USGS Numerical Models-Drost and others, 1999-Johnson and others, 2011
Aquifers and Aquitards
GW and SWMovement
Water Budget
Proposed Time Line
The estimated project cost is $900,000 over five fiscal years(FY 2014-2018). All project costs would be shared by theUSGS ...
USGS Model ReportsDrost, B.W., Ely, D.M., and Lum II, W.E., 1999, Conceptual model and numericalsimulation of the ground-w...
Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal
Upcoming SlideShare
Loading in …5
×

Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

277 views

Published on

Presentation Given By: Mark Savoca, USGS Hydrologist

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
277
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Characterization and Numerical Simulation of the Water Resources in the Nisqually River Watershed: Project Proposal

  1. 1. USGS Numerical Models-Drost and others, 1999-Johnson and others, 2011
  2. 2. Aquifers and Aquitards
  3. 3. GW and SWMovement
  4. 4. Water Budget
  5. 5. Proposed Time Line
  6. 6. The estimated project cost is $900,000 over five fiscal years(FY 2014-2018). All project costs would be shared by theUSGS (40%) and the project partners (60%). Agency FY2014 FY2015 FY2016 FY2017 FY2018 USGS $64,000 $80,000 $88,000 $88,000 $40,000 Project Partners $96,000 $120,000 $112,000 $112,000 $60,000 Total $160,000 $200,000 $220,000 $220,000 $100,000
  7. 7. USGS Model ReportsDrost, B.W., Ely, D.M., and Lum II, W.E., 1999, Conceptual model and numericalsimulation of the ground-water-flow system in the unconsolidated sediments ofThurston County, Washington: U.S. Geological Survey Water-ResourcesInvestigations Report 99-4165, 254 p.Johnson, K.H., Savoca, M.E., and Clothier, Burt, 2011, Numerical simulation ofthe groundwater-flow system in the Chambers-Clover Creek Watershed andVicinity, Pierce County, Washington: U.S. Geological Survey ScientificInvestigations Report 2011–5086, 108 p. Mark Savoca mesavoca@usgs.gov http://wa.water.usgs.gov/

×