 2011 to Spring 2012 Heritage Works, Tree Removal and Utility Diversions
Service Diversions
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Phase 7
Phase 8
Phase 9
Phase 10
Phase 11
Phase 12
Phase 13
Phase 14
Local Service Diversions <ul><li>Manholes  </li></ul><ul><li>Shallow trench excavations </li></ul><ul><li>Short durations ...
Local Service Diversions
Main Works & Phasing
Main Works Station Construction <ul><ul><li>Main works 48 months (excavation and concrete works) 2012 to 2016 </li></ul></...
Main Works Phase 1 (12months)
Main Works Phase 2 (30 months)
Pedestrian Access
Current Situation 10.5 m - 34ft 6 inches 4.0 m (14ft)
Phase  1 (12 months) 3.3 m -11ft 4.0 m (14ft)
Phase  2 (30 months) 3.3 m -11ft 4.0 m (14ft)
Current Situation 10.5 m - 34ft 6 inches
Phase1 (12 Months) 3.2 m – 10ft 8 inches  3.2 m  min  4.0 m (14ft)
Phase 2 (30 Months) 3.2 m – 10ft 8 inches  3.2 m  min  4.0 m (14ft)
Current Situation 10.5 m - 34ft 6 inches
Phase  2 (30 months) 3.3 m -11ft 4.0 m (14ft)
Traffic Management
Main Works Traffic Management 10 trucks entering and leaving the site per hour during the day Parnell Square East closed t...
Main Works Traffic Management
Main Works Traffic Management
How RPA honor's it’s Commitment <ul><li>RPA will  </li></ul><ul><li>Have an ongoing role throughout the works </li></ul><u...
Our Commitment to you <ul><li>A public information centre will be established </li></ul><ul><li>Communications HQ & media ...
Contractor’s Commitments <ul><li>The Contractor </li></ul><ul><li>Will  comply with Conditions of Contract the Railway  </...
Next Steps <ul><li>November 2010 – March 2011 </li></ul><ul><li>Meet with individual businesses etc  to discuss impacts an...
Upcoming SlideShare
Loading in …5
×

Metro North Parnell Square presentation held on 30th November 2010

1,040 views
992 views

Published on

In November 2010 RPA Metro North Roadshow hit Dublin City Centre. The Roadshow was made up of four presentations on Metro North in the city centre focusing on O’Connell St, Westmoreland St, St Stephen’s Green and Parnell Square. The presentations show how the city centre is going to look like during Metro North construction.

Published in: Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,040
On SlideShare
0
From Embeds
0
Number of Embeds
18
Actions
Shares
0
Downloads
14
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Orientation One Box Depth approximately 25m. Length 120 m width 40 m Size of boxes due to back of house equipment- signal rooms comms rooms ventilation escape stairs fire fighting lifts uninteruped power supply
  • Orientation 2 Boxes Depth approximately 25m Cover to the river 8m Size of boxes due to back of house equipment- signal rooms comms rooms ventilation escape stairs fire fighting lifts uniteruped power supply
  • Orientation 2 Boxes Depth approximately 25m Cover to the river 8m Size of boxes due to back of house equipment- signal rooms comms rooms ventilation escape stairs fire fighting lifts uniteruped power supply
  • Simply the enabling works are works carried out prior to the main contract and consist of diverting existing services out of the way of the main construction works as well as heritage works and tree removal And the main works are the construction of the stations themselves, but more of this later in the presentation.
  • There are examples of Metros where both Client and Contractors have got this wrong and lost site of the ultimate aim. Where the needs of the businesses have not been recognized and the works executed without careful planning and consultation. A quick trawl of the internet will bring up examples like Vancouver and Dusseldorf to name just 2. This has led to businesses suffering losses and even closing due to the construction works. There are also examples where this type of construction has been carried out , taking into account local business and delivering significant benefits to the area post construction. Metro North works at St Stephens Green compliment the future vision of the area from Dublin City Council to help create a more pedestrian friendly environment and to promote the area for businesses. We aim to construct metro north whilst such that all the businesses remain and will benefit from the enhance environment We want all of you to be here when the line opens and reap the benefit that Metro will bring as part of a world class transport system that will allow Dublin to develop over the next century.
  • Pedestrian access – life blood of many shops &amp; businesses and maintaining access with Good Quality Walkways that are well maintained is essential. Access for servicing and deliveries is absolutely key to businesses functioning – reminder that there is a new delivery survey in the information packs, update from 2007, it helps us to understand your business and aids us in the planning of the works so if I could ask all of to fill theses in when you have a chance and send them back in the pre paid envelope, thank you. Access to car parks Getting the message across – all the good work is undone if we do not get this message over and the perception is that Dublin is closed
  • Noise- no real explanation need here , we are in a very sensitive Urban environment and our work methods have to reflect this. Limits have been set as part of the planning condition and we have to stay within theses and aim to be better than them Hoarding - Cara will give a presentation following this one Lighting - so that a safe environment is created and customers will still pass by the shops fronts. House keeping – yes we have work to do during the construction but keeping the worksite tidy, removing excavated material as soon as possible once dug, keeping the plant serviced and clean To work in a city city center we have to set the highest possible standards if we wish to have a successful outcome.
  • Read the Slide Enabling works As mentioned earlier the EW works are the works that need to be carried out to facilitate the main works. Duration 8 months, works to start during the school holidays in the area near the school
  • Type of diversions
  • Connect drains from median Install ESB ducts Install Eircom ducts Divert Gas main
  • Install Luas Multi tubular ducting and chambers Drainage connections and manhole Water diversions Gas Diversion Eircom and ESB tie-ins
  • Footpath remains as is. Access to Garden of remembrance from Parnell square North Less busy with no bus stops these being relocated to Frederick Street North, Cavendish Row and Parnell Street. Agreement with Dublin Bus and An Garda Siochana Area well lit and safe
  • Note that although not fully obvious there ids the existing footpath beside of the buildings
  • Drop off for schools etc in Rutland Place Currently drop off in a bus lane or having to cross a road neither option is safe.
  • Drop off for schools etc in Rutland Place Currently drop off in a bus lane or having to cross a road neither option is safe.
  • Drop off for schools etc in Rutland Place Currently drop off in a bus lane or having to cross a road neither option is safe.
  • Metro North Parnell Square presentation held on 30th November 2010

    1. 1. Place title here Metro North
    2. 2. Metro North <ul><li>Estuary </li></ul><ul><li>Swords </li></ul><ul><li>Fosterstown </li></ul><ul><li>Airport </li></ul><ul><li>Dardistown </li></ul><ul><li>Northwood </li></ul><ul><li>Ballymun </li></ul><ul><li>DCU </li></ul><ul><li>Griffith Avenue </li></ul><ul><li>Drumcondra </li></ul><ul><li>Mater </li></ul><ul><li>Parnell Square </li></ul><ul><li>O’Connell Bridge </li></ul><ul><li>St Stephen’s Green </li></ul><ul><li>St Stephen’s Green to Estuary </li></ul><ul><li>16.5km total length </li></ul><ul><ul><li>11 km in tunnel (City centre to Ballymun and Airport) </li></ul></ul><ul><ul><li>5.5 km in retained cut, at-grade or elevated </li></ul></ul><ul><li>14 stops </li></ul><ul><ul><li>9 underground stops from St. Stephen’s Green to Ballymun and at Airport </li></ul></ul><ul><ul><li>5 surface stops </li></ul></ul><ul><li>Planning Permission Granted </li></ul><ul><ul><li>20 Conditions </li></ul></ul><ul><ul><li>Depot relocation permission early 2011 </li></ul></ul><ul><ul><li>Enabling Works can commence </li></ul></ul>
    3. 3. Parnell Square
    4. 4. Parnell Square
    5. 5. Parnell Square
    6. 6. Parnell Square
    7. 7. The Works <ul><ul><li>The works are split into 2 distinct phases </li></ul></ul><ul><ul><li>Enabling works </li></ul></ul><ul><ul><li>Main Works </li></ul></ul>
    8. 8. The Aim <ul><li>The aim for RPA is to design and construct the works without materially impacting on the existing businesses </li></ul><ul><ul><li>Keeping Dublin Open for Business </li></ul></ul><ul><ul><li>Ensuring that City centre remains an attractive destination for shoppers </li></ul></ul>
    9. 9. Keeping the City Open for Business <ul><li>By maintaining pedestrian access to all premises </li></ul><ul><li>By maintaining access for servicing and deliveries </li></ul><ul><li>By maintaining access to all existing car parks </li></ul><ul><li>Getting the message across to the Public </li></ul><ul><li>All of this is achieved through </li></ul><ul><li>Careful planning and execution of the works </li></ul>
    10. 10. Keeping the City an attractive destination <ul><li>Noise and dust limits strictly controlled and monitored </li></ul><ul><li>High quality, well maintained attractive hoarding </li></ul><ul><li>Good lighting and signage will be provided between the worksites and the shops </li></ul><ul><li>Good housekeeping, plant and equipment cleaned and fully serviced, worksites kept tidy and dust free </li></ul><ul><li>By RPA and its contractor working closely with you the business community throughout the construction period </li></ul>
    11. 11. Enabling Works Summer 2011 to Spring 2012 Heritage Works, Tree Removal and Utility Diversions
    12. 12. Service Diversions
    13. 13. Phase 1
    14. 14. Phase 2
    15. 15. Phase 3
    16. 16. Phase 4
    17. 17. Phase 5
    18. 18. Phase 6
    19. 19. Phase 7
    20. 20. Phase 8
    21. 21. Phase 9
    22. 22. Phase 10
    23. 23. Phase 11
    24. 24. Phase 12
    25. 25. Phase 13
    26. 26. Phase 14
    27. 27. Local Service Diversions <ul><li>Manholes </li></ul><ul><li>Shallow trench excavations </li></ul><ul><li>Short durations </li></ul><ul><li>Works in road way carried out at night </li></ul>
    28. 28. Local Service Diversions
    29. 29. Main Works & Phasing
    30. 30. Main Works Station Construction <ul><ul><li>Main works 48 months (excavation and concrete works) 2012 to 2016 </li></ul></ul><ul><ul><li>Equipping the Station 12 months </li></ul></ul><ul><ul><li>Testing and commissioning the system 12months </li></ul></ul><ul><ul><li>Main works is carried out in 2 distinct phases to ensure pedestrian access maintained </li></ul></ul>
    31. 31. Main Works Phase 1 (12months)
    32. 32. Main Works Phase 2 (30 months)
    33. 33. Pedestrian Access
    34. 34. Current Situation 10.5 m - 34ft 6 inches 4.0 m (14ft)
    35. 35. Phase 1 (12 months) 3.3 m -11ft 4.0 m (14ft)
    36. 36. Phase 2 (30 months) 3.3 m -11ft 4.0 m (14ft)
    37. 37. Current Situation 10.5 m - 34ft 6 inches
    38. 38. Phase1 (12 Months) 3.2 m – 10ft 8 inches 3.2 m min 4.0 m (14ft)
    39. 39. Phase 2 (30 Months) 3.2 m – 10ft 8 inches 3.2 m min 4.0 m (14ft)
    40. 40. Current Situation 10.5 m - 34ft 6 inches
    41. 41. Phase 2 (30 months) 3.3 m -11ft 4.0 m (14ft)
    42. 42. Traffic Management
    43. 43. Main Works Traffic Management 10 trucks entering and leaving the site per hour during the day Parnell Square East closed to general traffic during the works Local Diversions via Rutland Place General Traffic will be diverted around the area via Hill Street or Gardiner Street Overall, the impact on access to multi storey car parks in the city centre is slight with the majority of existing access arrangements remain in place
    44. 44. Main Works Traffic Management
    45. 45. Main Works Traffic Management
    46. 46. How RPA honor's it’s Commitment <ul><li>RPA will </li></ul><ul><li>Have an ongoing role throughout the works </li></ul><ul><li>Review contractor’s method of work to ensure compliance </li></ul><ul><li>Ensure you have been consulted about the works </li></ul><ul><li>Audit and monitor the works as they happen </li></ul><ul><li>Be available and answerable to you </li></ul>
    47. 47. Our Commitment to you <ul><li>A public information centre will be established </li></ul><ul><li>Communications HQ & media centre for press briefings </li></ul><ul><li>Venue for open forums with local businesses and residents </li></ul><ul><li>24/7 telephone hotline for queries and complaints </li></ul><ul><li>up to date public information on the works </li></ul><ul><li>marketing campaign for the city “open for business as usual” </li></ul><ul><li>Community Liaison Officers will be available for you </li></ul>
    48. 48. Contractor’s Commitments <ul><li>The Contractor </li></ul><ul><li>Will comply with Conditions of Contract the Railway </li></ul><ul><li>Order & EIS </li></ul><ul><li>Will plan his works in line with best practice </li></ul><ul><li>Will be a good neighbour </li></ul><ul><li>Educate and brief his workforce on an ongoing basis </li></ul><ul><li>Will engage with you </li></ul>
    49. 49. Next Steps <ul><li>November 2010 – March 2011 </li></ul><ul><li>Meet with individual businesses etc to discuss impacts and agree appropriate measures </li></ul>

    ×