Modular Project Management
Functionality
 Budget management
 Live costs
 Sage and 3rd Party
Integration
 Overhead cost control
 Multi-user
 Seamless workflows
 Labour Assign
 Supervisor tablet
integration
 No paper SPC packs
 Electronic forms
 Custom forms
 Customisable
IPS ran a Project where they did over 250,000 man shifts over a year period and
had 220 staff in the field and operated 45 tablets per night. IPS saved as a result
of the implementation of the IMS and SPIDER
Description Saving/Benefit per annum
Labour Allocation used to be done over a number of Spreadsheets with a Senior
Project Manager Managing the day to day operation. This was very restrictive, only
one person having editing access & no feed back to pay role.
Senior PM 50% of his working week,
along with labour coordinator
contacting all staff.
£35,000
Reconciliation of Time sheets and the process of Contractor/agency payments Reduction from 2 full time staff to one. £22,000
Stores and consumable requests were sent by fax and had to be reviewed by the
Engineer, there were a lot of miss understandings and shortages to site.
Efficiencies within stores and site £5,000
Tools and Plant Now all Supervisors are accountable for all of the tools and Hire
Equipment that they have been allocated.
30% reduction in the loss of Plant and
equipment & ease of redeployment
(less hire)
£7,200
Project Documentation all the documents were paper copies and had to be updated
manually
Saving on printing and compiling SPC
paper packs, less non conformities on
Client Inspections
£15,500
Site reports were sent in by fax they had to be typed and then checked and
amended for our clients. Down time submitted daily. Ability to attach photographs
2 admin staff and time spent by
Engineers amending and then proofing
the Reports
£25,000
Case Study of IPS Savings
Description Saving/Benefit per annum
Labour Assign the ability to mitigate any lost shifts and relocation of labour Client satisfaction, and reduction in
lost time claims.
£15,000
Control of Training Records and selection of available staff for Projects Reduction in HR support staff and
ease of renewing training
£3,500
Accountability of Purchase Orders and tracking of equipment to site and then into
Handover pack
Reduction of purchasing admin along
with saving in accounts time
£6,500
Time sheets and Engineers Logs, accurate records The ability to prove a detailed list of
booking for substantiation of potential
claims
£18,000
As a result of implementing the IMS and SPIDER IPS saved in the region of
£150,000 per annum
*Based on IPS previously using Excel spreadsheets and emails to complete the same tasks.
Intranet Modules
Project
Control
Human
Resources
Stores
Fleet /
Vehicle
Document
Control
Information
Technology
HSQE
Purchasing
 Intranet rollout in
stages
 HR and Project Control
are required for basic
SPIDER functionality
 HR, Project Control,
Stores and Document
control are required for
full SPIDER
functionality
Tablets
(SPIDER)
Head
Office
Home
Users
Remote
Offices
Cloud Intranet Solution
 Access to the intranet
anywhere
 Always on connection.
Tablets sync every 10
minutes while
connected to the
internet
 Automatically backed
up and built in
redundancy and
disaster recovery
Work Flow
Sales Enquiry
Work Order
S.P.I.D.E.R.
Daily Site Report
Transmit to Customer
 An example of one of
the many work flows
within the system, from
Sales Enquiry to
transmitting the daily
report to the customer
 Everything is contained
within either the Intranet
or temporarily stored on
the SPIDER awaiting
upload to the intranet
SPIDER Modules
SPIDER
Daily Site
Reports
Daily
Tasks
SPC
Declaration
Generic
Forms
PhotosLatest
Documents
Tools
and Plant
Stores
Requests
Site
Permits
(Sabres)
 Supported on any 10″ Android
Tablet
 Recommended Samsung
Galaxy Note 10.1
 S-Pen
 8MP Camera with flash
and autofocus for better
photographs even in
tunnels
 32GB of internal storage
 Trial ongoing with the latest
Huawei 10″ tablet with NFC to
scan sentinel cards
Compliancy
 Assist with maintaining the following standards using the
action register and CrystalBall
 ISO:9001
 Link-up
 FORS

More Related Content

What's hot

TimenTask Features
TimenTask FeaturesTimenTask Features
TimenTask FeaturesTimenTask
 
Accounting Consolidation Made Easy
Accounting Consolidation Made EasyAccounting Consolidation Made Easy
Accounting Consolidation Made EasyOdoo
 
account general Pakistan revenue SAP
account general Pakistan revenue SAPaccount general Pakistan revenue SAP
account general Pakistan revenue SAPHabib Rahim
 
Inventory and Barcode - Manage your Stock with a Barcode Scanner
Inventory and Barcode - Manage your Stock with a Barcode ScannerInventory and Barcode - Manage your Stock with a Barcode Scanner
Inventory and Barcode - Manage your Stock with a Barcode ScannerOdoo
 
Cbn short presentation
Cbn short presentationCbn short presentation
Cbn short presentationPhil Filkovsky
 
Civil engineering surveying_geopal
Civil engineering surveying_geopalCivil engineering surveying_geopal
Civil engineering surveying_geopalGeoPal Solutions
 
Why cimatron solution for EPC
Why cimatron solution for EPCWhy cimatron solution for EPC
Why cimatron solution for EPCAditya Infotech
 
Workshop: Budgets and Forecasts with Odoo Spreadsheets
Workshop: Budgets and Forecasts with Odoo SpreadsheetsWorkshop: Budgets and Forecasts with Odoo Spreadsheets
Workshop: Budgets and Forecasts with Odoo SpreadsheetsOdoo
 
Smart, mobile and flexible maintenance | CMMS by Productoo
Smart, mobile and flexible maintenance | CMMS by ProductooSmart, mobile and flexible maintenance | CMMS by Productoo
Smart, mobile and flexible maintenance | CMMS by ProductooPavla Doležalová
 
CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17Jessica Caprilozzi
 
Total Control Brochure
Total Control BrochureTotal Control Brochure
Total Control BrochureGeorge Begonia
 
Become Compliant with Accounting Standards
Become Compliant with Accounting StandardsBecome Compliant with Accounting Standards
Become Compliant with Accounting StandardsOdoo
 
Go digital & Boost your factory performance!
Go digital & Boost your factory performance!Go digital & Boost your factory performance!
Go digital & Boost your factory performance!Pavla Doležalová
 
Digitization and decision making | Smart decisions with solutions by Productoo
Digitization and decision making | Smart decisions with solutions by ProductooDigitization and decision making | Smart decisions with solutions by Productoo
Digitization and decision making | Smart decisions with solutions by ProductooPavla Doležalová
 
We drive the digital evolution | Industry 4.0 solutions by Productoo
We drive the digital evolution | Industry 4.0 solutions by ProductooWe drive the digital evolution | Industry 4.0 solutions by Productoo
We drive the digital evolution | Industry 4.0 solutions by ProductooPavla Doležalová
 

What's hot (18)

TimenTask Features
TimenTask FeaturesTimenTask Features
TimenTask Features
 
Accounting Consolidation Made Easy
Accounting Consolidation Made EasyAccounting Consolidation Made Easy
Accounting Consolidation Made Easy
 
account general Pakistan revenue SAP
account general Pakistan revenue SAPaccount general Pakistan revenue SAP
account general Pakistan revenue SAP
 
Inventory and Barcode - Manage your Stock with a Barcode Scanner
Inventory and Barcode - Manage your Stock with a Barcode ScannerInventory and Barcode - Manage your Stock with a Barcode Scanner
Inventory and Barcode - Manage your Stock with a Barcode Scanner
 
Year End Maintenance Check List
Year End Maintenance Check ListYear End Maintenance Check List
Year End Maintenance Check List
 
Cbn short presentation
Cbn short presentationCbn short presentation
Cbn short presentation
 
Civil engineering surveying_geopal
Civil engineering surveying_geopalCivil engineering surveying_geopal
Civil engineering surveying_geopal
 
Why cimatron solution for EPC
Why cimatron solution for EPCWhy cimatron solution for EPC
Why cimatron solution for EPC
 
Workshop: Budgets and Forecasts with Odoo Spreadsheets
Workshop: Budgets and Forecasts with Odoo SpreadsheetsWorkshop: Budgets and Forecasts with Odoo Spreadsheets
Workshop: Budgets and Forecasts with Odoo Spreadsheets
 
Smart, mobile and flexible maintenance | CMMS by Productoo
Smart, mobile and flexible maintenance | CMMS by ProductooSmart, mobile and flexible maintenance | CMMS by Productoo
Smart, mobile and flexible maintenance | CMMS by Productoo
 
Resume
ResumeResume
Resume
 
Taxi And Limo Recommendations
Taxi And Limo RecommendationsTaxi And Limo Recommendations
Taxi And Limo Recommendations
 
CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17CBN Supply Vending Presentation 7-13-17
CBN Supply Vending Presentation 7-13-17
 
Total Control Brochure
Total Control BrochureTotal Control Brochure
Total Control Brochure
 
Become Compliant with Accounting Standards
Become Compliant with Accounting StandardsBecome Compliant with Accounting Standards
Become Compliant with Accounting Standards
 
Go digital & Boost your factory performance!
Go digital & Boost your factory performance!Go digital & Boost your factory performance!
Go digital & Boost your factory performance!
 
Digitization and decision making | Smart decisions with solutions by Productoo
Digitization and decision making | Smart decisions with solutions by ProductooDigitization and decision making | Smart decisions with solutions by Productoo
Digitization and decision making | Smart decisions with solutions by Productoo
 
We drive the digital evolution | Industry 4.0 solutions by Productoo
We drive the digital evolution | Industry 4.0 solutions by ProductooWe drive the digital evolution | Industry 4.0 solutions by Productoo
We drive the digital evolution | Industry 4.0 solutions by Productoo
 

Similar to IMS

HiKey_Time2L_Introduction_20160223
HiKey_Time2L_Introduction_20160223HiKey_Time2L_Introduction_20160223
HiKey_Time2L_Introduction_20160223Quirin Schwaighofer
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesPTC
 
Practical Project Management for Engineers and Technicians
Practical Project Management for Engineers and TechniciansPractical Project Management for Engineers and Technicians
Practical Project Management for Engineers and TechniciansLiving Online
 
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...Time Management using CATS webdynpro, Interactive forms and Smartcard digital...
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...tanckaert
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Practical Project Management for Engineers & Technicians
Practical Project Management for Engineers & TechniciansPractical Project Management for Engineers & Technicians
Practical Project Management for Engineers & TechniciansLiving Online
 
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiK3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiFujitsu India
 
Sai Boonwaat Linked In
Sai Boonwaat Linked InSai Boonwaat Linked In
Sai Boonwaat Linked InSaiB123
 
FM Cost Savings It’s Crucial Sanjay C
FM Cost Savings   It’s Crucial   Sanjay CFM Cost Savings   It’s Crucial   Sanjay C
FM Cost Savings It’s Crucial Sanjay CSanjay Chaudhuri
 
Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurementspmosgofian
 
An all in-one Engineer-to-Order (ETO) Solution with Odoo
An all in-one Engineer-to-Order (ETO) Solution with OdooAn all in-one Engineer-to-Order (ETO) Solution with Odoo
An all in-one Engineer-to-Order (ETO) Solution with OdooOdoo
 
ROI and Economic Value of Data Virtualization
ROI and Economic Value of Data VirtualizationROI and Economic Value of Data Virtualization
ROI and Economic Value of Data VirtualizationDenodo
 
Accelerate your Business Recovery with RPA | Converga
Accelerate your Business Recovery with RPA | ConvergaAccelerate your Business Recovery with RPA | Converga
Accelerate your Business Recovery with RPA | ConvergaCanon Business Services
 
Achieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologyAchieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologySSFIndia1
 
Harlan George Webber CV 2016.02
Harlan George Webber CV 2016.02Harlan George Webber CV 2016.02
Harlan George Webber CV 2016.02Harlan Webber
 

Similar to IMS (20)

HiKey_Time2L_Introduction_20160223
HiKey_Time2L_Introduction_20160223HiKey_Time2L_Introduction_20160223
HiKey_Time2L_Introduction_20160223
 
Rh irving case study
Rh irving   case studyRh irving   case study
Rh irving case study
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service Capabilities
 
Practical Project Management for Engineers and Technicians
Practical Project Management for Engineers and TechniciansPractical Project Management for Engineers and Technicians
Practical Project Management for Engineers and Technicians
 
Sharmillah CV Feb 2016
Sharmillah CV Feb 2016Sharmillah CV Feb 2016
Sharmillah CV Feb 2016
 
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...Time Management using CATS webdynpro, Interactive forms and Smartcard digital...
Time Management using CATS webdynpro, Interactive forms and Smartcard digital...
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Practical Project Management for Engineers & Technicians
Practical Project Management for Engineers & TechniciansPractical Project Management for Engineers & Technicians
Practical Project Management for Engineers & Technicians
 
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiK3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
 
Sai Boonwaat Linked In
Sai Boonwaat Linked InSai Boonwaat Linked In
Sai Boonwaat Linked In
 
FM Cost Savings It’s Crucial Sanjay C
FM Cost Savings   It’s Crucial   Sanjay CFM Cost Savings   It’s Crucial   Sanjay C
FM Cost Savings It’s Crucial Sanjay C
 
Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurement
 
ADOPT Use Cases
ADOPT Use CasesADOPT Use Cases
ADOPT Use Cases
 
An all in-one Engineer-to-Order (ETO) Solution with Odoo
An all in-one Engineer-to-Order (ETO) Solution with OdooAn all in-one Engineer-to-Order (ETO) Solution with Odoo
An all in-one Engineer-to-Order (ETO) Solution with Odoo
 
ROI and Economic Value of Data Virtualization
ROI and Economic Value of Data VirtualizationROI and Economic Value of Data Virtualization
ROI and Economic Value of Data Virtualization
 
Accelerate your Business Recovery with RPA | Converga
Accelerate your Business Recovery with RPA | ConvergaAccelerate your Business Recovery with RPA | Converga
Accelerate your Business Recovery with RPA | Converga
 
JA Erasmus Resume
JA Erasmus ResumeJA Erasmus Resume
JA Erasmus Resume
 
Achieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologyAchieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart Technology
 
Ahmed Abdelaziz CV
Ahmed Abdelaziz CVAhmed Abdelaziz CV
Ahmed Abdelaziz CV
 
Harlan George Webber CV 2016.02
Harlan George Webber CV 2016.02Harlan George Webber CV 2016.02
Harlan George Webber CV 2016.02
 

IMS

  • 2. Functionality  Budget management  Live costs  Sage and 3rd Party Integration  Overhead cost control  Multi-user  Seamless workflows  Labour Assign  Supervisor tablet integration  No paper SPC packs  Electronic forms  Custom forms  Customisable
  • 3. IPS ran a Project where they did over 250,000 man shifts over a year period and had 220 staff in the field and operated 45 tablets per night. IPS saved as a result of the implementation of the IMS and SPIDER Description Saving/Benefit per annum Labour Allocation used to be done over a number of Spreadsheets with a Senior Project Manager Managing the day to day operation. This was very restrictive, only one person having editing access & no feed back to pay role. Senior PM 50% of his working week, along with labour coordinator contacting all staff. £35,000 Reconciliation of Time sheets and the process of Contractor/agency payments Reduction from 2 full time staff to one. £22,000 Stores and consumable requests were sent by fax and had to be reviewed by the Engineer, there were a lot of miss understandings and shortages to site. Efficiencies within stores and site £5,000 Tools and Plant Now all Supervisors are accountable for all of the tools and Hire Equipment that they have been allocated. 30% reduction in the loss of Plant and equipment & ease of redeployment (less hire) £7,200 Project Documentation all the documents were paper copies and had to be updated manually Saving on printing and compiling SPC paper packs, less non conformities on Client Inspections £15,500 Site reports were sent in by fax they had to be typed and then checked and amended for our clients. Down time submitted daily. Ability to attach photographs 2 admin staff and time spent by Engineers amending and then proofing the Reports £25,000 Case Study of IPS Savings
  • 4. Description Saving/Benefit per annum Labour Assign the ability to mitigate any lost shifts and relocation of labour Client satisfaction, and reduction in lost time claims. £15,000 Control of Training Records and selection of available staff for Projects Reduction in HR support staff and ease of renewing training £3,500 Accountability of Purchase Orders and tracking of equipment to site and then into Handover pack Reduction of purchasing admin along with saving in accounts time £6,500 Time sheets and Engineers Logs, accurate records The ability to prove a detailed list of booking for substantiation of potential claims £18,000 As a result of implementing the IMS and SPIDER IPS saved in the region of £150,000 per annum *Based on IPS previously using Excel spreadsheets and emails to complete the same tasks.
  • 5. Intranet Modules Project Control Human Resources Stores Fleet / Vehicle Document Control Information Technology HSQE Purchasing  Intranet rollout in stages  HR and Project Control are required for basic SPIDER functionality  HR, Project Control, Stores and Document control are required for full SPIDER functionality
  • 6. Tablets (SPIDER) Head Office Home Users Remote Offices Cloud Intranet Solution  Access to the intranet anywhere  Always on connection. Tablets sync every 10 minutes while connected to the internet  Automatically backed up and built in redundancy and disaster recovery
  • 7. Work Flow Sales Enquiry Work Order S.P.I.D.E.R. Daily Site Report Transmit to Customer  An example of one of the many work flows within the system, from Sales Enquiry to transmitting the daily report to the customer  Everything is contained within either the Intranet or temporarily stored on the SPIDER awaiting upload to the intranet
  • 8. SPIDER Modules SPIDER Daily Site Reports Daily Tasks SPC Declaration Generic Forms PhotosLatest Documents Tools and Plant Stores Requests Site Permits (Sabres)  Supported on any 10″ Android Tablet  Recommended Samsung Galaxy Note 10.1  S-Pen  8MP Camera with flash and autofocus for better photographs even in tunnels  32GB of internal storage  Trial ongoing with the latest Huawei 10″ tablet with NFC to scan sentinel cards
  • 9. Compliancy  Assist with maintaining the following standards using the action register and CrystalBall  ISO:9001  Link-up  FORS