Discovery Space Shuttle

1,572
views

Published on

Here's a sneak peak into how America's space shuttle Discovery is being made and launched

Here's a sneak peak into how America's space shuttle Discovery is being made and launched

Published in: Technology

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,572
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY
  • 2. External Tank Arrives by Barge from MS
  • 3.  
  • 4. Vertical Assembly Building External Tank
  • 5. Removing External Tank From Carrier
  • 6.  
  • 7. External Tank Enters VAB
  • 8. External Tank in VAB
  • 9. Preparing to Lift the Tank to Vertical
  • 10. Lifting Tank
  • 11. Solid Rockets Are Attached
  • 12. Engines Are Attached To Solids
  • 13. Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  • 14.  
  • 15.  
  • 16.  
  • 17. Shuttle In Sling Ready For Lift In VAB
  • 18. Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
  • 19.  
  • 20. Shuttle is Attached
  • 21.  
  • 22.  
  • 23.  
  • 24. Payload Preparation Room (PPR)
  • 25. Cargo Package For ISS
  • 26. New Module For ISS
  • 27. Payload Ready To Be Moved to The Launch Pad
  • 28.  
  • 29. Payload Carrier Leaves PPR
  • 30.  
  • 31. Payload Being Moved To Launch Pad
  • 32.  
  • 33. Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
  • 34.  
  • 35.  
  • 36. Shuttle Discovery Leaves VAB
  • 37.  
  • 38. Shuttle & Crawler Launch Pad TRIP: Length--- 3 ½ mi Time--- 6-8 hours
  • 39.  
  • 40. Crawler Control
  • 41.  
  • 42. DISCOVERY ARRIVES AT PAD
  • 43.  
  • 44.  
  • 45.  
  • 46. READY FOR LAUNCH
  • 47. We Have Lift Off
  • 48.