• Save
EBM Governance
Upcoming SlideShare
Loading in...5
×
 

EBM Governance

on

  • 81 views

 

Statistics

Views

Total Views
81
Views on SlideShare
55
Embed Views
26

Actions

Likes
0
Downloads
0
Comments
0

5 Embeds 26

http://philipjung.blogspot.kr 19
http://philipjung.blogspot.in 3
http://philipjung.blogspot.co.uk 2
http://philipjung.blogspot.hk 1
http://philipjung.blogspot.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

EBM Governance EBM Governance Presentation Transcript

  • Step 1 Log Enhancement Requirement Owner Stage 1 Requirement Review Step 2 Validate Enhancement EBO/EBM Committee Step 1 EBO Content Finalization EBO/EBM Committee Stage 2 EBO Enhancement Assessment Step 2 Design Decision Documentatio n EBO/EBM Committee Step 1 Content Review EBO/EBM Committee Stage 3 EBO Design Step 2 Shared Component/ NDR Review Design Committee Step 3 Draft EBO Validation Application SME Step 4 Design Decision Documentatio n EBO/EBM Committee Step54 Shared Component Request EBO/EBM Committee Step 1 Special EBM Request Application SME Stage 4 EBM Definition Step 2 EBM Definition EBO/EBM Committee Step 3 Interval Review EBO/EBM Design Step 4 Special EBM Documentatio n EBO/EBM Design Step 1 Versioning Development Stage 5 Transfer CR To AIA Development Step 2 Schema Update (EBO, EBM) Development Step 1 Schema Validation EBO/EBM Committee Stage 6 Validation Step 2 EBO/EBM Validation Application SME EBM Governance (Type: PPT, Total Page: 31) EBO/EBM Governance is not only AIA team, All RODOD architect should discuss together. Example Process Schedule Internal Review Meeting with EBO/EBM governance committee and AIA Schedule Internal Review Meeting with EBO/EBM governance committee and Application POC (Level 1 Meeting) Meeting attendance should be restricted to EBO/EBM governance committee and Application POC only Analyze and Assess the scope of change in the area Impacting AIA Components – EBO, EBM, ABCS, APIs Impacting Applications Decision to involve second level of Discussion along with SME Approve the change based on the first level of assessment (Level 2 Meeting) EBO/EBM governance committee Application POC Contact: yohaim@gmail.com Blog: http://philipjung.blogspot.kr