Product Work LogName___DominicPaione________________________________________Date ________________Product ___Restoration of...
Date/Time: 9/12/2011   Activity :Worked on saxophone.      Comment/Suggestions:4:00-6:30 (PM)                       Commen...
Date/Time: 9/13/2011   Activity :Worked on saxophone.        Comment/Suggestions:4:00-6:30 (PM)                       Comm...
Date/Time: 9/20/2011   Activity :Worked on saxophone.         Comment/Suggestions:4:00-6:30 (PM)                       Com...
Date/Time: 10/5/2011   Activity : met with project facilitator   Comment/Suggestions:4:00-5:30 (PM)                       ...
Date/Time: 10/6/2011   Activity : Worked on saxophone     Comment/Suggestions:4:00-6:00 (PM)                       Comment...
Date/Time: 10/7/2011   Activity : Worked on saxophone      Comment/Suggestions:4:00-6:00 (PM)                       Commen...
Date/Time: 2/13/2012   Activity : Worked on saxophone      Comment/Suggestions:4:30-6:00 (PM)                       Commen...
Date/Time: 3/6/2012   Activity : Worked on saxophone   Comment/Suggestions:4:30-6:00 (PM)                      Commentary:...
Upcoming SlideShare
Loading in...5
×

Product Work Log

72

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
72
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Product Work Log

  1. 1. Product Work LogName___DominicPaione________________________________________Date ________________Product ___Restoration of vintage saxophone_________________________________________Date/Time: 9/7/2011 Activity :Met with project facilitator Comment/Suggestions:4:00-5:30 (PM) Commentary: learned how to strip down saxophone and repad using alcohol lamp.
  2. 2. Date/Time: 9/12/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: Stripped down the saxophone, made and alcohol lamp, removed old pads.
  3. 3. Date/Time: 9/13/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: Put new pads on, removed old cork, reassembled lower stack.
  4. 4. Date/Time: 9/20/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: reassembled upper stack, replaced cork on neck piece.
  5. 5. Date/Time: 10/5/2011 Activity : met with project facilitator Comment/Suggestions:4:00-5:30 (PM) Commentary: discussed how to detect and fix leaks on new pads.
  6. 6. Date/Time: 10/6/2011 Activity : Worked on saxophone Comment/Suggestions:4:00-6:00 (PM) Commentary: fixed leaks on upper stack pads.
  7. 7. Date/Time: 10/7/2011 Activity : Worked on saxophone Comment/Suggestions:4:00-6:00 (PM) Commentary: fixed leaks on lower stack pads. Replaced cork on neck piece.
  8. 8. Date/Time: 2/13/2012 Activity : Worked on saxophone Comment/Suggestions:4:30-6:00 (PM) Commentary: stripped down saxophone, chemical cleaned horn.
  9. 9. Date/Time: 3/6/2012 Activity : Worked on saxophone Comment/Suggestions:4:30-6:00 (PM) Commentary: polished and reassembled saxophone.

×