Your SlideShare is downloading. ×
Concept 2Deployment (C2D)<br />Paripoorna Software Solution Service (P) Ltd<br />
Introduction to C2D<br />Comprises of all aspects of software development from Concept to Deployment (C2D)<br />We work wi...
C2D – Paripoorna Framework<br /><ul><li>Your Idea
Our Value Add – Expertise
7-Step Model
Continuous Improvement</li></li></ul><li>Your Idea<br />You have a brilliant idea, a business innovation for the B2B, B2C ...
Our Value Add<br />Business Consulting<br />Microfinance<br />Banking, Financial Services <br />Insurance<br />Travel, Tra...
7-Step Process<br />Iterative<br />
           Conceptualization<br />You have a concept, a breakthrough idea, but are not sure of where to start the developm...
Feasibility study
Current market trend study
USP definition
ROI</li></li></ul><li>        Business Requirements<br />The foundation stone of the development process are the Business ...
The Requirements are fixed and approved by customer
Marking the modules into different phases</li></ul>Concept<br />
Upcoming SlideShare
Loading in...5
×

Paripoorna concept to deployment v 1.0

392

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
392
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Paripoorna concept to deployment v 1.0"

  1. 1. Concept 2Deployment (C2D)<br />Paripoorna Software Solution Service (P) Ltd<br />
  2. 2. Introduction to C2D<br />Comprises of all aspects of software development from Concept to Deployment (C2D)<br />We work with customer right from conceptualization stage rather than requirements stage<br />We do not have to begin with elaborate Traditional RFP. C2D takes care of it.<br />Business Analyst collaborates with Technology personnel and drafts the business requirement effectively with optimal Business Analyst effort<br />Ensures <br />Faster implementation than packaged solution<br />Greater flexibility than in-house projects<br />Cost effective than traditional integration projects<br />
  3. 3. C2D – Paripoorna Framework<br /><ul><li>Your Idea
  4. 4. Our Value Add – Expertise
  5. 5. 7-Step Model
  6. 6. Continuous Improvement</li></li></ul><li>Your Idea<br />You have a brilliant idea, a business innovation for the B2B, B2C market, an interesting proposition for a niche market or a commercial product for the consumer market. <br />How do your transform your idea into something tangible? Coming up with a new and interesting proposition is one thing. But successfully transforming concept to a solution and taking it to introducing market demands additional expertise. <br />Paripoorna offers this expertise based on years of experience in solution and product development combined with a pragmatic, no-nonsense approach. This combination is what forms our added value.<br />
  7. 7. Our Value Add<br />Business Consulting<br />Microfinance<br />Banking, Financial Services <br />Insurance<br />Travel, Transportation and Logistics<br />Real estate<br />Manufacturing<br />Retail<br />Technology Consulting<br />Linux – Apache –MySQL – PHP<br />Joomla / Drupal / Wordpress<br />DOTNET / J2EE Platforms<br />Rational Unified Process / Agile<br />MS SQL Server / Oracle<br />Application Design<br />Development<br />Validation and Verification<br />Deployment<br />On-going support and maintenance<br />
  8. 8. 7-Step Process<br />Iterative<br />
  9. 9. Conceptualization<br />You have a concept, a breakthrough idea, but are not sure of where to start the development, here is where we sit with you and turn your concept into a process and lay the foundations of the development process.<br />CONCEPT<br /><ul><li>Brainstorming sessions
  10. 10. Feasibility study
  11. 11. Current market trend study
  12. 12. USP definition
  13. 13. ROI</li></li></ul><li> Business Requirements<br />The foundation stone of the development process are the Business Requirements, they are the boundaries that define your Idea. These boundaries are the margin between what your Idea is and is-not.<br />REQUIREMENTS<br /><ul><li>The Requirements are drafted keeping the concept in mind
  14. 14. The Requirements are fixed and approved by customer
  15. 15. Marking the modules into different phases</li></ul>Concept<br />
  16. 16. Solution Design<br />Development team describes desired features, functionalities and operations in detail, including SDLC process & screen layouts, business rules & standards, process diagrams & DFD, pseudo-code and related documentation<br />SOLUTION<br /><ul><li>The Screen Navigation Document – A document explaining the flow of the solution
  17. 17. The Proof of Concept – A mock up of the solution in a similar model as that of the end solution
  18. 18. Architecture design, process diagrams etc
  19. 19. Infrastructure Management Services</li></ul>Requirements<br />
  20. 20. Development<br />Up on your Confirmation of the solution design we start with the development process. Here is where the entire solution takes shape and reaches the delivery state.<br />DEVELOPMENT<br /><ul><li>The Solution is developed based on the architecture design, POC and SND
  21. 21. Unit Test Case Preparation and Testing
  22. 22. Code Review
  23. 23. Build Automation</li></ul>Solution<br />
  24. 24. Validation & Verification<br />Once the Solution is developed it is handed over you for a complete verification and validation to ensure that the solution implements your concept<br />VERIFICATION AND VALIDATION<br /><ul><li>Test Strategy, Test Plan and Test Cases
  25. 25. System/Integration Testing
  26. 26. User Acceptance Testing Support
  27. 27. Product Verification testing</li></ul>Development<br />
  28. 28. Deployment and Maintenance<br />DEPLOYMENT<br />The accepted solution is then deployed and maintained by us. If there are any defaults they are identified and rectified on a agreed upon time frame.<br /><ul><li>Bug Tracking
  29. 29. Maintenance
  30. 30. Updates
  31. 31. Data backups</li></ul>Product<br />
  32. 32. Continuous Improvement<br />In today's competitive world Ideas become obsolete very fast, so like your Ideas keep evolving so will our solutions. <br />IMPROVEMENT<br /><ul><li>New processes
  33. 33. Updates to the existing procedure
  34. 34. New modules
  35. 35. Enhancement of UI
  36. 36. Improvement of the efficiency</li></ul>Product<br />
  37. 37. C2D Projects Implemented/On-going<br />Loan Processing System<br />Content Management system<br />Express Delivery System<br />Credit Rating System<br />Group Life and Travel Insurance System<br />Warehouse Management System<br />Transportation Management System<br />Customer Relationship Management<br />Market Place and Neutral Exchanges<br />
  38. 38. Thank you<br />

×