Your SlideShare is downloading. ×
0
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Delta  pictorial presentation of some projects
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Delta pictorial presentation of some projects

36

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
36
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Pictorial presentation of someprojectsDelta StateINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS 1
  • 2. DTEW18 CONST OF STAFF QARTERS ATPHC OTEFEINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS2
  • 3. DTEW18 STAFF QTRS AT PHC OTEFEINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS3
  • 4. DTUK23 A BLOCK OF 3 CLASSROOMSAT UKWUOLE PRY SCH OBI KWOLEINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS4
  • 5. DTUK29 SOLAR POWER WATERSCHEME AT ELITE PRY SCH OBI OBETIINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS5
  • 6. DTUK31 CONSTRUCTION OF SOLARPOWER WATER SCHEME AT OBIOMAPRY SCH OWAH ABBIINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS6
  • 7. DTUK32 CONSTRCTION OF SOLARPOWER WATER SCHEME ATUMUKWATA PRY SCH OBINOMBAINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS7
  • 8. DTUK36 STAFF QTERS AT PHC OBIOBETIINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS8
  • 9. DTUK39 STAFF QTRS AT PHCUMUKWATAINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS9
  • 10. DTUK42 SOLAR POWER WATERSCHEME AT PHC EBEDEI NOINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS10
  • 11. DTUK42 SOLAR POWER WATERSCHEME AY PHC EBEDEI UNOINDEPENDENT PERFORMANCEMANAGEMENT OF 2011 CGS TO LOCALGOVERNMENT INTERVENTIONS11

×