Pra The Lake District-Kondhwa Pune Progress Photographs Aug-2012

1,490 views
1,284 views

Published on

PRA Realty is builders from Pune. The Lake District is project by PRA. Here is working progress report of Lake district on August 2012

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,490
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Pra The Lake District-Kondhwa Pune Progress Photographs Aug-2012

  1. 1. Progress Photographs August - 2012 Phase 1 Th L k District Ph 1- The Lake Di t i t
  2. 2. A1 Building B ildiOHT and column above terrace floor slab for Block work at 10th floor level completed and 11th parapet wall in progress floor level in progress Progress Photographs – The Lake District Phase 1 2
  3. 3. A2 Building B ildiBlock work completed Block and plastering work completed Progress Photographs – The Lake District Phase 1 3
  4. 4. A2 Building B ildiSample flat Living room Sample flat Bed room 1 Progress Photographs – The Lake District Phase 1 4
  5. 5. A2 Building B ildiSample flat kitchen Sample Flat Deck Area Progress Photographs – The Lake District Phase 1 5
  6. 6. B1 Building B ildiTerrace slab completed Block work at 5th floor level in progress Progress Photographs – The Lake District Phase 1 6
  7. 7. A1 And B1 Building A d B ildiA1 Bldg. OHT work in progress and B1 Bldg. Terrace Slab Completed Progress Photographs – The Lake District Phase 1 7
  8. 8. C1 & C2 Building B ildiC1 Building Terrace slab Completed C2 Building OHT work in progress Progress Photographs – The Lake District Phase 1 8
  9. 9. C3 Building B ildiC3 Block work completed Progress Photographs – The Lake District Phase 1 9
  10. 10. D1 B ildi Building11th floor slab completed Progress Photographs – The Lake District Phase 1 10
  11. 11. A3 Building B ildi7th floor slab completed and column above 7th floor Block work up to 5th floor level completed and 6th slab in progress floor level in progress Progress Photographs – The Lake District Phase 1 11
  12. 12. C4 Building B ildiUpper stilt floor completed and 1st floor reinforcement and shuttering work in progress Progress Photographs – The Lake District Phase 1 12
  13. 13. D2 B ildi BuildingPlinth Completed UGT work and column for upper stilt slab in progress Progress Photographs – The Lake District Phase 1 13
  14. 14. Retaining wall R t i i llRetaining wall beside A1 Bldg. for podium level in Podium slab shuttering work behind A1 Bldg. in progress progress Progress Photographs – The Lake District Phase 1 14
  15. 15. Road Work R dW k300 to 400 Chain age 400 to 700 Chain age Progress Photographs – The Lake District Phase 1 15

×