Benue pictures 2
Upcoming SlideShare
Loading in...5
×
 

Benue pictures 2

on

  • 73 views

 

Statistics

Views

Total Views
73
Views on SlideShare
73
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Benue pictures 2 Benue pictures 2 Presentation Transcript

  • 2011 MDG-CGS PICTURESBENUE STATE2ND STAGE(GWER – WEST)INDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS1
  • BN/GW/029Primary Health Care Centre, Enger-Tongov, underconstructionINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS2
  • BN/GW/015Construction of 1 block of 3 classrooms plus officein Ahula primary school , AhulaINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS3
  • BN/GW/018Construction of 1 block of 3 classrooms at LGAPrimary School, Atwerga, at roofing stage with woodnogging in placeINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS4
  • BN/GW/016Construction of 1 block of 3 classrooms atMbaikyu primary school at roofing stageINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS5
  • BN/GW/031PHC Orawe nearing completionINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS6
  • BN/GW/013Construction of 1 block of 3 classrooms and office atPrimary school Gbabi, at Lintel stageINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS7
  • 2011MDG CGSLOGO LOCAL GOVERNMENTINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS8
  • BN/LO/046Completed 3 class room block at LGA primarySchool , UwevINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS9
  • BN/LO/050Hand-driven borehole at LGA pri. Sch. Uzer,completed and in useINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS10
  • Ambulances, procured, branded and in useBN/LO/067Ambulance Isaiah Tingir Memorial Clinic,AnyiinBN/LO/066Ambulance at CHC UgbaINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS11
  • BN/LO/055AUpgrading, LGHC Ayilamo, completed, awaitingbranding and handoverINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS12
  • BN/LO/0062-65Drugs and medical supplies procured and centrallystored at CHC Ugba pending the completion of theother health sentresINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS13
  • Drugs and hospital beds supplied 100%BN/LO/062-65BN/LO/0062-65INDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS14
  • BN/LO/069Motorized borehole installed at NKST pri. Sch.Tyobam; completed , branded and in useINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS15
  • BN/LO/044Block of 3 class rooms at LGA primary SchoolAshangu, completed and brandedINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS16
  • 2011 MDG-CGS ADO LOCALGOVERNMENTINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS17
  • BN/AD/008Branded ambulanceINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS18
  • BN/AD/006DPHC at Ikpomolokpo in Ado LGA under renovationINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS19
  • BN/AD/007Procured drugs in storage (and in use )at theLocal Government Central Store at Igumale in Ado LGAINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS20
  • BN/AD/001Branded exercise books kept in the Central Store atIgumale in Ado LGAINDEPENDENT PERFORMANCE MGT OF2011 CGS - LG INTERVENTIONS21