Your SlideShare is downloading. ×
Product Work Log
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Product Work Log

63
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
63
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Product Work LogName___DominicPaione________________________________________Date ________________Product ___Restoration of vintage saxophone_________________________________________Date/Time: 9/7/2011 Activity :Met with project facilitator Comment/Suggestions:4:00-5:30 (PM) Commentary: learned how to strip down saxophone and repad using alcohol lamp.
  • 2. Date/Time: 9/12/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: Stripped down the saxophone, made and alcohol lamp, removed old pads.
  • 3. Date/Time: 9/13/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: Put new pads on, removed old cork, reassembled lower stack.
  • 4. Date/Time: 9/20/2011 Activity :Worked on saxophone. Comment/Suggestions:4:00-6:30 (PM) Commentary: reassembled upper stack, replaced cork on neck piece.
  • 5. Date/Time: 10/5/2011 Activity : met with project facilitator Comment/Suggestions:4:00-5:30 (PM) Commentary: discussed how to detect and fix leaks on new pads.
  • 6. Date/Time: 10/6/2011 Activity : Worked on saxophone Comment/Suggestions:4:00-6:00 (PM) Commentary: fixed leaks on upper stack pads.
  • 7. Date/Time: 10/7/2011 Activity : Worked on saxophone Comment/Suggestions:4:00-6:00 (PM) Commentary: fixed leaks on lower stack pads. Replaced cork on neck piece.
  • 8. Date/Time: 2/13/2012 Activity : Worked on saxophone Comment/Suggestions:4:30-6:00 (PM) Commentary: stripped down saxophone, chemical cleaned horn.
  • 9. Date/Time: 3/6/2012 Activity : Worked on saxophone Comment/Suggestions:4:30-6:00 (PM) Commentary: polished and reassembled saxophone.