MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
1
Assignment 2
Prepare an outline specification for an LNG
plant located at Vasilikos, Cyprus
Authors: Supervisor:
Nikolaos G. Felessakis Dr Richard J Barnes
(8653)
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
2
	
  
Introduction	
  .............................................................................................................................................	
  4	
  
1.	
   LNG	
  plant	
  process	
  and	
  capacity	
  .................................................................................................	
  5	
  
1.1	
   Introduction	
  to	
  LNG	
  processing	
  .........................................................................................	
  5	
  
1.2	
   Feed	
  Gas	
  Processing	
  ...............................................................................................................	
  7	
  
1.2.1	
   Inlet	
  Separation	
  and	
  Treatment	
  System	
  ..................................................................................	
  7	
  
1.2.2	
   Acid	
  Gas	
  Removal	
  System	
  ..............................................................................................................	
  8	
  
1.2.2.1	
   Acid	
  Gas	
  Removal	
  .....................................................................................................................................	
  8	
  
1.2.3	
   Dehydration	
  System	
  .........................................................................................................................	
  8	
  
1.2.4	
   Mercury	
  Removal	
  System	
  ..............................................................................................................	
  9	
  
1.3	
   Liquefaction	
  ..............................................................................................................................	
  9	
  
1.3.1	
   Liquefaction	
  System	
  .........................................................................................................................	
  9	
  
1.3.2	
   Refrigeration	
  System	
  ....................................................................................................................	
  10	
  
1.4	
   Sources	
  of	
  gas,	
  design	
  rate	
  and	
  project	
  life	
  ..................................................................	
  10	
  
2.	
   Pipeline	
  connection	
  .....................................................................................................................	
  12	
  
2.1	
   Pipeline	
  Technical	
  Characteristics	
  .................................................................................	
  12	
  
2.2	
   Coatings	
  ....................................................................................................................................	
  13	
  
2.3	
   Pipeline	
  calculations	
  ............................................................................................................	
  13	
  
2.3.1	
   Outlet	
  pressure	
  ................................................................................................................................	
  13	
  
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
3
2.3.2	
   Wall	
  thickness	
  ..................................................................................................................................	
  14	
  
3.	
   LNG	
  export	
  facilities	
  and	
  loading	
  frequency	
  .......................................................................	
  16	
  
3.1	
   LNG	
  Jetty	
  Type	
  ........................................................................................................................	
  16	
  
3.2	
   The	
  loading	
  arms	
  ..................................................................................................................	
  17	
  
3.2.1	
   LNG	
  serve	
  and	
  uploading	
  time	
  .................................................................................................	
  17	
  
4.	
   LNG	
  storage	
  tank	
  size,	
  type	
  and	
  quantity	
  .............................................................................	
  18	
  
5.	
   Bibliography	
  ..................................................................................................................................	
  20	
  
TABLE	
  1.4-­‐1PRODUCTION	
  VOLUME	
  RELATED	
  WITH	
  RESOURCES	
  AND	
  THE	
  SIZE	
  OF	
  THE	
  LNG	
  PLANT	
  ...............................	
  11	
  
TABLE	
  2.3-­‐1	
  Q	
  FLOW	
  RATE	
  CALCULATIONS	
  .................................................................................................................................	
  14	
  
TABLE	
  2.3-­‐2	
  PIPE	
  OUTLET	
  WALL	
  THICKNESS	
  ..............................................................................................................................	
  15	
  
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
4
Introduction
This project aims to describe the outline of Liquefied natural gas (LNG) plant in
Vasilikos area from the potential reserves of the Aphrodite field.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
5
1. LNG plant process and capacity
The natural gas is inherently a domestic product. As gas, the hydrocarbon must
be transported by pipeline, which reduces the number of recipients. Liquefied
Natural Gas (LNG) was developed in 1964 as a solution to this problem. That
solution entails the following: LNG gas is being liquefied and transported
internationally via tankers and then regasified into its original state for distribution
and sale1.
1.1 Introduction to LNG processing
There is no typical or standard LNG plant. The major elements that are found in
most LNG plants include:
− Feed gas Processing
• Inlet Separation and treatment
• Acid gas removal
• Dehydration and Mercury removal
− Liquefaction
• Refrigeration System
− Fractionation
− Plant Utilities
• Hot Oil System
− Storage
The LNG Plant will receive gas from the LNG Project Gas Pipeline, treat it and then
liquefy it using refrigerants. Figure 1-1 illustrates the simplified process flow
diagram for the plant.
1 http://www.rigzone.com/training/insight.asp?i_id=322
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
6
Figure 1-2 Simplified process flow diagram for the plant.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
7
Specifically, the LNG Plant will:
• Heat the incoming gas from the pipeline,
• Reduce its pressure, and remove any liquids entrained with the gas,
• Remove acid gas, residual moisture and mercury,
• Liquefy the feed gas and
• Fractionate the hydrocarbon liquids produced during the liquefaction
process into condensate (pentane and heavier hydrocarbons) for export.
1.2 Feed Gas Processing
1.2.1 Inlet Separation and Treatment System
The inlet facilities at the LNG Plant will receive a single-phase gas from the
Pipeline network at a pressure of 6,750 kPag and a temperature of 30°C. The gas
will have been conditioned to a water and hydrocarbon dew point of 5°C at the
Hides Gas Conditioning Plant (Exxon Mobil, 2013)
The hot oil system will heat the gas to prevent hydrate formation and to meet the
amine absorber feed gas temperature requirement. The warmed gas will be
depressurized and flow to the inlet feed gas separator, which will remove small
liquid slugs. The inlet liquids separator will receive these liquids (if present) and
send the hydrocarbons to fractionation for processing into condensate. The
produced water stream will be sent to the wastewater treatment system for
disposal.
Feed gas from the inlet feed gas separator will be metered ahead of final
treatment before liquefaction to remove acid gas, residual water and traces of
mercury.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
8
1.2.2 Acid Gas Removal System
Impurities in a gas stream, such as hydrogen sulfide and carbon dioxide, are
collectively referred to as acid gases. The acid gas as the carbon dioxide, it can
be freeze at cryogenic liquefaction temperatures and thereby block the natural
gas flow path. An amine solvent (amine mixed with water) will be used to remove
acid gas, as follows(idid).
1.2.2.1 Acid Gas Removal
Feed gas warmed to approximately 35°C from the metering station enters the
bottom of the amine absorber. The amine solvent enters the absorber near the
top and flows counter-current against the gas being treated, so that the freshest
solvent contacts the cleanest gas first. The solvent progressively absorbs the acid
gases and exits the bottom of the amine absorber.
The treated feed gas then flows from the top of the amine absorber to the
dehydration system. Sweetened gas can also be used as high pressure start-up
fuel gas(idid).
1.2.3 Dehydration System
The gas leaving the acid gas removal system will be saturated with water. The
dehydration system will dry the gas down to less than 0.1 ppm(v) of water to
prevent ice (hydrates) forming in the downstream cryogenic equipment. A
propane refrigerant cools the feed gas to 25°C and condenses most of the water
vapor. The dehydration feed separator returns the condensed water and solvent
carryover to the acid gas removal system as make-up.
Regeneration will be achieved with a gas stream. This regeneration gas will be
heated by the hot oil system to approximately 230°C. When a bed is
regenerating, the hot regeneration gas stream enters at the bottom of the drier
and exits at the top. The water released during regeneration will normally be
directed to the wastewater treatment system or used as make-up water for the
acid gas removal system(idid).
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
9
1.2.4 Mercury Removal System
Elemental mercury corrodes aluminium, and even very low traces must be
removed to prevent damage to the cryogenic heat exchangers. The mercury
removal system will pass gas from the dehydration system through an absorber of
non-regenerative, sulfur-impregnated, activated carbon, which will chemically fix
elemental mercury as a non-volatile mercury sulfide.
After this procedure the mercury levels in the feed gas are so low that the
adsorbent may not need to be replaced during the life of the project(idid).
1.3 Liquefaction
Liquefaction uses the feed gas to below the methane boiling point of around -
161°C. At this temperature, the gas liquefies to 1/600th of its original volume.
1.3.1 Liquefaction System
The liquefaction system in an LNG train comprises propane coolers, a heavy-
hydrocarbon removal column, and cryogenic heat exchangers. Propane coolers
will cool the feed gas from the mercury removal system. The coolers liquefy the
heavier hydrocarbons, which then flow to a heavy-hydrocarbon removal
column. Heat and pressure will be used to separate the heavier hydrocarbons
from the feed gas stream in the column. These heavier hydrocarbons (ethane,
propane, butane and heavier components) will exit the bottom of the column.
The vapors will exit the top of the column and flow to the main cryogenic heat
exchanger.
The LNG will be produced at approximately 800 t/hr. The flashing process loses
some of the LNG as a vapor, which will be warmed and then compressed. Some
of this gas will be used to regenerate the molecular sieve driers in the
dehydration system before being sent to the high-pressure fuel gas system.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
10
The LNG from the liquefaction system will be pumped to the LNG storage tanks
(idid).
1.3.2 Refrigeration System
The refrigeration system cools and pressurises the refrigerants used in the
liquefaction system. The refrigeration system will use closed-loop, refrigerant
circuits to provide the low-temperature refrigerants. The refrigerants will be used
to liquefy and sub-cool the feed gas in the cryogenic heat exchangers(idid).
1.4 Sources of gas, design rate and project life
The natural gas discovery in Cyprus Block 12 has estimated gross mean resources
of 5 trillion cubic feet (Tcf)2. Furthermore the available gas will depend first on
how much is used for domestic consumption.
𝐺𝑎𝑠  𝑁𝑒𝑒𝑑𝑒𝑑   =
𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑃𝑜𝑤𝑒𝑟
𝐻𝑒𝑎𝑡𝑖𝑛𝑔  𝑣𝑎𝑙𝑢𝑒  𝑥  𝐶𝑦𝑐𝑙𝑒  𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
Production	
  Power	
  (MWh)3
	
   3000000	
  
Heating	
  value	
  (MJ/ m3)4
	
   39.2	
  
Cycle	
  efficiency	
  (%)5
	
   37.5	
  
𝐺𝑎𝑠  𝑁𝑒𝑒𝑑𝑒𝑑   =   0,7578  𝑥  10!
𝑚!
𝑦
That means 19 bcm will be used from 2019 until 2044. This reduces the amount of
gas available from 141,5 bcm6 to 122,5 bcm.
2 Source: http://www.nobleenergyinc.com/exploration/recent-discoveries-130.html
3 http://www.dsm.org.cy/nqcontent.cfm?a_id=2741&tt=graphic&startdt=20%2F05%2F2010&type=15&submit=Go
4 Courses Material Barns 2014
5 http://www.eac.com.cy/EN/Pages/Home.aspx
6 http://www.convertunits.com/from/trillion+cubic+feet/to/billion+cubic+metre
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
11
Field Reserves Tcf 5
Life of LNG plant years 25
Liquefaction efficiency 0.85
1 m3 of LNG 609 m3 of NG produce
mtpa to million m3 x 0,46
Table 1.4-1Production Volume related with resources and the size of the LNG plant
[((7,062– 0,7578) x 109 (m3/y)) x 0,85] / 609 = 8,8 x 106 (m3/year) x 0,46 = 4mtpa
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
12
2. Pipeline connection
Another major part of the LNG procedure is the feed process from the reserve to
the LNG plant through the pipeline connection. The offshore pipeline
construction is related with the environment parameters of the geographical
position of the reserve. This parameters are the distance between reserve and
LNG plant, the sea depth that is related with the pressure, and the temperature.
This parameters define the characteristics of the pipeline such as the Diameter,
in/out wall thickness and the material.
2.1 Pipeline Technical Characteristics
The Aphrodite-Vasilikos pipeline connection has an offshore distance
approximately 200km in 2000m sea depth. These conditions are similar with the
‘Blue Stream’ that provide a conduit for export of Russian gas directly to Turkey
with an offshore distance up to 398 km and 2150 m sea depth7.
Because of this similarity we can assume that we can use the same pipeline data
such as:
− Diameter: 24inc (=609.6 mm)
− Pressure: 250 bar in a sea depth of 2150m
− Temperature: -10ºC to +55ºC
− 32 mm wall thickness
− Flow rate ~ 2.5m/s and
− Material type carbon steel with outer coating of concrete (Shell, 2010).
7 sources: Natural gas prices from index. mundi; LNG prices from Reuters; pipeline costs from Pete Wallace,
Tractebel Engineering; LNG plant cost from Minister Sylikiotis; distances from Block 12 to Vassiliko from DEFA;
distance from Cyprus to Greece from DEPA; pipeline depth to Greece from Quantum Energy figures on
electricity cable.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
13
2.2 Coatings
Probably, the best choice for the anti-corrosion coating is application used in the
Blue Stream. After several tests the best solution for pipeline protection in the
extreme environment of 2000m underwater depth is a three layer polypropylene
coating consisting of a first layer of fusion bonded epoxy, a second layer of
polypropylene adhesive and an outer layer of polypropylene.
2.3 Pipeline calculations
2.3.1 Outlet pressure
Regarding the size of pipeline that brings the NG to shore, several factors should
be taken into account. To calculate the size of the pipe the AGA Equation
measuring a pipe’s pressure was used:
For the estimation of the pipeline size we did not have the necessary information
for the several factors and thus, it was based on the following assumption:
5(TCF) / [25(years) x 365(days)] = 547,945.21 (SCFD)
[547,945.21 (SCFD) x 365(days) x 35,314] / 1000 = 7,062,800,000 (S m3/year)
Q = 7,062,800,000( S m3) / 365days) = 19,350,136.99 m3 /day
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
14
Q flow rate at base conditions (m3/day) 19,350,136.99 Calculated
Ts: standard temperature (K) 288.9
Curse Material
Dr Richard J
Barnes 2014
Ps: standard pressure (kPa(a)) 101.56
E: pipeline efficiency 1
ε: pipe roughness (mm) 0.004
T: average flowing temperature (K) 303
Z: Compressibility factor 0.93
d: pipe internal diameter (mm) 711.2 Sources from
the Snohviti
offshore fields
until the
Hammerfest
LNG plant
P1: inlet pressure (kPa(g)) 15,000
γ: gas specific gravity 0.7341
P2: outlet pressure (kPa(g)) 909,651,183 Calculated
L: pipeline length (m) 184000 Reserve Data
Table 2.3-1 Q flow rate calculations
The Outlet pressure is 9096,51183 kPa (=90,96 bar)
2.3.2 Wall thickness
The wall thickness is given from the following equation :
𝑇𝑚 =
𝑃𝑑𝑜
2𝑆𝐹𝐸𝑇
+ 𝑇𝑐
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
15
Tm: wall thickness (mm) 31.98315974
P: Design pressure ((kPa(g)) 17000
Under water Pressure at
1689m
do: outside diameter (mm) 609.6 From DEPA
S: minimum yield strength (kPa) 248305.11
http://www.hse.gov.uk/r
esearch/rrpdf/rr105.pdf
F: Construction type design factor 0.72
Courses Material Barnes
2014
E: Longitudinal joint factor 1
T: temperature rating (1,0) 1
Tc: corrosion allowance (mm) 3
Table 2.3-2 Pipe outlet wall thickness
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
16
3. LNG export facilities and loading frequency
For designing the export facilities the size of the LNG fleet should be considered.
According to the PFC energy
global Services the 62% of the
LNG vessel until 2012 has an
average capacity of 138.000
bcm. Designing the LNG
Storage of Vasilikos with
180.000 bcm will be able to
serve the 81% of the LNG
fleet. Furthermore, it is
reasonable to construct two
storage tank getting the advantage of loading one tank from the liquefaction
process and the same time unloading a LNG vessel from the other tank.
Considering the above two tanks with total capacity of 360.000 bcm are able to
serve even the bigger LNG vessel with 260.000 bcm upload capacity.
3.1 LNG Jetty Type
The LNG Jetty connecting the LNG storage tanks
and condensate storage tanks with the LNG and
condensate export berths.
The Jetty stricture include:
− LNG loading and vapor return lines,
− Condensate loading lines,
− Utilities,
− Jetty head operations platform.
− A roadway capable of accommodating
trucks carrying heavy loads, ambulances,
small cranes, and pedestrian traffic.
Table 3-1 Global LNG Fleet by Capacity, 2012
Sources: PFC Energy Global LNG Service
Figure 3-1 LNG jetty
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
17
3.2 The loading arms
The jetty head will be fitted
with unloading arms to
connect the ships pipework to
the jetty pipework. The
loading arms typically consist
articulated pipe structures
that can be maneuvered to
allow the connection of the
ships loading/unloading
pipework to the shore jetty’s
pipelines structure.
The loading arms support and direct the vapor return or the loading lines. The two
liquid service loading arms and the dual-purpose liquids or vapor return loading
arm will assume a usual capacity of 5,000 m3/hour. The vapour return loading arm
will have a capacity of 20,350 m3/hr.
3.2.1 LNG serve and uploading time
We assume that an average LNG vessel capacity is 138.000m3. Eventually, only
one jetty is needed to serve a ship with a rate of 5,000 m3/hour and it needs 27,6
hours. If two arms are loading the vessel will be loaded in 13,8 hours.
Number of tanker that can be served per year related with the annual LNG
production are:
8,8 x 106 (m3/year) / 138.000 m3/ship ≅  64 LNG vessel per year
Figure 3.2-1 Al-Khuwair loading at gate LNG in Netherlands1
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
18
4. LNG storage tank size, type and quantity
The Vasilikos Energy Project proposes to store the LNG under cryogenic conditions
on site at slightly above atmospheric pressure by a system of pressure relief valves
set at 250 bar in double skinned 172,000 m3 LNG Tanks. The inner tank is
constructed of a nickel steel alloy and is designed to hold the LNG. The outer
tank constructed of
reinforced pre-
stressed concrete is
designed to hold the
liquid contents of the
tank in the event of a
leak. The 1m space
between the tanks is
filled with an
insulating material
designed to minimize
heat ingress into the tank. The tanks will be the largest structures on the site at 80
m in diameter and 45 meters high with a domed roofs and a number of valves
and fittings on the tank roof. LNG export pumps will be located within wells inside
the LNG tank. The tank’s concrete floor is likely to be provided with a heating
element in order to prevent water in the ground beneath the tank from freezing
and disturbing the tank foundations. Figure 3.9 below shows the typical tank
layout (Parsons Brinckerhoff Limited, Aeoliki Limited, 2006).
`Figure 4-1 Storage Tanks at Yemen LNG, Balhaf, Yemen1
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
19
Figure 4-2 Full Containment (Steel Roof) LNG Tank8
Tanks themselves will not need any external refrigeration sources as they are
cooled automatically using latent heat (the absorption of heat energy by the
evaporating gas) derived from the LNG boil off gas. The heat flux into the tanks
will be kept to a minimum by insulting both the tanks themselves and the
unloading lines through which the LNG is constantly circulated (ibid).
8 Source Global LNG Sales LNG Import Terminal Cost and Schedule Basics (Gerald Humphrey)
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
20
5. Bibliography
Unsupported source type (ElectronicSource) for source GUP.
Arms of innovation. 2014. [Film] France: dsp an endemol company.
BBCnews, 2013. "Shell's record-breaking Prelude takes to the water". [Online]
Available at:
https://web.archive.org/web/20131204184139/http://www.bbc.co.uk/news/tech
nology-25213845 [Accessed 04 December 2013].
Bergin, W. & Spearman, E., 2006. Vasilikos Energy Centre Basis of Design
Environmental Assessment. EA. Middlesex: Parsons Brinckerhoff Limited, Aeoliki
Limited.
Bp, 2013. con Fact. [Online] Available at: www.car.gr.
Briggs, et al., 2013. LNG LIQUEFACTION PLANT. In “Poten”, ed. MASTER PLAN OF
THE VASILIKOS AREA. NIcosia: “Poten” & "ALA". p.29.
Chartered , P., 1992. http://www.the-edi.co.uk/. [Online] (7th) Available at:
http://www.the-edi.co.uk/downloads/eia_spring_2007.pdf [Accessed 19 April
2007].
Exxon Mobil, 2013. [Online] Available at:
http://pnglng.com/downloads/eis_chapter04.pdf.
Delek Group, 2014. [Online] Available at:
http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0C
CsQFjAA&url=http%3A%2F%2Fphx.corporate-
ir.net%2FExternal.File%3Fitem%3DUGFyZW50SUQ9NTM5MDYxfENoaWxkSUQ9MjI4NT
kzfFR5cGU9MQ%3D%3D%26t%3D1&ei=0lduU-
WqMsG1PcS0gMgD&usg=AFQjCNGDcT79dYdH6cavDiXX5Q2neeM4tQ&bvm=bv.
66330100,d.ZWU [Accessed April 2014].
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
21
International Institute for Environment and Development (IIED) , n.d.
http://www.environmental-mainstreaming.org. [Online] Available at:
http://www.environmental-
mainstreaming.org/documents/EM%20Profile%20No%201%20-
%20EIA%20(6%20Oct%2009).pdf.
Kotzot, , Durr, , Coyle, & Caswell, , 2007. LNG LIQUEFACTION — NOT ALL PLANTS
ARE CREATED EQUAL. [Online] KBR Available at:
http://www.kbr.com/Newsroom/Publications/LNG/ [Accessed 2007].
National Centre for Risk Analysis and Options Appraisal Environment Agency,
2002. https://www.gov.uk/. [Online] Environment Agency Available at:
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file
/296952/geho0411btrf-e-e.pdf [Accessed 01 May 2002]. A handbook for scoping
projects.
Nobole Energy International, 2013. http://www.mcit.gov.cy. [Online] Available at:
http://www.mcit.gov.cy/mcit/mcit.nsf/All/11FFCD876C06B58CC2257C7700255D1
8/$file/04-Vasilikos%20Master%20Plan%202013_Executive%20Summary%20-
%20Eng.pdf [Accessed 1 Octomber 2013].
Managment, E.R., 2001. http://ec.europa.eu/. [Online] Available at:
http://ec.europa.eu/environment/eia/eia-guidelines/g-scoping-full-text.pdf
[Accessed 19 April 2014].
Paltsev, et al., 2013. Natural Gas Monetization Pathways for Cyprus. Economics of
Project Development Options. Massachusetts: Massachusetts Institute of
Technology MIT Energy Initiative, Massachusetts Institute of Technology, Cyprus
Institute.
Parsons Brinckerhoff Limited, Aeoliki Limited, 2006. VASILIKOS ENERGY CENTRE
BASIS OF DESIGN ENVIRONMENTAL ASSESSMENT. Middlesex: M.W. Kellogg Limited
Kellogg.
MOE 506 LNG Processing, Storage,
Transport, Re-gasification, Distribution and Usage
22
Shell, 2010. Transporting Oil and Gas, What’s in a Barrel of Oil?. [Online] Available
at: www.shell.us/alaska.
Shell, n.d. Prelude FLNG. [Online] Available at:
http://www.shell.com.au/aboutshell/who-we-are/shell-
au/operations/upstream/prelude.html [Accessed 2 May 2014].
Tsakiris, D.T., 2013. www.eliamep.gr/en. [Online] Available at:
http://www.eliamep.gr/wp-content/uploads/2014/02/policy-paper.pdf
[Accessed November 2013].
iSource about Shoviet reserve
http://www.ivt.ntnu.no/ept/fag/tep4215/innhold/LNG%20Conferences/20
07/fscommand/PS7_3_Skjerven_s.pdf

More Related Content

What's hot

PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)Vijay Sarathy
 
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...Ives Equipment
 
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...IRJET Journal
 
Aqib Rasheed Internship Report1
Aqib Rasheed Internship Report1Aqib Rasheed Internship Report1
Aqib Rasheed Internship Report1Aqib Rasheed
 
An Minh Tran - Cheg 407 - Case 1
An Minh Tran - Cheg 407 - Case 1An Minh Tran - Cheg 407 - Case 1
An Minh Tran - Cheg 407 - Case 1AN TRAN
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsLanphuong Pham
 
EURECAT sulfiding technologies
EURECAT sulfiding technologiesEURECAT sulfiding technologies
EURECAT sulfiding technologiesBCS LLC
 
Super conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysSuper conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysPrem Baboo
 
GT2PropulsionSystemSubmissionDocument
GT2PropulsionSystemSubmissionDocumentGT2PropulsionSystemSubmissionDocument
GT2PropulsionSystemSubmissionDocumentDiana Alsindy
 
Reverse rotaion of co2 compressor
Reverse rotaion of co2 compressorReverse rotaion of co2 compressor
Reverse rotaion of co2 compressorPrem Baboo
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsPrem Baboo
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1ameermudasar
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown inAkshay Kotkar
 
Methanol Plant Safety - A Historical Perspective
Methanol Plant Safety - A Historical PerspectiveMethanol Plant Safety - A Historical Perspective
Methanol Plant Safety - A Historical PerspectiveGerard B. Hawkins
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology bookPrem Baboo
 

What's hot (19)

PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
 
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...
Claus Sulfur Recovery Tail Gas Applying 100 Million Hours of Operational Time...
 
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
Heat Recovery System to Save the Fuel (Bagasse) by Eliminating the Feedwater ...
 
Sulfur Recovery BTX Destruction
Sulfur Recovery BTX DestructionSulfur Recovery BTX Destruction
Sulfur Recovery BTX Destruction
 
Aqib Rasheed Internship Report1
Aqib Rasheed Internship Report1Aqib Rasheed Internship Report1
Aqib Rasheed Internship Report1
 
tank
tanktank
tank
 
An Minh Tran - Cheg 407 - Case 1
An Minh Tran - Cheg 407 - Case 1An Minh Tran - Cheg 407 - Case 1
An Minh Tran - Cheg 407 - Case 1
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systems
 
EURECAT sulfiding technologies
EURECAT sulfiding technologiesEURECAT sulfiding technologies
EURECAT sulfiding technologies
 
Super conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysSuper conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency trays
 
GT2PropulsionSystemSubmissionDocument
GT2PropulsionSystemSubmissionDocumentGT2PropulsionSystemSubmissionDocument
GT2PropulsionSystemSubmissionDocument
 
Productos de sso
Productos de ssoProductos de sso
Productos de sso
 
Reverse rotaion of co2 compressor
Reverse rotaion of co2 compressorReverse rotaion of co2 compressor
Reverse rotaion of co2 compressor
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plants
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown in
 
Methanol Plant Safety - A Historical Perspective
Methanol Plant Safety - A Historical PerspectiveMethanol Plant Safety - A Historical Perspective
Methanol Plant Safety - A Historical Perspective
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology book
 

Similar to Assignment 2 Prepare an outline specification for an LNG plant located at Vasilikos, Cyprus

An alternative process for energy recovery and disposal of msw
An alternative process for energy recovery and disposal of mswAn alternative process for energy recovery and disposal of msw
An alternative process for energy recovery and disposal of mswZahid Latif
 
Department Of Chemical
Department Of ChemicalDepartment Of Chemical
Department Of ChemicalSamuel Essien
 
Method for removal of natural gas impurities
Method for removal of natural gas impuritiesMethod for removal of natural gas impurities
Method for removal of natural gas impuritiesRafay Arfin
 
Report Guddu Power Plant
Report Guddu Power PlantReport Guddu Power Plant
Report Guddu Power PlantMuhammad Ahmed
 
LNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfLNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfYusri881
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...Saikat Halder
 
Assignment 1 - Crude Oil Desalting Unit.pdf
Assignment 1 - Crude Oil Desalting Unit.pdfAssignment 1 - Crude Oil Desalting Unit.pdf
Assignment 1 - Crude Oil Desalting Unit.pdfSafeen Yaseen Ja'far
 
water treatment plant
water treatment plantwater treatment plant
water treatment plantVisheshPunia1
 
Simulation of Vinyl Acetate Production
Simulation of Vinyl Acetate ProductionSimulation of Vinyl Acetate Production
Simulation of Vinyl Acetate ProductionMehdi Aissani
 
Solar Thermal Collectors Applications
Solar Thermal Collectors ApplicationsSolar Thermal Collectors Applications
Solar Thermal Collectors ApplicationsH Janardan Prabhu
 
Grundfos chlorine dioxide cl o2- calculation-2
Grundfos  chlorine dioxide cl o2- calculation-2Grundfos  chlorine dioxide cl o2- calculation-2
Grundfos chlorine dioxide cl o2- calculation-2MohamedHusseinHamed
 
A Summer training report on thermal power plant
A Summer training report on thermal power plantA Summer training report on thermal power plant
A Summer training report on thermal power plantAman Singh
 
Quick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcuQuick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcuAhmed Abd ElKader
 
DelayedCokingPoster-022608LR
DelayedCokingPoster-022608LRDelayedCokingPoster-022608LR
DelayedCokingPoster-022608LRChris Jones
 
Sufg clean coal technologies report
Sufg clean coal technologies reportSufg clean coal technologies report
Sufg clean coal technologies reportDickdick Maulana
 
Basic hygrometry principles_english_2
Basic hygrometry principles_english_2Basic hygrometry principles_english_2
Basic hygrometry principles_english_2Gian Peroza
 
Armfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentArmfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentHadeer Khalid
 

Similar to Assignment 2 Prepare an outline specification for an LNG plant located at Vasilikos, Cyprus (20)

An alternative process for energy recovery and disposal of msw
An alternative process for energy recovery and disposal of mswAn alternative process for energy recovery and disposal of msw
An alternative process for energy recovery and disposal of msw
 
Department Of Chemical
Department Of ChemicalDepartment Of Chemical
Department Of Chemical
 
Method for removal of natural gas impurities
Method for removal of natural gas impuritiesMethod for removal of natural gas impurities
Method for removal of natural gas impurities
 
Report Guddu Power Plant
Report Guddu Power PlantReport Guddu Power Plant
Report Guddu Power Plant
 
LNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfLNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdf
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
 
Assignment 1 - Crude Oil Desalting Unit.pdf
Assignment 1 - Crude Oil Desalting Unit.pdfAssignment 1 - Crude Oil Desalting Unit.pdf
Assignment 1 - Crude Oil Desalting Unit.pdf
 
rac module.pdf
rac module.pdfrac module.pdf
rac module.pdf
 
water treatment plant
water treatment plantwater treatment plant
water treatment plant
 
Simulation of Vinyl Acetate Production
Simulation of Vinyl Acetate ProductionSimulation of Vinyl Acetate Production
Simulation of Vinyl Acetate Production
 
Solar Thermal Collectors Applications
Solar Thermal Collectors ApplicationsSolar Thermal Collectors Applications
Solar Thermal Collectors Applications
 
Solvay pocket manual
Solvay pocket manualSolvay pocket manual
Solvay pocket manual
 
Grundfos chlorine dioxide cl o2- calculation-2
Grundfos  chlorine dioxide cl o2- calculation-2Grundfos  chlorine dioxide cl o2- calculation-2
Grundfos chlorine dioxide cl o2- calculation-2
 
A Summer training report on thermal power plant
A Summer training report on thermal power plantA Summer training report on thermal power plant
A Summer training report on thermal power plant
 
Quick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcuQuick summary for delayed cokeing unit dcu
Quick summary for delayed cokeing unit dcu
 
DelayedCokingPoster-022608LR
DelayedCokingPoster-022608LRDelayedCokingPoster-022608LR
DelayedCokingPoster-022608LR
 
Petroleum industry
Petroleum industryPetroleum industry
Petroleum industry
 
Sufg clean coal technologies report
Sufg clean coal technologies reportSufg clean coal technologies report
Sufg clean coal technologies report
 
Basic hygrometry principles_english_2
Basic hygrometry principles_english_2Basic hygrometry principles_english_2
Basic hygrometry principles_english_2
 
Armfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentArmfield Gas Absorption Column Experiment
Armfield Gas Absorption Column Experiment
 

Assignment 2 Prepare an outline specification for an LNG plant located at Vasilikos, Cyprus

  • 1. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 1 Assignment 2 Prepare an outline specification for an LNG plant located at Vasilikos, Cyprus Authors: Supervisor: Nikolaos G. Felessakis Dr Richard J Barnes (8653)
  • 2. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 2   Introduction  .............................................................................................................................................  4   1.   LNG  plant  process  and  capacity  .................................................................................................  5   1.1   Introduction  to  LNG  processing  .........................................................................................  5   1.2   Feed  Gas  Processing  ...............................................................................................................  7   1.2.1   Inlet  Separation  and  Treatment  System  ..................................................................................  7   1.2.2   Acid  Gas  Removal  System  ..............................................................................................................  8   1.2.2.1   Acid  Gas  Removal  .....................................................................................................................................  8   1.2.3   Dehydration  System  .........................................................................................................................  8   1.2.4   Mercury  Removal  System  ..............................................................................................................  9   1.3   Liquefaction  ..............................................................................................................................  9   1.3.1   Liquefaction  System  .........................................................................................................................  9   1.3.2   Refrigeration  System  ....................................................................................................................  10   1.4   Sources  of  gas,  design  rate  and  project  life  ..................................................................  10   2.   Pipeline  connection  .....................................................................................................................  12   2.1   Pipeline  Technical  Characteristics  .................................................................................  12   2.2   Coatings  ....................................................................................................................................  13   2.3   Pipeline  calculations  ............................................................................................................  13   2.3.1   Outlet  pressure  ................................................................................................................................  13  
  • 3. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 3 2.3.2   Wall  thickness  ..................................................................................................................................  14   3.   LNG  export  facilities  and  loading  frequency  .......................................................................  16   3.1   LNG  Jetty  Type  ........................................................................................................................  16   3.2   The  loading  arms  ..................................................................................................................  17   3.2.1   LNG  serve  and  uploading  time  .................................................................................................  17   4.   LNG  storage  tank  size,  type  and  quantity  .............................................................................  18   5.   Bibliography  ..................................................................................................................................  20   TABLE  1.4-­‐1PRODUCTION  VOLUME  RELATED  WITH  RESOURCES  AND  THE  SIZE  OF  THE  LNG  PLANT  ...............................  11   TABLE  2.3-­‐1  Q  FLOW  RATE  CALCULATIONS  .................................................................................................................................  14   TABLE  2.3-­‐2  PIPE  OUTLET  WALL  THICKNESS  ..............................................................................................................................  15  
  • 4. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 4 Introduction This project aims to describe the outline of Liquefied natural gas (LNG) plant in Vasilikos area from the potential reserves of the Aphrodite field.
  • 5. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 5 1. LNG plant process and capacity The natural gas is inherently a domestic product. As gas, the hydrocarbon must be transported by pipeline, which reduces the number of recipients. Liquefied Natural Gas (LNG) was developed in 1964 as a solution to this problem. That solution entails the following: LNG gas is being liquefied and transported internationally via tankers and then regasified into its original state for distribution and sale1. 1.1 Introduction to LNG processing There is no typical or standard LNG plant. The major elements that are found in most LNG plants include: − Feed gas Processing • Inlet Separation and treatment • Acid gas removal • Dehydration and Mercury removal − Liquefaction • Refrigeration System − Fractionation − Plant Utilities • Hot Oil System − Storage The LNG Plant will receive gas from the LNG Project Gas Pipeline, treat it and then liquefy it using refrigerants. Figure 1-1 illustrates the simplified process flow diagram for the plant. 1 http://www.rigzone.com/training/insight.asp?i_id=322
  • 6. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 6 Figure 1-2 Simplified process flow diagram for the plant.
  • 7. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 7 Specifically, the LNG Plant will: • Heat the incoming gas from the pipeline, • Reduce its pressure, and remove any liquids entrained with the gas, • Remove acid gas, residual moisture and mercury, • Liquefy the feed gas and • Fractionate the hydrocarbon liquids produced during the liquefaction process into condensate (pentane and heavier hydrocarbons) for export. 1.2 Feed Gas Processing 1.2.1 Inlet Separation and Treatment System The inlet facilities at the LNG Plant will receive a single-phase gas from the Pipeline network at a pressure of 6,750 kPag and a temperature of 30°C. The gas will have been conditioned to a water and hydrocarbon dew point of 5°C at the Hides Gas Conditioning Plant (Exxon Mobil, 2013) The hot oil system will heat the gas to prevent hydrate formation and to meet the amine absorber feed gas temperature requirement. The warmed gas will be depressurized and flow to the inlet feed gas separator, which will remove small liquid slugs. The inlet liquids separator will receive these liquids (if present) and send the hydrocarbons to fractionation for processing into condensate. The produced water stream will be sent to the wastewater treatment system for disposal. Feed gas from the inlet feed gas separator will be metered ahead of final treatment before liquefaction to remove acid gas, residual water and traces of mercury.
  • 8. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 8 1.2.2 Acid Gas Removal System Impurities in a gas stream, such as hydrogen sulfide and carbon dioxide, are collectively referred to as acid gases. The acid gas as the carbon dioxide, it can be freeze at cryogenic liquefaction temperatures and thereby block the natural gas flow path. An amine solvent (amine mixed with water) will be used to remove acid gas, as follows(idid). 1.2.2.1 Acid Gas Removal Feed gas warmed to approximately 35°C from the metering station enters the bottom of the amine absorber. The amine solvent enters the absorber near the top and flows counter-current against the gas being treated, so that the freshest solvent contacts the cleanest gas first. The solvent progressively absorbs the acid gases and exits the bottom of the amine absorber. The treated feed gas then flows from the top of the amine absorber to the dehydration system. Sweetened gas can also be used as high pressure start-up fuel gas(idid). 1.2.3 Dehydration System The gas leaving the acid gas removal system will be saturated with water. The dehydration system will dry the gas down to less than 0.1 ppm(v) of water to prevent ice (hydrates) forming in the downstream cryogenic equipment. A propane refrigerant cools the feed gas to 25°C and condenses most of the water vapor. The dehydration feed separator returns the condensed water and solvent carryover to the acid gas removal system as make-up. Regeneration will be achieved with a gas stream. This regeneration gas will be heated by the hot oil system to approximately 230°C. When a bed is regenerating, the hot regeneration gas stream enters at the bottom of the drier and exits at the top. The water released during regeneration will normally be directed to the wastewater treatment system or used as make-up water for the acid gas removal system(idid).
  • 9. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 9 1.2.4 Mercury Removal System Elemental mercury corrodes aluminium, and even very low traces must be removed to prevent damage to the cryogenic heat exchangers. The mercury removal system will pass gas from the dehydration system through an absorber of non-regenerative, sulfur-impregnated, activated carbon, which will chemically fix elemental mercury as a non-volatile mercury sulfide. After this procedure the mercury levels in the feed gas are so low that the adsorbent may not need to be replaced during the life of the project(idid). 1.3 Liquefaction Liquefaction uses the feed gas to below the methane boiling point of around - 161°C. At this temperature, the gas liquefies to 1/600th of its original volume. 1.3.1 Liquefaction System The liquefaction system in an LNG train comprises propane coolers, a heavy- hydrocarbon removal column, and cryogenic heat exchangers. Propane coolers will cool the feed gas from the mercury removal system. The coolers liquefy the heavier hydrocarbons, which then flow to a heavy-hydrocarbon removal column. Heat and pressure will be used to separate the heavier hydrocarbons from the feed gas stream in the column. These heavier hydrocarbons (ethane, propane, butane and heavier components) will exit the bottom of the column. The vapors will exit the top of the column and flow to the main cryogenic heat exchanger. The LNG will be produced at approximately 800 t/hr. The flashing process loses some of the LNG as a vapor, which will be warmed and then compressed. Some of this gas will be used to regenerate the molecular sieve driers in the dehydration system before being sent to the high-pressure fuel gas system.
  • 10. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 10 The LNG from the liquefaction system will be pumped to the LNG storage tanks (idid). 1.3.2 Refrigeration System The refrigeration system cools and pressurises the refrigerants used in the liquefaction system. The refrigeration system will use closed-loop, refrigerant circuits to provide the low-temperature refrigerants. The refrigerants will be used to liquefy and sub-cool the feed gas in the cryogenic heat exchangers(idid). 1.4 Sources of gas, design rate and project life The natural gas discovery in Cyprus Block 12 has estimated gross mean resources of 5 trillion cubic feet (Tcf)2. Furthermore the available gas will depend first on how much is used for domestic consumption. 𝐺𝑎𝑠  𝑁𝑒𝑒𝑑𝑒𝑑   = 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑃𝑜𝑤𝑒𝑟 𝐻𝑒𝑎𝑡𝑖𝑛𝑔  𝑣𝑎𝑙𝑢𝑒  𝑥  𝐶𝑦𝑐𝑙𝑒  𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 Production  Power  (MWh)3   3000000   Heating  value  (MJ/ m3)4   39.2   Cycle  efficiency  (%)5   37.5   𝐺𝑎𝑠  𝑁𝑒𝑒𝑑𝑒𝑑   =  0,7578  𝑥  10! 𝑚! 𝑦 That means 19 bcm will be used from 2019 until 2044. This reduces the amount of gas available from 141,5 bcm6 to 122,5 bcm. 2 Source: http://www.nobleenergyinc.com/exploration/recent-discoveries-130.html 3 http://www.dsm.org.cy/nqcontent.cfm?a_id=2741&tt=graphic&startdt=20%2F05%2F2010&type=15&submit=Go 4 Courses Material Barns 2014 5 http://www.eac.com.cy/EN/Pages/Home.aspx 6 http://www.convertunits.com/from/trillion+cubic+feet/to/billion+cubic+metre
  • 11. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 11 Field Reserves Tcf 5 Life of LNG plant years 25 Liquefaction efficiency 0.85 1 m3 of LNG 609 m3 of NG produce mtpa to million m3 x 0,46 Table 1.4-1Production Volume related with resources and the size of the LNG plant [((7,062– 0,7578) x 109 (m3/y)) x 0,85] / 609 = 8,8 x 106 (m3/year) x 0,46 = 4mtpa
  • 12. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 12 2. Pipeline connection Another major part of the LNG procedure is the feed process from the reserve to the LNG plant through the pipeline connection. The offshore pipeline construction is related with the environment parameters of the geographical position of the reserve. This parameters are the distance between reserve and LNG plant, the sea depth that is related with the pressure, and the temperature. This parameters define the characteristics of the pipeline such as the Diameter, in/out wall thickness and the material. 2.1 Pipeline Technical Characteristics The Aphrodite-Vasilikos pipeline connection has an offshore distance approximately 200km in 2000m sea depth. These conditions are similar with the ‘Blue Stream’ that provide a conduit for export of Russian gas directly to Turkey with an offshore distance up to 398 km and 2150 m sea depth7. Because of this similarity we can assume that we can use the same pipeline data such as: − Diameter: 24inc (=609.6 mm) − Pressure: 250 bar in a sea depth of 2150m − Temperature: -10ºC to +55ºC − 32 mm wall thickness − Flow rate ~ 2.5m/s and − Material type carbon steel with outer coating of concrete (Shell, 2010). 7 sources: Natural gas prices from index. mundi; LNG prices from Reuters; pipeline costs from Pete Wallace, Tractebel Engineering; LNG plant cost from Minister Sylikiotis; distances from Block 12 to Vassiliko from DEFA; distance from Cyprus to Greece from DEPA; pipeline depth to Greece from Quantum Energy figures on electricity cable.
  • 13. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 13 2.2 Coatings Probably, the best choice for the anti-corrosion coating is application used in the Blue Stream. After several tests the best solution for pipeline protection in the extreme environment of 2000m underwater depth is a three layer polypropylene coating consisting of a first layer of fusion bonded epoxy, a second layer of polypropylene adhesive and an outer layer of polypropylene. 2.3 Pipeline calculations 2.3.1 Outlet pressure Regarding the size of pipeline that brings the NG to shore, several factors should be taken into account. To calculate the size of the pipe the AGA Equation measuring a pipe’s pressure was used: For the estimation of the pipeline size we did not have the necessary information for the several factors and thus, it was based on the following assumption: 5(TCF) / [25(years) x 365(days)] = 547,945.21 (SCFD) [547,945.21 (SCFD) x 365(days) x 35,314] / 1000 = 7,062,800,000 (S m3/year) Q = 7,062,800,000( S m3) / 365days) = 19,350,136.99 m3 /day
  • 14. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 14 Q flow rate at base conditions (m3/day) 19,350,136.99 Calculated Ts: standard temperature (K) 288.9 Curse Material Dr Richard J Barnes 2014 Ps: standard pressure (kPa(a)) 101.56 E: pipeline efficiency 1 ε: pipe roughness (mm) 0.004 T: average flowing temperature (K) 303 Z: Compressibility factor 0.93 d: pipe internal diameter (mm) 711.2 Sources from the Snohviti offshore fields until the Hammerfest LNG plant P1: inlet pressure (kPa(g)) 15,000 γ: gas specific gravity 0.7341 P2: outlet pressure (kPa(g)) 909,651,183 Calculated L: pipeline length (m) 184000 Reserve Data Table 2.3-1 Q flow rate calculations The Outlet pressure is 9096,51183 kPa (=90,96 bar) 2.3.2 Wall thickness The wall thickness is given from the following equation : 𝑇𝑚 = 𝑃𝑑𝑜 2𝑆𝐹𝐸𝑇 + 𝑇𝑐
  • 15. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 15 Tm: wall thickness (mm) 31.98315974 P: Design pressure ((kPa(g)) 17000 Under water Pressure at 1689m do: outside diameter (mm) 609.6 From DEPA S: minimum yield strength (kPa) 248305.11 http://www.hse.gov.uk/r esearch/rrpdf/rr105.pdf F: Construction type design factor 0.72 Courses Material Barnes 2014 E: Longitudinal joint factor 1 T: temperature rating (1,0) 1 Tc: corrosion allowance (mm) 3 Table 2.3-2 Pipe outlet wall thickness
  • 16. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 16 3. LNG export facilities and loading frequency For designing the export facilities the size of the LNG fleet should be considered. According to the PFC energy global Services the 62% of the LNG vessel until 2012 has an average capacity of 138.000 bcm. Designing the LNG Storage of Vasilikos with 180.000 bcm will be able to serve the 81% of the LNG fleet. Furthermore, it is reasonable to construct two storage tank getting the advantage of loading one tank from the liquefaction process and the same time unloading a LNG vessel from the other tank. Considering the above two tanks with total capacity of 360.000 bcm are able to serve even the bigger LNG vessel with 260.000 bcm upload capacity. 3.1 LNG Jetty Type The LNG Jetty connecting the LNG storage tanks and condensate storage tanks with the LNG and condensate export berths. The Jetty stricture include: − LNG loading and vapor return lines, − Condensate loading lines, − Utilities, − Jetty head operations platform. − A roadway capable of accommodating trucks carrying heavy loads, ambulances, small cranes, and pedestrian traffic. Table 3-1 Global LNG Fleet by Capacity, 2012 Sources: PFC Energy Global LNG Service Figure 3-1 LNG jetty
  • 17. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 17 3.2 The loading arms The jetty head will be fitted with unloading arms to connect the ships pipework to the jetty pipework. The loading arms typically consist articulated pipe structures that can be maneuvered to allow the connection of the ships loading/unloading pipework to the shore jetty’s pipelines structure. The loading arms support and direct the vapor return or the loading lines. The two liquid service loading arms and the dual-purpose liquids or vapor return loading arm will assume a usual capacity of 5,000 m3/hour. The vapour return loading arm will have a capacity of 20,350 m3/hr. 3.2.1 LNG serve and uploading time We assume that an average LNG vessel capacity is 138.000m3. Eventually, only one jetty is needed to serve a ship with a rate of 5,000 m3/hour and it needs 27,6 hours. If two arms are loading the vessel will be loaded in 13,8 hours. Number of tanker that can be served per year related with the annual LNG production are: 8,8 x 106 (m3/year) / 138.000 m3/ship ≅  64 LNG vessel per year Figure 3.2-1 Al-Khuwair loading at gate LNG in Netherlands1
  • 18. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 18 4. LNG storage tank size, type and quantity The Vasilikos Energy Project proposes to store the LNG under cryogenic conditions on site at slightly above atmospheric pressure by a system of pressure relief valves set at 250 bar in double skinned 172,000 m3 LNG Tanks. The inner tank is constructed of a nickel steel alloy and is designed to hold the LNG. The outer tank constructed of reinforced pre- stressed concrete is designed to hold the liquid contents of the tank in the event of a leak. The 1m space between the tanks is filled with an insulating material designed to minimize heat ingress into the tank. The tanks will be the largest structures on the site at 80 m in diameter and 45 meters high with a domed roofs and a number of valves and fittings on the tank roof. LNG export pumps will be located within wells inside the LNG tank. The tank’s concrete floor is likely to be provided with a heating element in order to prevent water in the ground beneath the tank from freezing and disturbing the tank foundations. Figure 3.9 below shows the typical tank layout (Parsons Brinckerhoff Limited, Aeoliki Limited, 2006). `Figure 4-1 Storage Tanks at Yemen LNG, Balhaf, Yemen1
  • 19. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 19 Figure 4-2 Full Containment (Steel Roof) LNG Tank8 Tanks themselves will not need any external refrigeration sources as they are cooled automatically using latent heat (the absorption of heat energy by the evaporating gas) derived from the LNG boil off gas. The heat flux into the tanks will be kept to a minimum by insulting both the tanks themselves and the unloading lines through which the LNG is constantly circulated (ibid). 8 Source Global LNG Sales LNG Import Terminal Cost and Schedule Basics (Gerald Humphrey)
  • 20. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 20 5. Bibliography Unsupported source type (ElectronicSource) for source GUP. Arms of innovation. 2014. [Film] France: dsp an endemol company. BBCnews, 2013. "Shell's record-breaking Prelude takes to the water". [Online] Available at: https://web.archive.org/web/20131204184139/http://www.bbc.co.uk/news/tech nology-25213845 [Accessed 04 December 2013]. Bergin, W. & Spearman, E., 2006. Vasilikos Energy Centre Basis of Design Environmental Assessment. EA. Middlesex: Parsons Brinckerhoff Limited, Aeoliki Limited. Bp, 2013. con Fact. [Online] Available at: www.car.gr. Briggs, et al., 2013. LNG LIQUEFACTION PLANT. In “Poten”, ed. MASTER PLAN OF THE VASILIKOS AREA. NIcosia: “Poten” & "ALA". p.29. Chartered , P., 1992. http://www.the-edi.co.uk/. [Online] (7th) Available at: http://www.the-edi.co.uk/downloads/eia_spring_2007.pdf [Accessed 19 April 2007]. Exxon Mobil, 2013. [Online] Available at: http://pnglng.com/downloads/eis_chapter04.pdf. Delek Group, 2014. [Online] Available at: http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0C CsQFjAA&url=http%3A%2F%2Fphx.corporate- ir.net%2FExternal.File%3Fitem%3DUGFyZW50SUQ9NTM5MDYxfENoaWxkSUQ9MjI4NT kzfFR5cGU9MQ%3D%3D%26t%3D1&ei=0lduU- WqMsG1PcS0gMgD&usg=AFQjCNGDcT79dYdH6cavDiXX5Q2neeM4tQ&bvm=bv. 66330100,d.ZWU [Accessed April 2014].
  • 21. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 21 International Institute for Environment and Development (IIED) , n.d. http://www.environmental-mainstreaming.org. [Online] Available at: http://www.environmental- mainstreaming.org/documents/EM%20Profile%20No%201%20- %20EIA%20(6%20Oct%2009).pdf. Kotzot, , Durr, , Coyle, & Caswell, , 2007. LNG LIQUEFACTION — NOT ALL PLANTS ARE CREATED EQUAL. [Online] KBR Available at: http://www.kbr.com/Newsroom/Publications/LNG/ [Accessed 2007]. National Centre for Risk Analysis and Options Appraisal Environment Agency, 2002. https://www.gov.uk/. [Online] Environment Agency Available at: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file /296952/geho0411btrf-e-e.pdf [Accessed 01 May 2002]. A handbook for scoping projects. Nobole Energy International, 2013. http://www.mcit.gov.cy. [Online] Available at: http://www.mcit.gov.cy/mcit/mcit.nsf/All/11FFCD876C06B58CC2257C7700255D1 8/$file/04-Vasilikos%20Master%20Plan%202013_Executive%20Summary%20- %20Eng.pdf [Accessed 1 Octomber 2013]. Managment, E.R., 2001. http://ec.europa.eu/. [Online] Available at: http://ec.europa.eu/environment/eia/eia-guidelines/g-scoping-full-text.pdf [Accessed 19 April 2014]. Paltsev, et al., 2013. Natural Gas Monetization Pathways for Cyprus. Economics of Project Development Options. Massachusetts: Massachusetts Institute of Technology MIT Energy Initiative, Massachusetts Institute of Technology, Cyprus Institute. Parsons Brinckerhoff Limited, Aeoliki Limited, 2006. VASILIKOS ENERGY CENTRE BASIS OF DESIGN ENVIRONMENTAL ASSESSMENT. Middlesex: M.W. Kellogg Limited Kellogg.
  • 22. MOE 506 LNG Processing, Storage, Transport, Re-gasification, Distribution and Usage 22 Shell, 2010. Transporting Oil and Gas, What’s in a Barrel of Oil?. [Online] Available at: www.shell.us/alaska. Shell, n.d. Prelude FLNG. [Online] Available at: http://www.shell.com.au/aboutshell/who-we-are/shell- au/operations/upstream/prelude.html [Accessed 2 May 2014]. Tsakiris, D.T., 2013. www.eliamep.gr/en. [Online] Available at: http://www.eliamep.gr/wp-content/uploads/2014/02/policy-paper.pdf [Accessed November 2013]. iSource about Shoviet reserve http://www.ivt.ntnu.no/ept/fag/tep4215/innhold/LNG%20Conferences/20 07/fscommand/PS7_3_Skjerven_s.pdf