Your SlideShare is downloading. ×
Mod13 a av3
Mod13 a av3
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
394
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Module 13AA TIME VALUE OF MONEY CALCULATIONS OBJECTIVE: Time value of money calculations usually involve four variables, a present value, future value, interest rate and a number of periods. This program will calculate any of these variables given the other three variables. INPUTS (will appear in blue): Where prompted, enter: a) The amount at the end or future value (FV) b) The amount at the beginning or present value (PV) c) The interest rate in decimals (i) d) The number of periods from beginning to end (n) Sample data have been entered as an example. a. Calculate future value, given the other three variables: PV i n -------------- -------------- -------------- Enter variables: 1000 10.0% 10 -------------- -------------- -------------- Answer: 2593.74 b. Calculate present value, given the other three variables: FV i n -------------- -------------- -------------- Enter variables: 2594 10.0% 10 -------------- -------------- -------------- Answer: 1000.10 c. Calculate interest rate, given the other three variables: PV FV n -------------- -------------- -------------- Enter variables: 1000 2594 10 -------------- -------------- -------------- Answer: 10.0%
  • 2. d. Calculate number of periods, given the other three variables: PV FV i -------------- -------------- -------------- Enter variables: 1000 2594 10.0% -------------- -------------- -------------- Answer: 10.00

×