• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Project mgmt set up of cement plant
 

Project mgmt set up of cement plant

on

  • 3,160 views

 

Statistics

Views

Total Views
3,160
Views on SlideShare
3,160
Embed Views
0

Actions

Likes
0
Downloads
61
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • It would be describing the whys, hows , whats and whens.

Project mgmt set up of cement plant Project mgmt set up of cement plant Presentation Transcript

  • Set up of Cement plantforBUNIYAD Cement Limited.Thumdi, Surat (Gujarat)
    Team Members :
    Abhishek Saxena (BLP012)
    NiharRoutray (BLP022)
    Abhishek Kumar (BLP038)
    Shankar Narayan (BLP039)
    Kushal Prakash (BLP061)
  • Brief Introduction
    • Setting up of ClinkerisationPlant LM 63.3+3C based on dry process and Vertical Roller Mill (VRM) technology.
    • All units in the upstream and downstream of the VRM will be designed for an installed cement production capacity of 270/303(OPC/PPC) tph.
    • The total annual output of cement will be about 3.3 mtpa(average of 300 working days basis)
  • Project Goals
    • Installation and commission of VRM LM 63.3+3C for BUNIYAD cements Ltd.
    • Follow best practices in procurement, supplies, services and logistics.
    • Ensure employee and client satisfaction.
    • Train the employees of BUNIYAD cements Ltd
  • Scope of Work
    • Engineering work of Loesche mills
    • Procurement and delivery of all the equipments
    • Supervision of installation and commissioning activities
    • Verification of all statutory documents and NOC
  • Project Plan
    • Statement of Work
    • Roles and Responsibilities
    • Work breakdown structure
    • Project Schedule
    • Communication Plan
  • Statement of Work
    To setup, test and commission major and auxiliary assemblies of Cement Plant
  • Roles and Responsibilities
  • Work Breakdown Structure
    • The complete project has been divided into 26 major tasks .
    • These tasks have been further divided into subtasks.
  • ProjectSchedule
    Start Date - 10th February, 2011
    End Date - 20th October, 2011
    Major Project Milestone
     
    • Supply of all materials and auxiliaries 06-Jan-2011
    • Startup of civil work 14- Feb-2011
    • Startup of installation 15-Mar-2011
    • Commissioning both hot and cold 10-Oct-2011
    • Quality Check 11-Oct-2011
  • Communication Plan
  • Execution
    • Process Flow
    • Installation
    • Commissioning
    Cold Commissioning
    Hot Commissioning
    Quality Control
    • Maintenance
    • Manage people & Resources
    • Scope Creep
    • Hold meetings
  • Monitoring and Controlling
    • Measure Performance
    • Create forecasts
    • Perform Quality Control
    • Perform Risk Audits
  • Project Closure
    • Gain formal acceptance
    • Complete final performance report
    • Update Lessons learnt and Knowledge acquired during the project
    • Release resources
  • Exhibit