• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this document? Why not share!

News 20111130 rules

on

  • 282 views

News 20111130 rules

News 20111130 rules

Statistics

Views

Total Views
282
Views on SlideShare
282
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    News 20111130 rules News 20111130 rules Document Transcript

    • News November 30th, 2011 Dobrogea wind turbines will change the rules in the transportation of energy Electricity production may be too high to network capacity, experts warned at a conference "Forbes". Maximum power input that could be obtained only from wind turbines installed in Dobrogea is estimated at 8 GW, while the total transport capacity for this type of energy is only 4 GW. In addition, from Dobrogea energy cannot be exported to the south (Bulgaria), east (Black Sea) or north (Republic of Moldova or Ukraine), so that producers there are left with the only alternative delivery to Romania, a country that is so supersaturated. All this happens while from Dobrogea to Romania there are only few "wires" that pass electricity across the Danube. This alarm was pulled by the Director for Energy and Resources of the consulting company Deloitte, who attended the conference "What is myth and what is reality as the idea that renewable energy is one of the most profitable investment in crisis", organized by the magazine "Forbes".Eng. Paul Keisch Page 1
    • News November 30th, 2011 Transelectrica, under pressure "Dobrogea is a ‘hot zone’ for Transelectrica. The transport operator was already under intense pressure to strengthen the network to allow secure connection of further 2 Cernavodă NPPs. Making a transmission lines across the Danube is already a technical challenge, after resolving legal challenges related to securing the necessary land and approval of such investments. Of course, it is necessary to overcome financial challenges related to such investment for a company listed on the stock market and state controlled", said, in one study, the consultant of Deloitte. 4 GW is a total transport capacity for wind power energy in Romania.Eng. Paul Keisch Page 2