PICTORIAL PRESENTATION OF FIRSTSTAGE VISIT OF INDEPENDENTSUPERVISORLAGOS STATEINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICT...
18/12/12: The headquarters of the LCDA in Ikeja LG where theMDGs-CGS projects are locatedINDEPENDENT SUPERVISOR FIRST ROUN...
18/12/12, at the chairman’s office in Onigbongbo LCDA in Ikeja LG, L-R: Mr Padonu(Council Engineer), Dr. Oyeyemi (Independ...
INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at CommunityPrimary School Wasinmi, Ikeja (LG/IK/044)....
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms atCommunity Primary School Wasinmi, Ikeja (LG/IK/044)....
18/12/12. Renovation of a 2-storey block at Central Primaryschool Ikeja (LG/IK/043): old window frames removedINDEPENDENT ...
18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja(LG/IK/043): The Council Engineer (Mr. Padonu) dis...
INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC(LG/IK/057). Old roof removedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICT...
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC(LG/IK/057). Old roof removedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICT...
INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombohealth post with water source & water treatment p...
19/12/12. Work in progress: Construction of laboratory facility at Ogombo healthpost with water source & water treatment p...
19/12/12. Work in progress: Construction of laboratory facility at Ogombohealth post with water source & water treatment p...
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Barr Mukandasi Ogidan (LCDAChairman), Dr. Oyeyemi (Consultant), Mrs. Rosij...
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Mr. Douglas(TA), Dr. Oyeyemi (Consultant), Mr. Adeleye (Council Engineer)I...
Upcoming SlideShare
Loading in...5
×

Lagos 1 pictorial presentation of first stage visit of independent

220

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
220
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Lagos 1 pictorial presentation of first stage visit of independent"

  1. 1. PICTORIAL PRESENTATION OF FIRSTSTAGE VISIT OF INDEPENDENTSUPERVISORLAGOS STATEINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  2. 2. 18/12/12: The headquarters of the LCDA in Ikeja LG where theMDGs-CGS projects are locatedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  3. 3. 18/12/12, at the chairman’s office in Onigbongbo LCDA in Ikeja LG, L-R: Mr Padonu(Council Engineer), Dr. Oyeyemi (Independent Consultant), Mr. Toviho (TA), Hon WaleOdunlami (LCDA Chairman)INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  4. 4. INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  5. 5. 18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at CommunityPrimary School Wasinmi, Ikeja (LG/IK/044). Old roof removed, old wall beingdemolishedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  6. 6. 18/12/12: Work in progress, Rehabilitation of 1 block of classrooms atCommunity Primary School Wasinmi, Ikeja (LG/IK/044). Hard core for thenew wallINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  7. 7. 18/12/12. Renovation of a 2-storey block at Central Primaryschool Ikeja (LG/IK/043): old window frames removedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  8. 8. 18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja(LG/IK/043): The Council Engineer (Mr. Padonu) discussing with the foremanINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  9. 9. INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  10. 10. 18/12/12. Rehabilitation of Beko-Ransome Kuti PHC(LG/IK/057). Old roof removedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  11. 11. 18/12/12. Rehabilitation of Beko-Ransome Kuti PHC(LG/IK/057). Old roof removedINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  12. 12. INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  13. 13. INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  14. 14. 19/12/12. Work in progress: Construction of laboratory facility at Ogombohealth post with water source & water treatment plant (LG/EO/004).Construction at DPC substructure/ DPC levelINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  15. 15. 19/12/12. Work in progress: Construction of laboratory facility at Ogombo healthpost with water source & water treatment plant (LG/EO/004). Construction at DPCsubstructure/ DPC levelINDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  16. 16. 19/12/12. Work in progress: Construction of laboratory facility at Ogombohealth post with water source & water treatment plant (LG/EO/004). Hardcore for the water treatment plant.INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  17. 17. 20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Barr Mukandasi Ogidan (LCDAChairman), Dr. Oyeyemi (Consultant), Mrs. Rosiji (Council Manager/LG contact), Mr.Douglas (TA)INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  18. 18. 20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Mr. Douglas(TA), Dr. Oyeyemi (Consultant), Mr. Adeleye (Council Engineer)INDEPENDENT SUPERVISOR FIRST ROUNDVISIT PICTURES
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×