Alan thornhill ri witness as lab management tool ri eshre july 2011

241 views
147 views

Published on

Alan Thornhill present RI (research instruments) RFID witnessing system as a lab managment tool at ESHRE 2011

Published in: Health & Medicine
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
241
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Alan thornhill ri witness as lab management tool ri eshre july 2011

  1. 1. RI Witness™ as a Laboratory Management Tool Dr Alan Thornhill The London Bridge Fertility, Gynaecology and Genetics Centre
  2. 2. Background • Established 1988 • 1,500 IVF/ICSI cycles p.a. (capacity 2000 +) ; 600 IUI cycles p.a. • IVF, ICSI, PGD/PGS, Egg freezing, Gamete/Embryo Cryopreservation • 60% Private : 40% NHS • Full 7-day a week service • Proven track record, large experience working with satellite (7) and transport (4) partners – QMH since 1994 • ISO 9001;2000 certified, HFEA/CQC licensed, EUTD compliant • 3 full-time sub-specialty trained consultants + Male Fertility specialist • Experienced Laboratory Team (12 Full-time) • World leaders in Reproductive Genetics • Full-time Board-Certified Genetic Counsellor
  3. 3. How often do you make mistakes? Mistakes We neverit Thethink last is low...but are very was make mistake we 1989... rare in our mistakes in in don’t know lab... our lab!
  4. 4. Total Work – 1507 yellow buttons Assign Sperm Pot Transport Egg Collection Further Culture Further Culture
  5. 5. Others? Frz Hb Sperm Step 1 Egg Freeze Egg Donation Sperm Prep Step 1 TE Biopsy Frz D Sperm Step 1 Sperm Prep Step 2 D3 Biopsy IUI D Step 1 Pre ICSI/Sperm Fishing PN Thaw Embryo Surrogate Set-up Assign IUI sperm pot Post Biopsy IUI Hb Step 1 PN Thaw IUI Sperm Prep step 2 ICSI Embryo Thaw PB Boipsy ICSI Holding
  6. 6. Total Work Load
  7. 7. BC35321Dish III not tagged
  8. 8. Summary • • • • • • • Detection and Prevention of errors Risk management/continuous improvement Traceability Competency assessment Productivity Identify training needs Etc etc......

×