Your SlideShare is downloading. ×
0
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Single storied house
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Single storied house

931

Published on

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
931
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. CYCLONE RESISTANT HOUSES USING PRE-CAST COMPONENTS AT TIDAL-SURGE PRONE COASTAL AREAS OF BANGLADESH Presented by Engr. M. A. Wahed Senior Research Engineer Housing & Building Research Institute Darus-Salam, Mirpur, Dhaka.
  • 2.  
  • 3.  
  • 4.  
  • 5.  
  • 6.  
  • 7.  
  • 8.  
  • 9.  
  • 10.  
  • 11. Estimated cost Part – A (To be done by HBRI) In word : Taka seventy one thousand five hundred fifty only. Item no. Description of items Quantity Unit Rate (in Taka) Amount (in Taka) 01. Pre-cast R.C.C pocket footing (in/c. supply of m.s. rod, cement, stone chips, sylhet sand, centering, shuttering, rod binding etc.) 4 Nos P.no 600.00 2400.00 02. Pre-stressed pre cast R.C.C tie beam and roof beam (in/c. supply of m.s. rod, cement, stone chips, sylhet sand centering, shuttering, rod binding and casting etc.) a) 5"x9" size = 17.00 rm b) 5"x7" = 12.00 rm 17.00 rm 12.00 rm P.rm P.rm 850.00 650.00 14450.00 7800.00 03. Pre-stressed pre cast R.C.C column (in/c. supply of m.s. rod, cement, stone chips, sylhet sand centering, shuttering, rod binding and casting etc.) 7 "x7" size 16.00 rm P.r m 900.00 14400.00 04. Pre-cast FC corrugated sheet (In/c. sypply of wire mesh, sylhet sand, mould making etc.) 20 sqm P.sq m 1100.00 22000.00 05. Jute Hessian, Nails, G.I. wire etc. L.S 2500.00 06. TA/DA L.S 5000.00 Total = 68550.00 contingency charge = 3000.00 Total Tk. = 71550.00
  • 12. Part - B (To be done by Contractor) In word: Taka fifty five thousand seven hundred twenty only. Item no. Description of items Quantity Unit Rate (in Taka) Amount (in Taka) 01. Earth work in excavation 9.00 cum P. cum 100.00 900.00 02. Earth filling in foundation 6.00 cum P. cum 80.00 480.00 03. Sand filling up to plinth 30.00cum P. cum 476.00 14280.00 04. 10" Brick work in foundation and plinth 4.00 cum P.cu m 3000.00 12000.00 05. Brick soling in foundation and floor. 15.00 sqm P.sq m 300.00 4500.00 06. Fitting fixing of pre cast R.C.C pocket footing R.C.C column,R.C.C beam,corrugated sheet etc. L.S 10000.00 07. Loading, Unloading and carrying charge for all pre cast elements L.S 5000.00 08. Mango wood 10 cft P.cft 350.00 3500.00 09. Borak Bamboo 10 nos P.no 200.00 2000.00 Total = 52660.00 contingency charge = 3060.00 Total Tk. = 55720.00
  • 13. C – Cladding, door & window A+B+C = ( 71550.00 + 55720.00+71510.00) = 198780.00 In word: Taka one lac ninety eight thousand seven hundred and eighty only. Item no. Description of items Quantity Unit Rate (in Taka) Amount (in Taka) 01. 5" Brick work in super structure wall 13.00 sqm P.sqm 2400.00 31200.00 02. ½ " thick wall plaster 105.00 sqm P.sqm 160.00 16800.00 03. Pre-cast R.C.C lintel including sun shade 6.50 rm P.rm 800.00 5200.00 04. White washing to wall and ceiling 102.00 sqm P.sqm 15.00 1530.00 05. Wooden door and window a) Door (size 3’x7’) b) Window (size 3’-4”x4’-0” ) 1 no 3 nos P. no P. no 4000.00 2500.00 4000.00 7500.00 06. Painting to door window frame and shutter 15.00 sqm P.sqm 125.00 1875.00 Total Tk = 68105.00 Add 5% contingency charge. = 3405.00 G. Total = 71510.00

×