New York City Benchmarking      REBNY – Multifamily Programs           January 28, 2011           Cameron Bard NYSERDA1
New York State Energy R&D Authority• Established in 1975     – administering energy efficiency & clean energy       progra...
NYSERDA Benchmarking Services• Services and On-Site Energy Analysis• Pre-Qualified Consultants     – Flex Tech and Multifa...
Multifamily Performance Program (MPP)• Launched in May 2007     – MPP Version 4 was launched September ‘10• Program for al...
Benefits of MPP Participation• Reduced Energy Costs     – minimum of 15% source energy reduction projections     – current...
Multifamily Program Options                                         75 + Units - NYSERDA    < 76 Units – NYSERDA or Con Ed...
MPP ProcessPLAN    scoping session with owner/management    benchmarking    audit & energy reduction plan (ERP)INSTALL    ...
MPP Incentive Levels: Existing Buildings                                                                        AFFORDABLE...
MPP Incentive Levels: New Construction                                                                        AFFORDABLE H...
Most Recommended Measures: Existing                      Refrigerators, install Energy Star           Lighting, fluorescen...
Most Recommended Measures: New Construction                    Insulation, roof deck or attic               Refrigerators,...
MPP Timeline       Notice to                                       60 Days                    ERP Submittal       Proceed ...
Participation Type: Existing Buildings                            Condo                             2%              Non-Pr...
Participation Type: New Construction               Market                Rate                15%                        Af...
Interested in Participating?Visit:www.getenergysmart.orgEmail:MultifamilyPrograms@nyserda.org15
Upcoming SlideShare
Loading in...5
×

REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Buildings

1,049

Published on

Cameron Bard, NYSERDA

Watch a video of this presentation and more at http://www.rebny.com

Published in: Real Estate, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,049
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Buildings"

  1. 1. New York City Benchmarking REBNY – Multifamily Programs January 28, 2011 Cameron Bard NYSERDA1
  2. 2. New York State Energy R&D Authority• Established in 1975 – administering energy efficiency & clean energy programs since the 1990s• Commercial, Industrial, and Residential Programs• Statewide Funding – primarily funded by ratepayers – SBC, EEPS, etc. 2
  3. 3. NYSERDA Benchmarking Services• Services and On-Site Energy Analysis• Pre-Qualified Consultants – Flex Tech and Multifamily Partners• Services Initially Funded by NYSERDA – cost-sharing for expenses above $7,000• Emphasis on Transition into MPP – projects encouraged to continue with additional NYSERDA services 3
  4. 4. Multifamily Performance Program (MPP)• Launched in May 2007 – MPP Version 4 was launched September ‘10• Program for all 5+ Unit New and Existing Buildings – benchmarking – energy audit & energy reduction planning• Participant and Partner Relationship – pre-qualified energy consultants work to develop a work scope detailing how the building will achieve a 15% source energy reduction target• Advanced Modeling Techniques – thermodynamic modeling allows for accurate baseline and post- retrofit energy saving analysis 4
  5. 5. Benefits of MPP Participation• Reduced Energy Costs – minimum of 15% source energy reduction projections – current annual, average for existing buildings post-retrofit: 25%• Reduced Operations & Maintenance Costs – “building as a whole” approach• Continued Affordability for Residents – protection against rising fuel costs• Resident Comfort – health and safety just as important as energy savings• Compliance with Benchmarking Legislation 5
  6. 6. Multifamily Program Options 75 + Units - NYSERDA < 76 Units – NYSERDA or Con Edison6
  7. 7. MPP ProcessPLAN scoping session with owner/management benchmarking audit & energy reduction plan (ERP)INSTALL 50% completion inspection substantial completion inspectionMEASURE post construction benchmarking7
  8. 8. MPP Incentive Levels: Existing Buildings AFFORDABLE HOUSING MARKET-RATE HOUSING PLAN PAYMENT #1 Base Incentive $5,000 / project $2,500 / project (projects up to 30 units) Base Incentive $10,000 / project $5,000 / project (projects from 31-500 units Incremental Incentive $20 / unit (over 100 units) $10 / unit (over 100 units Incentive payable upon of the Energy Reduction Plan and associated documents, which must include documentation that the building has been benchmarked using the NYSERDA Benchmarking Tool. The list of required documents and additional information is located in Program Guidelines Section 3.INSTALL PAYMENT #2 $300 / unit Incentive payable at 50% construction complete, based upon a successful Program inspection. The list of required documents and additional information is located in Program Guidelines Section 4.MEASURE PAYMENT #3 $300 / unit Incentive payable at substantial completion of construction, based upon a successful Program inspection, performance testing (as applicable), and verification of active utility accounts. The list of required documents and additional information is located in Program Guidelines Section 4. 8
  9. 9. MPP Incentive Levels: New Construction AFFORDABLE HOUSING MARKET-RATE HOUSING PLAN PAYMENT #1 Performance Path $20,000 / project $15,000 / project Prescriptive Path N/A N/A Payable upon approval of the Proposed Energy Reduction Plan and associated documents. The list of required documents and additional information is located in Program Guidelines Section 3. Payment #1 is available for performance path projects only.INSTALL PAYMENT #2 $1.00/ghsf* Payment upon approval of the Open-Wall Site Inspection. The list of required documents and additional information is located in Program Guidelines Section 3.MEASURE PAYMENT #3 $0.50/ghsf* minus 10% retainage Payable upon approval of the As-Built Energy Reduction Plan (Performance path projects only) and the As-Built Site Inspection. The list of required documents and additional information is located in Program Guidelines Section 3. PAYMENT #4 10% retainage held from Payment #3 Payable upon receipt of the Fuel Release Forms as detailed in the Participation Agreement. The list of required documents and additional information is located in Program Guidelines Section 3. 9
  10. 10. Most Recommended Measures: Existing Refrigerators, install Energy Star Lighting, fluorescent, upgrade existing - CA Insulation, roof deck or attic Lighting, incandescent to fluorescent - apts Low-flow aerators, install Envelope penetrations, seal (with energy savings) Boiler, replace Low-flow showerheads, install Lighting, CFLs, install Windows, replace, apts Lighting, fluorescent, upgrade existing - apts Piping, DHW, insulate DHW, controls Boiler, new high efficiency, install DHW heater, high efficiency, install Exterior doors, weatherstrip or airseal Thermostatic radiator valves, install Lighting, exterior, upgrade or install Washing machines, install Energy Star Programmable thermostats, install 0% 10% 20% 30% 40% 50% 60%10
  11. 11. Most Recommended Measures: New Construction Insulation, roof deck or attic Refrigerators, install Energy Star Insulation, walls Windows, new high efficiency, install, apts Washing machines, install Energy StarLighting, High Efficiency Flourescent, Apt install Boiler, new high efficiency, installLighting, High Efficiency Flourescent, CA, install Lighting, occupancy sensors, install Air Conditioners, install Dishwasher, Install Energy Star Low-flow showerheads, install Low-flow aerators, install Exhaust fans, install Energy Star DHW indirect-fired heater, install Insulation, Below Grade Walls Lighting, exterior, upgrade or install Pumps, VFD Install Motors, Install NEMA premium efficiency Elevator, High Efficiency, install 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%11
  12. 12. MPP Timeline Notice to 60 Days ERP Submittal Proceed Construction ERP Approval One Year Completion2011 2012 Projects Must Be In Construction by November 2011 12
  13. 13. Participation Type: Existing Buildings Condo 2% Non-Profit Co-op Rental 20% 20% For-Profit Rental 58%13
  14. 14. Participation Type: New Construction Market Rate 15% Affordable 85%14
  15. 15. Interested in Participating?Visit:www.getenergysmart.orgEmail:MultifamilyPrograms@nyserda.org15
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×