FederalMinistryofWorksPRESENTED(TO(THEFEDERAL(EXECUTIVE(COUNCIL((FEC)(By##THE(HONOURABLE(MINISTER(OF(WORKS(ARC.(MIKE(ONOLE...
HISEXCELLENCYDR.(GOODLUCK(EBELE(JONATHAN(GCON,(GCFR(PRESIDENT,COMMANDERINCHIEFOFTHEARMEDFORCESFEDERALREPUBLICOFNIGERIA
HISEXCELLENCYARC.(MOHAMMED(NAMADI(SAMBO,(GCON(VICEPRESIDENTFEDERALREPUBLICOFNIGERIA
ARC.(MIKE(ONOLEMEMEN,(fnia,&fnim,&fnis&HONOURABLEMINISTEROFWORKS
AMBASSADOR((BASHIR((YUGUDA(HONOURABLEMINISTEROFSTATEFORWORKS
HEADQUARTERS(OF(THE(FEDERAL(MINISTRY(OF(WORKS
7©2013,FederalMinistryofWorksOutline....SecJon(A(M(IntroducJon(M  StatutoryMandateM  OurVision&MissionM  Departments&Agenc...
©2013,FederalMinistryofWorks 8SECTION(A(M(INTRODUCTION(
©2013,FederalMinistryofWorks 9Mandate(of(the(Ministry(Tomanage,directandcontrolFederalHighwaysinNigeria,throughPlanning(in...
©2013,FederalMinistryofWorks 10Vision(and(Mission(StatementsMissionTo use the intellectual, managerial and materialresourc...
©2013,FederalMinistryofWorks 11OrganizaJonal(Structure(of(the(MinistryKEY(DEFINITIONS:M(HPD(–HighwaysPlanning&DevelopmentH...
Nigeriahasatotalroadnetworkof200,000kmownedbytheFederal,StateandLocalGovernments.Onlyabout65,000kmofthe200,000kmarepavedmo...
©2013,FederalMinistryofWorks 13CondiJon(of(Federal(Roads(as(at(May(2011(Consequences(of(Road(Network’s(Decay(! A 2010 stud...
Leveragingonthemajorstructural/managementchangesof2011,theFMWsetouttoachievethefollowing:©2013,FederalMinistryofWorks 14Ma...
©2013,FederalMinistryofWorks 15ConsJtuJng(Departments(&(Agencies((ToreinvigorateandmakethemanagementofthenaXon’sroadnetwor...
©2013,FederalMinistryofWorks 16AlsotheEngineeringServicesdepartmentwasrestructuredtothreedepartments,viz:Departments(&(Age...
©2013,FederalMinistryofWorks 17SECTION(B(M(ACTIVITIES(
Theministry’sRevenueandExpenditureintheperiodunderreviewisstatedasfollows:©2013,FederalMinistryofWorks 18Revenue(and(Expen...
©2013,FederalMinistryofWorks 19Projected(Investment(Plan(under(1st(NIP(&(TransformaJon(Agenda(S/NO.( PROJECT(TITLE( STATUS...
©2013,FederalMinistryofWorks 20Stakeholder(Engagements(During the last 12 months, the Ministry conducted the followingstak...
©2013,FederalMinistryofWorks 21Stakeholder(Engagements(MeeJng(with(the(AFDB(led(by(Country(RepresentaJve
©2013,FederalMinistryofWorks 22Stakeholder(Engagements(MeeJng(with(Nigerian(Society(of(Engineers(in(May,(2012
©2013,FederalMinistryofWorks 23Stakeholder(Engagements(MeeJng(with(Tanker(and(Road(Workers
TheMinistryconductedthequarterlymonitoringvisitsandalsoparXcipatedinthefollowingmonitoringexercise:©2013,FederalMinistryof...
Duringtheperiodunderreview,theMinistryorganized/aoendedthefollowing:©2013,FederalMinistryofWorks 25%  Seminar to set up a ...
©2013,FederalMinistryofWorks 2619th(NaJonal(Council(on(works(in(Lagos(in(April,(2012(with(the(theme(“Towards(an(Improved(R...
©2013,FederalMinistryofWorks 27COREN(InternaJonal(Workshop(held(at(Rockview(Hotel(Conferences,(Seminars(&(Training(
©2013,FederalMinistryofWorks 28Estate(Surveyors(and(Valuers(ConferenceConferences,(Seminars(&(Training(
%  During( the( last( 12( months,( the(Ministry( revived( and( commenced(training( at( the( three( (3)( Nos.(Highway( Trai...
©2013,FederalMinistryofWorks 30Conferences,(Seminars(&(Training(Training&on&the&use&of&Total&Sta=on&at&the&Highway&Trainin...
ThefollowingOfficialengagements(bothdomesXcandforeign)werecarriedoutin2012©2013,FederalMinistryofWorks 31Official(Engagements:...
US-Nigeria Infrastructure Summit in Washington DC,October 2012©2013,FederalMinistryofWorks 32Official(Engagements:(
•  Hon.(Minister(of(Works(visit(to(India’s(Minister(of(Road(TransportaJon(and(Highways(during(a(Working(Tour(in(New(Delhi,...
Meeting with Infrastructure Leasing & Financial Services Limited(IL&FS) in February, 2012 at their office in India(©2013,F...
©2013,FederalMinistryofWorks 35SECTION(C(–(KEY(OUTPUTS(
(Programmes(and(IniJaJves(Put(in(Place:((TodeliveronMr.President’sTransformaXonAgendaintheroadsector,theMinistryputinplace...
©2013,FederalMinistryofWorks 37Treasury(Funded(Projects:(M(168(road(projects,(mostly(abandoned.(Where(‘we’(were(in(Jan.(20...
0(15(30(45(60(75(90(105((Km)(Achieved(in(2012( Total((Km)(Achieved(to(Date( Total(Length(©2013,FederalMinistryofWorks 38Ac...
©2013,FederalMinistryofWorks 39Completed(Projects(CompleJon(of(32(OnMgoing(Road(Projects(with(details(as(follows:(!  Rehab...
©2013,FederalMinistryofWorks 40!  RehabilitaXon/ReconstrucXon of Lafenwa( Bridge( inAbeokutaC/NO.6064!  RehabilitaXon of G...
©2013,FederalMinistryofWorks 41!  RehabilitaXon of AnkaMDaki( TakwasMGummi road inZamfaraState;C/NO.6090!  Periodicmainten...
©2013,FederalMinistryofWorks 42!  PeriodicmaintenanceofOkpalaMIgwuritaRoadinImoStateFRDP/2010/NCB/W/06!  Periodicmaintenan...
©2013,FederalMinistryofWorks 43!  PeriodicmaintenanceofLafiagiMMokwaRoadinNigerStateFRDP/2011/ICB/PMW/12!  Periodic mainten...
!  Also( the( Ministry( completed( the( sevng( up( of( a( design( office( and(equipping( same( with( contemporary( hardware(...
!  Following(the(recent(effects(of(floods(in(some(parts(of(the(country,(the(Ministry(intervened(by(carrying(out(the(followin...
©2013,FederalMinistryofWorks 46•  OPERATION(SAFE(PASSAGE:(M(With(the(support(of(Mr.(President,(the(Ministry( was( able( to...
©2013,FederalMinistryofWorks 47OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(Ope...
©2013,FederalMinistryofWorks 48OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(Ope...
©2013,FederalMinistryofWorks 49OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(Ope...
ZONAL(PROJECT(BUDGET((bn)(North(Central((NC)( North(East((NE)(North(West((NW)( South(East((SE)(South(South((SS)( South(Wes...
(LOOKING(AHEAD:(The(Inevitability(of(Paradigm(SHIFT((In line with the new policy IniXaXves, the Ministry has adopted a new...
©2013,FederalMinistryofWorks 52BOLD(APPROACH(TO(ROAD(DEVELOPMENT(BOLD(HolisJc(Improvement(&(Expansion(of(ExisJng(economic(...
•  The finance of road projects has beenthrough budgetary provisions which havebeen too inadequate to fund the projectsandm...
•  The(FMW(in(2012(received(addiJonal(funding(of(N85.5(billion(from(the(SUREMP(for(selected(projects.(The(project(details(...
Some( of( the( alternaJve( sources( of( funding( Highway(infrastructure(being(explored(by(the(Ministry(include:(M(©2013,Fe...
(60%((40%(©2013,FederalMinistryofWorks 56SHIFT(to(PublicMPrivate(Partnership((PPP):(•  ThePPPDepartmentisundertakingcompre...
©2013,FederalMinistryofWorks 57#  The# following# PPP# Projects# are# under#procurement#at#the#following#stages:;PPP(PROJE...
©2013,FederalMinistryofWorks 58PROPOSED&PPP&HIGHWAY&PROJECTS&WITH&OBC&&COMPLETED&# OBC# has# been# completed# by# the# TA#...
TheMinistryaspartofitsBOLDapproachtoroaddevelopmenthasplanstodevelopegreenfieldprojectstobridgethehugegapinRoadInfrastructu...
©2013,FederalMinistryofWorks 602nd(Lagos(Outer(Ring(Road(The 2nd Lagos Outer Ring Road, which is 73.2km in length, isconce...
KANO(MAIDUGURI(KADUNA(ABUJA(LOKOJA(BENINASABA/(ONITSHA(ENUGU(PORT(HARCOURT(WARRI(SHAGAMU(LAGOS(ILORIN(OGBOMOSO(OYO(EXISTIN...
©2013,FederalMinistryofWorks 62GOLDEN((ECONOMIC)(TRIANGLE(SUPERMHIGHWAY(
©2013,FederalMinistryofWorks 63CollaboraJon(with(MulJMLateral(Agencies(through((ROAD(SECTOR(DEVELOPMENT(TEAM((RSDT)((
©2013,FederalMinistryofWorks 64RSDT(Projects(Financed(by(IDA:(M(Under the framework of the FRDP, RSDT iscurrently implemen...
45%(45%(10%(©2013,FederalMinistryofWorks 65REHABILITATION/MAINTENANCE(PROJECTS(M(RSDT%  45%(of(Project(have(been(Completed...
©2013,FederalMinistryofWorks 66Road(Length((km)(The(RSDT(in(collaboraJon(with(MulJMLateral(Agencies(rehabilitated/maintain...
©2013,FederalMinistryofWorks 67&INSTITUTIONAL&STRENGTHENING,&POLICY&REFORM&&&&CAPACITY&BUILDINGQ&RSDT%  Review(of(NaJonal(...
©2013,FederalMinistryofWorks 68&ROAD&SAFETY&COMPONENTQ&RSDT!  Procurement of CommunicaXon andRoadSafetyEquipment!  Procure...
©2013,FederalMinistryofWorks 69RSDT(Projects(Financed(by(AfDB:(M(Under the NigeriaMCameroon MulXnaXonalHighway and Transpo...
©2013,FederalMinistryofWorks 70Proposed(Project(Under(RSDT(to(be(Financed(by(China(EXIM(Bank(loan:(!  Dualiza=on&of&Keffi&Q&...
©2013,FederalMinistryofWorks 71FEDERAL(ROAD(MAINTENANCE(AGENCY((FERMA)((ROAD&MAINTENANCE&WORKS&COMPLETED&&&&IN&PROGRESS&AL...
©2013,FederalMinistryofWorks 72Road(Maintenance(Projects(by(FERMA:(M(Road maintenance under the Ministry is carried out by...
©2013,FederalMinistryofWorks 73Road(Length((km)(Road(Maintenance(Projects((Cont.):(FERMA(was(involved(in(recovering(of(roa...
©2013,FederalMinistryofWorks 74110Acquired)Pothole)Patchers and)a)Pothole)Patcher in)OperationAcquired(Pothole(Patchers(A(...
©2013,FederalMinistryofWorks 75SECTION(D(–(KEY(OUTCOMES(DELIVERED(
©2013,FederalMinistryofWorks 76Outcomes(Performance(Matrix:(S/N( Performance(Indicators( 2012((Planned(Target)(2012((Actua...
©2013,FederalMinistryofWorks 77Outcomes(Performance(Matrix((ConJnued):(S/N( Performance(Indicators( 2012((Planned(Target)(...
©2013,FederalMinistryofWorks 78Outcomes(Performance(Matrix((ConJnued):(16. NoofGovernmentstafftrained 400 71517. DonorFundi...
©2013,FederalMinistryofWorks 79Outcomes(Performance(Matrix((ConJnued):(22.23.24.25.Topographic(Maps(and(Others:(Establishm...
©2013,FederalMinistryofWorks 80Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(fu...
©2013,FederalMinistryofWorks 81Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(fu...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(S/No.(AGREEDPOLICYANDPROGR...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWor...
©2013,FederalMinistryofWorks 89Number(of(Jobs(Created:($  During(the(year(2012,(the(Ministry(in(collaboraJon(with(the(Fede...
©2013,FederalMinistryofWorks 90Status(of(New(LegislaJon:(!  Submission(of(Report/(dras(Bills(to(BPE(and(the(Ministry((Apri...
©2013,FederalMinistryofWorks 91Regulatory(and(AdministraJve(Services:M(! (The(Ministry(introduced(the(use(of(Bitumen(Emuls...
©2013,FederalMinistryofWorks 92SECTION(E(–(CHALLENGES/CONSTRAINTS(
©2013,FederalMinistryofWorks 93Challenges((((((((((((((((((Large(Number(of(Ongoing(Road(Projects(despite(FMW’s(efforts(at(p...
©2013,FederalMinistryofWorks 94What(Has(Worked/What(Has(Not(Worked:(M(What(Has(NOT(Work(What(Has(Work(•  Decadesofinapprop...
©2013,FederalMinistryofWorks 95MITIGATION(STEPS(TOWARDS(THE(CHALLENGES(OF(THE(MINISTRY:(M(Challenges(Inadequate(funding(of...
Some#on;going#highway#projects#across#the#country©2013,FederalMinistryofWorks 96PAVING(THE(WAY(TO(A(GREATER(NIGERIA(COMPLE...
©2013,FederalMinistryofWorks 97DualizaJon(of(KanoMMaiduguri(roadDualizaJon(of(AbujaMLokoja(road((Giri(JuncJon)
©2013,FederalMinistryofWorks 98Refinery(Road(Warri(Vom(–(Manchok(Road
©2013,FederalMinistryofWorks 99DualizaJon(of(AbujaMLokoja(road((SecJon(II)Rehab.(of(OnitshaMEnugu(Dual(carriageway
©2013,FederalMinistryofWorks 100GENERAL(MAINTENANCE(REPAIRS(OF(KADUNA(–(BIRNIN(GWARI(ROAD(IN(KADUNA(STATE(((BEFORE( ((DURI...
©2013,FederalMinistryofWorks 101GENERAL(REPAIRS(OF(IFE(–(ILESHA(HIGHWAY((DUAL(CARRIAGEWAY)((((BEFORE( ((DURING( AFTER(
©2013,FederalMinistryofWorks 102SECTION(F(M(CONCLUSION(
©2013,FederalMinistryofWorks 103CONCLUSION(•  Road( Infrastructure( development( and( economic(growth( are( mutually( rein...
©2013,FederalMinistryofWorks 104Thank(YOU!
©2013,FederalMinistryofWorks 105
The(80Nos.((PrioriJsed)(onMgoing(projects(of(the(ministry(in(2012(are(as(follows:(©2013,FederalMinistryofWorks 106APPENDIX...
©2013,FederalMinistryofWorks 10721REHABILITATION(AND(ASPHAT(OVERLAY(OF(BENINMSHAGAMU(EXPRESS(WAY(((BENINMOFOSU(SECTION)(IN...
©2013,FederalMinistryofWorks 10841REHABILITATION(OF(ENUGUMPORT(HARCOURT(DUAL(CARRIAGEWAY(SECTION(II:(UMUAHIAMPORTMHARCOURT...
©2013,FederalMinistryofWorks 10961 DAMASAKMDUTSE((NIGERIA)MDIFFA((NIGER(REPUBLIC)(ROAD(IN(BORNO(STATE(C/NO.(6071 30.59%62C...
Upcoming SlideShare
Loading in...5
×

FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALLENGES.

4,331

Published on

To elevate Nigerian Roads to a Standard where they become National Economic and Socio–Political Assets, contributing to her rapid growth and development; to make Federal Roads functional, pleasurable and an avenue of re-inventing Nigerians’ trust and confidence in government.

1 Comment
1 Like
Statistics
Notes
  • hello Mr, Honorable minister,i really salute your effort so far in transforming our road, however there is a lot more to be done for instants the Badagry express way construction is a huge project imback on by this present administration looking at its economic value such a project shouldn't be handled with laxity at all but the truth is that the lacks appropriate attention from your ministry no proper supervision and evaluation of the work done parts of the road that are newly constructed has damaged due to substandard materials used in doing the job and lack of adequate drenages the project will turnout to be a huge economic waste if not adequately supervise executed.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total Views
4,331
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
1
Likes
1
Embeds 0
No embeds

No notes for slide

Transcript of "FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALLENGES. "

  1. 1. FederalMinistryofWorksPRESENTED(TO(THEFEDERAL(EXECUTIVE(COUNCIL((FEC)(By##THE(HONOURABLE(MINISTER(OF(WORKS(ARC.(MIKE(ONOLEMEMEN,(fnia,&fnim,&fnis&((Federal Ministry of WorksTRANSFORMING(NIGERIAN(ROADS:(ACHIEVEMENTS(AND(CHALLENGES(IN(2012(April(,(2013(
  2. 2. HISEXCELLENCYDR.(GOODLUCK(EBELE(JONATHAN(GCON,(GCFR(PRESIDENT,COMMANDERINCHIEFOFTHEARMEDFORCESFEDERALREPUBLICOFNIGERIA
  3. 3. HISEXCELLENCYARC.(MOHAMMED(NAMADI(SAMBO,(GCON(VICEPRESIDENTFEDERALREPUBLICOFNIGERIA
  4. 4. ARC.(MIKE(ONOLEMEMEN,(fnia,&fnim,&fnis&HONOURABLEMINISTEROFWORKS
  5. 5. AMBASSADOR((BASHIR((YUGUDA(HONOURABLEMINISTEROFSTATEFORWORKS
  6. 6. HEADQUARTERS(OF(THE(FEDERAL(MINISTRY(OF(WORKS
  7. 7. 7©2013,FederalMinistryofWorksOutline....SecJon(A(M(IntroducJon(M  StatutoryMandateM  OurVision&MissionM  Departments&AgenciesM  BackgroundSecJon(B(M(AcJviJes(M  Revenue&ExpenditureProfileM  StakeholdersEngagementM  MonitoringVisits&ReportsM  Conferences,Seminars&TrainingSecJon(C(–(Key(Outputs(M  PolicyIniXaXvesM  Achievementsin2012(Completed/OnMgoingProjects)M  SHIFTtoPublicPrivatePartnershipM  FuturePlansoftheMinistryM  CollaboraXonwithMulXMLateralAgencies(RSDT)M  RoadMaintenance(FERMA)SecJon(D(–(Key(Outcomes(Delivered(M  OutcomesPerformanceMatrixM  NumberofJobsCreatedbytheMinistryM  StatusofNewLegislaXonM  RegulatoryandAdministraXveServicesSecJon(E(–(Challenges/Constraints(M  ChallengesM  WhatHasWorked&WhatHasNotM  MiXgaXonStepsSecJon(F(–(Conclusion((M  ConclusionM  Appendix
  8. 8. ©2013,FederalMinistryofWorks 8SECTION(A(M(INTRODUCTION(
  9. 9. ©2013,FederalMinistryofWorks 9Mandate(of(the(Ministry(Tomanage,directandcontrolFederalHighwaysinNigeria,throughPlanning(includingresearchand design of federal highways), construcXon,maintenance and the supervision of user ofsuch highways and the regulaXon of trafficthereon (Federal Highways Act CAP. 135), aswell as surveying and mapping the NaXon’sinternalandexternalboundaries.
  10. 10. ©2013,FederalMinistryofWorks 10Vision(and(Mission(StatementsMissionTo use the intellectual, managerial and materialresourcesavailabletotheFederalMinistryofWorkstomakeNigerianroadsfuncXonalatallXmesVisionOur vision is to elevate Nigerian roads to astandard where they become veritable naXonalassets and a tool for naXonal integraXon,contribuXng to naXonal growth and developmentandhelptoreMinventthetrustandconfidenceofNigeriansintheFederalGovernment.
  11. 11. ©2013,FederalMinistryofWorks 11OrganizaJonal(Structure(of(the(MinistryKEY(DEFINITIONS:M(HPD(–HighwaysPlanning&DevelopmentHBD(–HighwaysBridgeDesignHRD(–HighwaysRoadsDesignM,GT&QC–Material,GeoMTechnicsandQualityControlHPPP(–HighwaysPublicPrivatePartnershipHRSDT(–HighwaysRoadsSectorDevelopmentTeamHRM(–HumanResourceManagementF&A(–Finance&AccountsPRS(–PlanningResearch&StaXsXcsPP(–PublicProcurementEMS(–EngineeringManagementServicesESLS(–ElectricalStreetLighXngServicesCWEMCentralWorkshop&EquipmentHZO(–(Highways(Zonal(OperaJons(HNC(((–HighwaysNorthCentral(HNE((((–HighwaysNorthEastHNW((–HighwaysNorthWestHSE((((–HighwaysSouthEastHSS((((–HighwaysSouthSouthHSW(((–HighwaysSouthWestHonourable(Minister(HPD(DEPT.(OSGOF FERMAUNITS–(Press,InternalAudit,Protocol,Reforms/Servicom,StoreVerificaXonPermanentSecretaryHonourableMinisterofStateHRD(DEPT( HZO(DEPT( RSDT( F(&(A(DEPT( PROC(DEPT( ESLS(DEPT(HBD(DEPT( HGT(DEPT( HPPP(DEPT( HRM(DEPT( PRS(DEPT( EMS(DEPT( CWE(DEPT(DirectorLegalServices DirectorPerm.Sec.Office
  12. 12. Nigeriahasatotalroadnetworkof200,000kmownedbytheFederal,StateandLocalGovernments.Onlyabout65,000kmofthe200,000kmarepavedmostlyinbituminouslayers.Outofthis,theFederalGovernmentownsabout35,000kmrepresenXng54%oftheenXrebituminousroadnetworkinNigeria.Thebalanceissharedbetweenthe36 States and the 774 Local Government Areas. Currently most of the goods andpassengerstransportaXoninthecountryarecarriedbyroad.©2013,FederalMinistryofWorks 12Background:(Nigeria(Bituminous(Paved(Road(Ownership(Structure(!  Although Federal roads consXtute 54% of the totalbituminous naXonal road network, they carry more than80%oftheNaXonalvehiculartraffic."  About( 80%( of( the( 35,000km( of( federal( roads( were(constructed(as(at(1983.((!  In 1983, only about 150,000 vehicles were plyingNigerianroads.!  In 2000, about 1.3million vehicles were moving onNigerianroads!  In 2012, the numbers of vehicles on Nigerian roadsrose to 9million. Yet, the total kilometer ofbituminous roads in Nigeria did not witness anyappreciableincreasetomeetthedemand!  This has led to increased pressure on our roads,coupledwiththenonMavailabilityofrailtransportaXonforhaulagethesepast20years.54%(35%(11%(FederalRoads StateRoads LGARoads
  13. 13. ©2013,FederalMinistryofWorks 13CondiJon(of(Federal(Roads(as(at(May(2011(Consequences(of(Road(Network’s(Decay(! A 2010 study ofthe condiXon ofFederal roadsrevealed thatonly 27% of theroads were ingood condiXonwithdevastaXngconsequencestot h e n a X o n ’ seconomy.N88b(LOSS(due(to(increased((Vehicle((OperaJng(Costs(((((((((((((((((((((((((&(12b(LOSS(due(to((((((((((((((((((((((delayed(turnMaround((((((((((((((((((((((((((((((and((increased(((((((((((((((((((((((((((((((travel(Jme((N75b(loss(due(to(reducJon(in(asset(value(Total(annual(LOSS(to(the(economy(in(the(order(of(N175(billion.(SOURCE:(“RoadsVision2000”MThelosscalculatedat2.5%ofGDP
  14. 14. Leveragingonthemajorstructural/managementchangesof2011,theFMWsetouttoachievethefollowing:©2013,FederalMinistryofWorks 14Mandate(of(the(Ministry(in(2012(Improve( the( Federal( Road( Network(through:((!  Beoer planning, design,construcXonandmaintenanceofFederalroadinfrastructure.(!  ThecompleXonofroadprojectsthat have aoained about 70%compleXonandabove.Make(SubstanJal(Progress(in(the(OnMgoing(Work(on(Major(Economic(Routes(Such(as:((1.Abuja–Lokoja–BeninDualisaXonProject.2. Kano – PoXskum – Maiduguri DualisaXonProject3. Onitsha–EnuguExpresswayRehabilitaXonProject4. Benin – Ore – Shagamu ExpresswayRehabilitaXonProject.FastMTrack( Procurement(and(Ground(Breaking(On:(((1.  2ndNigerBridge2.  OwetoBridgeOur(Mandate("  FastMTrack(CompleJon(((((((of(Roads(to(the(Seaports,(Airports(and(Refineries"  Commence(and(Complete(Maintenance(Works(on(3rd(Mainland(Bridge.
  15. 15. ©2013,FederalMinistryofWorks 15ConsJtuJng(Departments(&(Agencies((ToreinvigorateandmakethemanagementofthenaXon’sroadnetworkandonMgoingprojectsmoreeffecXve,theexisXngtwohighwaydepartmentswererestructuredintotwelvedepartments,viz:#  Six (6) Departments ofHighway ConstrucXon &RehabilitaXonaredomiciledin each of the six geoMpoliXcal zones of thecountryforcloserandmoreeffecXve supervision andmanagement of highwayprojects.#  The SHIFT in InsXtuXonalStructures has broughtabout the revival of manyunderperforming projectsliketheDualizaXonofAbuja– Lokoja Highway and theKano – Maiduguri Highwaywhich earlier had designchallenges.(DIRECTORATE(OF(HIGHWAYS(Highway(Department(for((Planning(and(Development(NC(Highways(Const.((&(Rehab.(Dept.(Dept.(for(Materials,(Geotechnics(&(Q/Control(Road(Sector(Development((Team((RSDT)(Department(for((PublicMPrivate(Partnership(Highway(Department(for((Road(Design(Highway(Department(for((Bridge(Design(NW(Highways(Const.((&(Rehab.(Dept.(SE(Highways(Const.((&(Rehab.(Dept.(SS(Highways(Const.((&(Rehab.(Dept.(SW(Highways(Const.((&(Rehab.(Dept.(NE(Highways(Const.((&(Rehab.(Dept.(
  16. 16. ©2013,FederalMinistryofWorks 16AlsotheEngineeringServicesdepartmentwasrestructuredtothreedepartments,viz:Departments(&(Agencies((Cont.):(M(DIRECTORATE(OF(ENGINEERING(SERVICES(Electrical(&(Street(LighJngEngineering(Management((ServicesCentral(Workshop(&(EquipmentOTHER(AGENCIES(AND(DEPARTMENTS(FERMAOSGOF
  17. 17. ©2013,FederalMinistryofWorks 17SECTION(B(M(ACTIVITIES(
  18. 18. Theministry’sRevenueandExpenditureintheperiodunderreviewisstatedasfollows:©2013,FederalMinistryofWorks 18Revenue(and(Expenditure(Profile:(B u d g e t(Breakdown!Projected(Investmen t( P l a n(under( 1st(NIP(!((N)!((((((((((((((((((((((((((((Budgetary(AllocaJon! Internally(Generated(Revenue!D o n o r /(P r i v a t e(S e c t o r(Cont.!(N)!Total(Exp.!((N)!AppropriaJon!(!(!(N)!Budget( Warrant(Released!(N)!Amount( Cash(Backed!(N)!Capital! (! 143,592,745,847! 111,030,619,810! 111,030,619,810! N/A! USD492millionf r o mI D A( W o r l dBank) &AfDB!1 1 0 , ( 1 9 4 ,(309,674!Recurrent! ! 609,525,460! 609,525,460! N/A! 564,758,532! ! 569,142,541.32!
  19. 19. ©2013,FederalMinistryofWorks 19Projected(Investment(Plan(under(1st(NIP(&(TransformaJon(Agenda(S/NO.( PROJECT(TITLE( STATUS(TOTAL(COST(TO(COMPLETE((BILLION)(IMPLEMENTATION(STRATEGY(1( ConstrucJon(of(2nd(Niger(Bridge(Across(River(Niger(at(Onitsa/Asaba( NEW( 80.00( PPP(&(SUREMP(2( DualizaJon(of(IbadanMIlorin(SecJon(II( ONMGOING( 34.19( BUDGET(3( DualizaJon(of(ObajanaMBenin( NEW( 120.00( BUDGET(4( DualizaJon(of(OnithsaMOwerri(and(Onitsha(Easter(Bypass(C/N.5660( COMPETED( 4.52( BUDGET(5( KanoMKazaureMDauraMMai(Adua(Road(in(Katsina(State,(C/N.5997( COMPETED( 0.63( BUDGET(6( Kano(Western(Bypass(C/N.5960( ONMGOING( 8.11( BUDGET(7( LokoMOweto(Bridge( ONMGOING( 30.70( BUDGET(&(SUREMP(8( PanyamMBokkosMWamba(C/N.5944( ONMGOING( 2.42( BUDGET(9( AbujaMLokoja(Road( ONMGOING( 85.40( BUDGET(&(SUREMP(10( TotoMNasarawaMAbaji(Road( ONMGOING( 0.34( BUDGET(11( DualizaJon(of(OnithsaMOwerriSecJon(II(C/N.5660( COMPETED( 1.65( BUDGET(12( RehabilitaJon(of(KadunaMKano(Road( NEW( 66.30( BUDGET(13( DualizaJon(of(KanoMMaiduguri(Road( ONMGOING( 96.73( BUDGET(&(SUREMP(14( RehabilitaJon(of(MaiduguriMDikwaMGamboru(Road(SecJon(II:(DikwaMGamboru(in(Bornu(State(ONMGOING( 12.68( BUDGET(15( RehabilitaJon(of(OkeneMAjaokuta(Road( ONMGOING( 2.76( BUDGET(16( RehabilitaJon(of(ApapaMOshodi(Expressway(in(Lagos( ONMGOING( 69.54( BUDGET(17( RehabilitaJon(of(EnuguMPort(Harcourt(Dual(Carriageway( NEW( 57.00( BUDGET(&(SUREMP(18( RehabilitaJon(of(FuntuaMYashiMDayiMKano(State(Border(Road(C/N.5264( ONMGOING( 1.22( BUDGET(19( RehabilitaJon(of(LafiaMObiMAweMTunga(Road((in(Nasarawa(State( ONMGOING( 4.82( BUDGET(20( ShagamuMBenin(Expressway( ONMGOING( 80.46( BUDGET(&(SUREMP(21( DualizaJon(of(IlorinMJebbaMMokwaMTeginaMKaduna( NEW( 580.00( PPP(22( DualizaJon(of(EnuguM9th(MileMOtukpoMMakurdi(with(a(Spur(through(OtukpaMLokoja.(NEW( 54.00( PPP(23( ApakunMMurtala(Muhammed(InternaJonal(Airport(road(,(Lagos( NEW( 10( PPP(24( ConstrucJon(of(a(Bridge(across(River(Niger(at(Nupeko( NEW( 80( PPP(25( Others( (( 97.60( BUDGET(TOTAL( 1,581.07( ((
  20. 20. ©2013,FederalMinistryofWorks 20Stakeholder(Engagements(During the last 12 months, the Ministry conducted the followingstakeholdersengagements:!  MeeJng( with( Contractors( and( other( Stakeholders,( held( in( October,(2012;(!  Public( Private( Partnership( (PPP)( Procurement( Seminar( with(Stakeholders,(held(in(November,(2012;(!  MeeJng(with(COREN;(!  MeeJng(with(Nigerian(Society(of(Engineers(in(May,(2012;(!  MeeJng(with(SURCON;(!  MeeJng(with(the(AFDB(led(by(Country(RepresentaJve;(!  MeeJng(with(the(World(Bank(FRDP(Team(led(by(the(Country(Director,(held(in(may,(2012,(October,(2012(and(December,(2012;(!  MeeJng(with(Tanker(and(Road(Workers(
  21. 21. ©2013,FederalMinistryofWorks 21Stakeholder(Engagements(MeeJng(with(the(AFDB(led(by(Country(RepresentaJve
  22. 22. ©2013,FederalMinistryofWorks 22Stakeholder(Engagements(MeeJng(with(Nigerian(Society(of(Engineers(in(May,(2012
  23. 23. ©2013,FederalMinistryofWorks 23Stakeholder(Engagements(MeeJng(with(Tanker(and(Road(Workers
  24. 24. TheMinistryconductedthequarterlymonitoringvisitsandalsoparXcipatedinthefollowingmonitoringexercise:©2013,FederalMinistryofWorks 24Monitoring(Visit(Conducted(&(Reports(Issued:($  The( 1st,( 2nd( ,( 3rd( and( 4th( Quarters’( Monitoring( Exercise;( the(reports( of( the( 1st,( 2nd( and( 3rd( quarters( were( prepared( and(forwarded( accordingly,( while( the( 4th( quarter( report( has( been(collated(for(producJon($ Carried( out( a( monitoring( exercise( on( some( of( FERMA’s(selected( road( maintenance( projects( and( the( report( have(already(been(collated($ Carried( out( joint( monitoring( exercise( on( some( selected(Federal(Roads(Network(in(collaboraJon(with(Office(of(the(Secretary(to(the(Government(of(the(FederaJon(and(Budget(Office(of(the(FederaJon(
  25. 25. Duringtheperiodunderreview,theMinistryorganized/aoendedthefollowing:©2013,FederalMinistryofWorks 25%  Seminar to set up a Right-of-Way Community wasorganized to sensitize the staff of the Ministry andgeneral public on the right of the Ministry over themanagement of Right-of-Way on all FederalHighways within the country;!%  Meeting of Directors of Planning, Research andStatistics organized by the Office of the Head ofService of the Federation in collaboration withNational Planning Commission;!Conferences,(Seminars(&(Training(
  26. 26. ©2013,FederalMinistryofWorks 2619th(NaJonal(Council(on(works(in(Lagos(in(April,(2012(with(the(theme(“Towards(an(Improved(Road(sector(for(SocioMeconomic(TransformaJon”Conferences,(Seminars(&(Training(
  27. 27. ©2013,FederalMinistryofWorks 27COREN(InternaJonal(Workshop(held(at(Rockview(Hotel(Conferences,(Seminars(&(Training(
  28. 28. ©2013,FederalMinistryofWorks 28Estate(Surveyors(and(Valuers(ConferenceConferences,(Seminars(&(Training(
  29. 29. %  During( the( last( 12( months,( the(Ministry( revived( and( commenced(training( at( the( three( (3)( Nos.(Highway( Training( Centres( in(Kaduna( in( Kaduna( State,( Badagry(in(Lagos(State(and(Ugoneki(in(Edo(State.(©2013,FederalMinistryofWorks 29% A( total( of( 260( Officers( benefited(from(the(Local(Training(programme,(9( officers( aqended( Overseas(Courses,( and( 86( officers( benefited(from( the( trainings( programmes(organized( by( OHCSF( and( other(training(InsJtuJons.((Lecture&session&on&training&for&soil&CBR&test&at&the&Highway&Training&Centre&Kaduna&Conferences,(Seminars(&(Training(
  30. 30. ©2013,FederalMinistryofWorks 30Conferences,(Seminars(&(Training(Training&on&the&use&of&Total&Sta=on&at&the&Highway&Training&Centre&Ugoneki&&Training&prac=cals&on&soil&CBR&test&at&the&Highway&Training&Centre&Badagry
  31. 31. ThefollowingOfficialengagements(bothdomesXcandforeign)werecarriedoutin2012©2013,FederalMinistryofWorks 31Official(Engagements:(2) ( Infrastructure( Conference(held( in( Washington( D.C.( United(States(of(America(and(China(aimed(at( promoJng( Direct( Foreign(Investment( (FDI)( in( the( Nigeria’s(infrastructural(sector;(3) ( Engaged( the( Media( on(Govt.(commitments(on(the(flooded(areas( and( conducted( roads(inspecJons( on( impacted( Highways(resulJng(from(flooding( (of(parts(of(the(country.(1) ( MeeJng( with( DFID( on(the(2013(Gender(Budget(of(the(Federal( Ministry( of( Works( and(its( Parastatals( in( line( with( the(Federal( Government( and( DFID(iniJaJve( as( regards( the( four(idenJfied( key( MDAs( to( deliver(concrete( results( for( girls( and(women(in(2013(Gender(Budget;(
  32. 32. US-Nigeria Infrastructure Summit in Washington DC,October 2012©2013,FederalMinistryofWorks 32Official(Engagements:(
  33. 33. •  Hon.(Minister(of(Works(visit(to(India’s(Minister(of(Road(TransportaJon(and(Highways(during(a(Working(Tour(in(New(Delhi,(India(in(March(2012(©2013,FederalMinistryofWorks 33Official(Engagements:(
  34. 34. Meeting with Infrastructure Leasing & Financial Services Limited(IL&FS) in February, 2012 at their office in India(©2013,FederalMinistryofWorks 34Official(Engagements:(IL&FS is one of Indias leading infrastructure development and financecompanies. IL&FS is widely recognised as the pioneer of Public PrivatePartnership in India
  35. 35. ©2013,FederalMinistryofWorks 35SECTION(C(–(KEY(OUTPUTS(
  36. 36. (Programmes(and(IniJaJves(Put(in(Place:((TodeliveronMr.President’sTransformaXonAgendaintheroadsector,theMinistryputinplacethefollowinginiXaXves:M36©2013,FederalMinistryofWorksINITIATIVES((Prepared(dras(Bills(for(the(Establishment(of(the(Road(Fund(and(the(Federal(Roads(Authority(OperaJon(Safe(Passage(((Strategic(Highway(Investment(for(TransformaJon((SHIF)A(New(Template(for(Interim(CerJficates((Permanent(Works(only)(Approved(the(use(of(bitumen(emulsion(in(place(of(cutMback(bitumen(on(all(road(projects(in(line(with(the(Kyoto(Protocol(to(discourage(emission(Bold(Approach(to(Road(Development(DocumentaJon(and(training(of(455(engineers(and(technical(officers(recruited(by(the(Federal(Civil(Service(
  37. 37. ©2013,FederalMinistryofWorks 37Treasury(Funded(Projects:(M(168(road(projects,(mostly(abandoned.(Where(‘we’(were(in(Jan.(2012(At( the( beginning( of( 2012,( the( Ministry’s( 168Nos.(onMgoing( road( projects( at( various( stages( of(compleJon,( were( prioriJzed( to( 80( Nos.( projects.(Within( 12( months( of( assumpJon( of( duty( as( Hon.(Minister( of( works,( the( Ministry( under( my((leadership( progressed( 32Nos.( road( projects( to(substanJal(compleJon.((!  35%(of(projects(have(been(Completed(!  20%(are(proposed(for(alternaJve(funding(under(the(PPP(Scheme.(!  7%(of(projects(are(@(Procurement(Stage(at(the(PPP(department(and(RSDT(Unit(of(the(Ministry.(!  38%( of( the( projects( are( onMgoing( at( various(stages(of(compleJon(.(80Nos.(OnMGoing(Road(Projects(35%(38%(20%(7%(
  38. 38. 0(15(30(45(60(75(90(105((Km)(Achieved(in(2012( Total((Km)(Achieved(to(Date( Total(Length(©2013,FederalMinistryofWorks 38Achievements(in(2012:(M((•  A(total(of(651km(of(roads(was(paved(in(bituminous(layers(in(2012(under(the(Ministry.(Below(is(a(graphical( (presentaJon(of(some(of(the(roads(depicJng(progress(achieved(in(kilometers(over(the(last(twelve(months.(Road(Length((km)(196km( 552.7km(234.2km(324km(154.6km(125km(
  39. 39. ©2013,FederalMinistryofWorks 39Completed(Projects(CompleJon(of(32(OnMgoing(Road(Projects(with(details(as(follows:(!  RehabilitaXon of FuntuaMGusauMSokoto road (secXon II:GusauMTalataMafara)C/NO.5694!  RehabilitaXon of ObiozaraMUburuMIshiagu Road C/NO.5828!  AccessroadtoKaduna(Refinery(C/NO.6027!  RehabilitaXon of OmuoMIfaki( road in EkiX State, C/NO.5999!  RehabilitaXonofUbaMMbalalaroadC/NO.6062!  DualizaXonofIbadanMIlorinroadsecXonI(IbadanMOyo)C/NO.1793!  EmergencyreinstatementofcollapsedsecXonofGombeMPoJskum(Road,(KM12)inGombeStateC/No.6121IbadanMIlorin(DualizaJon(Sec.(1(UbaMMbalala(road(GomdeMNumanMYola(road(
  40. 40. ©2013,FederalMinistryofWorks 40!  RehabilitaXon/ReconstrucXon of Lafenwa( Bridge( inAbeokutaC/NO.6064!  RehabilitaXon of GombeMNumanMYola road secXon II:NumanMGombeinAdamawa/GombeStates,C/NO.5979!  Repairs of Third( Mainland( Bridge( Phase( II, AddiXonalworks for the repairs of 8No. expansion joints in LagosState C/No. 6125 (This was completed 10 days ahead ofscheduledcompleXondate.)!  RehabilitaXon of Oqa–Owode( road( in Ogun State, C/No.6022!  Limited RehabilitaXon of ShagamuMAjebandele( road inOgunState,C/No.6012!  EmergencyreinstatementofgullyerosionatKM127+000alongBeninMOkeneroadRoute50(A2)&KM14+000alongAuchiMAgenebodeRoadinEdoStateC/No.6120The image cannot be displayed. Your computer may not have enough memory to open the image, or the imagemay have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you mayhave to delete the image and then insert it again.Repairs(of(Third(Mainland(Bridge(The image cannot be displayed. Your computer may not have enough memory to open the image, or the imagemay have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you mayhave to delete the image and then insert it again.Completed(Projects(Reinstatement(of(BeninMOkene(gully(erosion(ShagamuMAjebandele(road(Sec.(II(
  41. 41. ©2013,FederalMinistryofWorks 41!  RehabilitaXon of AnkaMDaki( TakwasMGummi road inZamfaraState;C/NO.6090!  PeriodicmaintenanceofJebbaMLafiajiRoadinNigerStateFRDP/2010/NCB/W/01!  Periodic maintenance of Takai M Albasu M Gaya Road inKanoStateFRDP/2010/NCB/W/02!  Periodic maintenance of Hong M Mubi Road in AdamawaStateFRDP/2010/NCB/W/04!  RehabilitaXon of MararabaMPambeguwaMSaminakaMJos(roadsecXonI(MararabaMPanbeguwainKadunaState)C/NO.5996!  RehabilitaXonofaccessroadstoWarri(RefineryinWarri,DeltaState;C/NO.6051!  Periodic maintenance of Nafada – Gombe Abba Road inGombeStateFRDP/2010/NCB/W/03KurfiMChiranchi(road(JebbaMLafiaji(road(Access(road(to(Kaduna(Refinery((Completed(Projects(
  42. 42. ©2013,FederalMinistryofWorks 42!  PeriodicmaintenanceofOkpalaMIgwuritaRoadinImoStateFRDP/2010/NCB/W/06!  PeriodicmaintenanceofAdoMIlumobaMAgbadoMIkareRoadSecXonAinEkiXStateFRDP/2011/ICB/PMW/07!  PeriodicmaintenanceofDingayaMGalambiMRungoRoadinSokotoStateFRDP/2011/ICB/PMW/08!  Periodic maintenance of Rumukurshi M ChokochoRoadinCrossRiverStateFRDP/2011/ICB/PMW/09!  Periodic maintenance of Akure M Owo Road inOndoStateFRDP/2011/ICB/PMW/10!  PeriodicmaintenanceofAdoMIlumobaMAgbadoMIkareRoadSecXonBinEkiXStateFRDP/2011/ICB/PMW/11GombeMNafadaMAbba(road((The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may havebeen corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to deletethe image and then insert it again.ObiozaraMUburuMIshiagu(road((Completed(Projects(LafiaMDoma(road((
  43. 43. ©2013,FederalMinistryofWorks 43!  PeriodicmaintenanceofLafiagiMMokwaRoadinNigerStateFRDP/2011/ICB/PMW/12!  Periodic maintenance of EastWest M OdiRoadinBayelsaFRDP/2011/ICB/PMW/13!  Periodic maintenance of Lafia M Doma Road inNassarawastateFRDP/2011/ICB/PMW/14!  ReconstrucXon of AbakalikiMMbok (OgojaJuncXon)SecXonofRoute25/A.343(Lot1)!  Pavement Strengthening of IkomMMfumSecXonofRoute90/A.4M2(Lot2).!  Periodic maintenance of Kurfi M ChiranchiRoad in Katsina State FRDP/2010/NCB/W/05AbakalikiMMbok((Ogoja(JuncJon)(road((IkomMMfum(road(DingayaMGalambiMRungo(road(Completed(Projects(
  44. 44. !  Also( the( Ministry( completed( the( sevng( up( of( a( design( office( and(equipping( same( with( contemporary( hardware( and( sosware( (The& first&ever&design&office&in&the&Ministry)(©2013,FederalMinistryofWorks 44Completed(Projects(
  45. 45. !  Following(the(recent(effects(of(floods(in(some(parts(of(the(country,(the(Ministry(intervened(by(carrying(out(the(following(works:(©2013,FederalMinistryofWorks 45$ ConstrucXonof75MspanbridgeatKolo,alongYenegoa–Kolo–Nembe–BrassRoadF227,spurtoKolotown,Bayelsastate.$ ConstrucXonoftwobridgesatCH.11+850(twospan)&CH.12+850(threespan)alongKano–KatsinaHighwaytoreplacecollapsed7celland11cellboxculvertrespecXvely.$ ReinstatementofWashoutonBridgeapproach&EmbankmentatCH.0+100alongShendam–Yelwa–IbiRoad,PlateauState$ ReinstatementofEmbankmentWashoutatCH.15+025alongLangtangMLalin–Tunkus–ShendamRoad,PlateauState$ ReinstatementofwashoutandreconstrucXonofcollapsedtriplecellculvertat4thInterchange,Enugu–PortHarcourtDualCarriageway.•  POST(FLOODING(INTERVENTIONS(IntervenJon(along(KanoMKatsina(rd.(IntervenJon(along(ShendamMYelwaMIbi(rd.(
  46. 46. ©2013,FederalMinistryofWorks 46•  OPERATION(SAFE(PASSAGE:(M(With(the(support(of(Mr.(President,(the(Ministry( was( able( to( embark( on(OperaJon( Safe( Passage( in( 2012.( The(programme( which( is( unprecedented((aimed(at(recovering(deplorable(secJons(of( our( major( roads( to( ameliorate( the(sufferings( usually( experienced( by( road(users(during(the(fesJve(period(ranging(from(December,(2012(to(January,(2013.(A(total(of(32No.(roads(along(the(Federal(roads( network( were( idenJfied( and(recovered(within(the(period.(
  47. 47. ©2013,FederalMinistryofWorks 47OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((A)  North(Central(Zone(%  AbujaMLokojaMOkenerd(2SecXons)%  Ilorin–Jebba–MokwaMTeginaMKadunard(4SecXons)%  SulejaMMinnard(1SecXon)%  LafiaMMakurdi–Aliade–OturkpoM9thMileroad(4SecXons)%  EmergencyreconstrucXonof3collapsedbridges/culvertsinPlateauState(3SecXons)LafiaMMakurdi(–(Aliade(–(Oturkpo(road(JebbaMMokwa(rd.(IlorinMJebba(rd.(km(92+190(B) (North(East(Zone(%  ReinstatementofwashoutandconstrucXonofdouble3mx3mculvertatkm7+850Mkm8+000(longvelbridge)alongShendamMYelwaMIbiMTarabaStateBorderinPlateauState(1SecXon)%  Replacementof3Nos.CulvertinJalingoMKonaMLaurd(1SecXon)
  48. 48. ©2013,FederalMinistryofWorks 48OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((C)(((North(West(Zone(%  KanoMZariaMKadunaroad(2SecXons)%  KanoMBichiMKatsinaMJibiaNigerborderroad(2SecXons)(D) (South(East(Zone(%  EnuguMOkigweMUmuahiaMAbaMPortHarcourtroad(3SecXons)%  AbaMIkotEkpeneroad(1SecXon)EnuguMOkigwe((Km65(+(284(OkigweMUmuahia((Km85(+(000(
  49. 49. ©2013,FederalMinistryofWorks 49OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((B)(((South(South(Zone(%  OdukpaniMIturoad(1SecXon)%  OkeneMAuchiMBeninroad(2SecXons)%  IrruaMIlushiroad(1SecXon)C)(((South(West(Zone(%  LagosMIbadanexpressway(2SecXons)%  IbadanMIlorinroad(2SecXons)%  ApapaMOshodiroad(2SecXons)Odukpani(JuncJon( IbadanMIlorin(road(ShagamuMIbadan(Expressway(LagosMShagamu(Expressway(
  50. 50. ZONAL(PROJECT(BUDGET((bn)(North(Central((NC)( North(East((NE)(North(West((NW)( South(East((SE)(South(South((SS)( South(West((SW)(OnMGoing(Projects(Funded(by(the(Treasury(©2013,FederalMinistryofWorks 50S/N( ZONE(NUMBER(OF(PROJECTS(LENGTH((KM)(PROJECT(COST((bn)(1 NorthCentral 31 1,054 262.32 NorthEast 30 1,461 332.93 NorthWest 23 1,028 255.54 SouthEast 40 978 149.65 SouthSouth 34 876 159.46 SouthWest 37 1,230 236.9TOTAL( 195( 6,628( 1,397(•  TheFMWhasatotalof195onMgoingprojectsamounXngtoaporuolio of N1.397 Trillion. The summary of the projects onZonalbasisisshownbelow262.3(B((NC)(332.9(B((NE)(255.5(B((NW)(149.6(B((SE)(159.4(B((SS)(236.9(B((SW)(
  51. 51. (LOOKING(AHEAD:(The(Inevitability(of(Paradigm(SHIFT((In line with the new policy IniXaXves, the Ministry has adopted a newparadigm,“Strategic(Highway(Investment(for(TransformaJon((SHIFT)”.(Thiswillentailashiin:M51©2013,FederalMinistryofWorksInsJtuJonal(Structure(Ownership(from(Public(to(Private(through(PPP(SHIFT(CollaboraJon(with(Devt(&(MulJMlateral(Agencies((RSDT)(Introduce(Annuity(ContracJng(
  52. 52. ©2013,FederalMinistryofWorks 52BOLD(APPROACH(TO(ROAD(DEVELOPMENT(BOLD(HolisJc(Improvement(&(Expansion(of(ExisJng(economic(routes(Strategic(Increase(of(Federal(Roads(Network(Consequently,theMinistryhasbeenchampioningaBOLDapproachinthedevelopment and improvement of Our Federal Roads network in the lastoneyear.OurBOLDApproachentails:1.(OnMGoing(RehabilitaJon(of(exisJng(Dual(Carriageway(Highways(%  ShagamuMOreMBeninRoad%  LagosMIbadanRoad%  OnitshaMEnuguRoad%  EnuguMPortHarcourtRoad2.( OnMGoing( Upgrade( of( exisJng( Single(Carriageway(to(Dual(Carriageway(Highways(%  OnitshaMOwerriRoad(Completed)%  KanoMMaiduguriRoad(40%Completed)%  AbujaMLokojaRoad(65%Completed)%  IbadanMIlorinRoad(70%Completed)%  SulejaMMinaRoad(26.6%Completed)%  Lokoja(ObajanJuncXon)MBeninRoad(5%Completed)1.( Golden( Triangle( SuperMHighway:(M(willcompriseof4to6lanesenXrely new superMhighway# that willconnect key hubs of economic acXvity inthe country. The Super Highway whencompletedwillcutacrossabout20statesof the FederaXon & will add approx.5,000kmtothenaXonalnetworkofroadsinNigeria.(2.(2nd(Lagos(Outer(Ring(Road:(M(isconceived to reduce the currentchaoXctrafficcomingfromthePort&Tank Farms within the Lagosmetropolis.(Massive(intervenJon(on(failed(federal(roads(across(the(country(Massive((integrity(assessments((and(repairs(of(bridges(&(replacement((of(guard(rails(
  53. 53. •  The finance of road projects has beenthrough budgetary provisions which havebeen too inadequate to fund the projectsandmostovennotfullyimplemented.•  Outlay of annual funding againstrequirementishighlightedbelow:©2013,FederalMinistryofWorks 53Road(Financing(Mechanism:(M(•  The addiXonal funding of N85.5b fromSUREMP in 2012 helped to reduce thefundinggapintheRoadSector.•  The Ministry is currently working onalternaXve ways of funding HighwayinfrastructurebytheFederalGovernment.2012(Budget(Provision(&(Release(for(Road(Projects(in((%)(In(2012,(out(of(the(budgetary(provision( of( N133b( for(highway(projects,(only(N102b((77%)( was( released( with( a(shoryall(of(N31b.(AnnualFundingRequirement N500billion(AverageAnnualBudgetaryProvisionN120billion(AddiXonalFundingRequired N380billion(77%(23%(Amount(Released( Shoryall(Such(shoryalls(have(negaJve(consequences(for(Road(development(
  54. 54. •  The(FMW(in(2012(received(addiJonal(funding(of(N85.5(billion(from(the(SUREMP(for(selected(projects.(The(project(details(are(as(follows(©2013,FederalMinistryofWorks 54Road(Financing(Mechanism((Contd.):(M(S/N( PROJECT(DESCRIPTION( 2012(SUREMP(PROVISION((N)(1 DualizaXon of AbujaMAbajiMLokoja road (4secXons)25.0bn2 ReconstrucXonofBeninMOreMShagamu(3secXons)22.5bn3 RehabilitaXon of OnitshaMEnuguMPort Harcourtroad(3secXons)8bn4 DualisaXonofKanoMPoXskumMMaiduguriroad(5secXons)20bn5 ConstrucXon of Loko/Oweto bridge acrossBenueRiver5bn6 ConstrucXon of 2nd Niger bridge at Onitsha/Asaba5bnTOTAL( 85.5bn(
  55. 55. Some( of( the( alternaJve( sources( of( funding( Highway(infrastructure(being(explored(by(the(Ministry(include:(M(©2013,FederalMinistryofWorks 55$ Borrowing( from( MulJlateral(Agencies(and(Pension(fund(for(key(Economic( Highways( Infrastructure(that(can(Repay(the(Capital($ FloaJng( of( Road( Bonds( for(Highway(projects($  ConvenJonal( PPP( Finance(Contracts($ Viability( Gap( Funding( through( the(Road(Fund((when(created)(
  56. 56. (60%((40%(©2013,FederalMinistryofWorks 56SHIFT(to(PublicMPrivate(Partnership((PPP):(•  ThePPPDepartmentisundertakingcomprehensivestudiesofproposedPPPprojectstodeterminetheviabilityofeachproject.Theprogressmadein2012onPPPprojectsisasfollows:•  60%(are(awaiJng(“No(ObjecJon”(from(ICRC(to(Proceed(•  40%(are(at(Procurement(Stage(Progress(on(PPP(Projects(
  57. 57. ©2013,FederalMinistryofWorks 57#  The# following# PPP# Projects# are# under#procurement#at#the#following#stages:;PPP(PROJECTS(UNDER(PROCUREMENTConstrucJon( of(2nd( Niger( bridge(at(Asaba/Onitsha Access( ( Road( to(M u r t a l a(M o h a m m e d(I n t e r n a J o n a l(Airport(Road,(Lagos ConstrucJon(of(a(bridge(over(River(Niger(at(Nupeko,(Niger(StateThe( Ministry( has( concluded( the(process(for(award(of(the(PPP(project(&(a(concessioner((JBNMAIIM)(emerged(as( the( preferred( Bidder( and( a( leqer(of(Intent(given(to(the(ConsorJum.(OBC( Completed( and( RFPs( issued( to(shortlisted( ConsorJa( have( been(returned(and(is(undergoing(analysis.(A(preferred(bidder(will(be(announced(shortly ((OBC( Completed( and( RFPs( issued( to(shortlisted( ConsorJa( have( been(returned(and(is(undergoing(analysis.(A(preferred(bidder(will(be(announced(shortly ((
  58. 58. ©2013,FederalMinistryofWorks 58PROPOSED&PPP&HIGHWAY&PROJECTS&WITH&OBC&&COMPLETED&# OBC# has# been# completed# by# the# TA# for# all# the# under# listed#projects.#The#Ministry##is#awaiBng#a#“No#ObjecBon”#from#ICRC#to#proceed.#"  Lagos&–&Iseyin&–&Kishi&–&Kaiama&Road&&Q&414#Km##&("  Kaiama&–&Bahama&–&Kaoje&–&Gwambu&–&Fokku&–&Sokoto&Road&Q&631#Km#("  Construc=on&of&a&bridge&over&River&KatsinaQAla&at&Buruku,&Benue&State&Q&1#Km#("  Construc=on& of& a& bridge& over& River& Benue& at& Ibi&along&Shendam&Q&Wukari&Road.&(
  59. 59. TheMinistryaspartofitsBOLDapproachtoroaddevelopmenthasplanstodevelopegreenfieldprojectstobridgethehugegapinRoadInfrastructureinNigeria.ThetwomajorprojectsthathavebeenidenXfiedare:©2013,FederalMinistryofWorks 59PPP(PROJECTS(ON(THE(DRAWING(BOARD(1.  The(Golden(Triangle(SuperMHighway(2.  The(2nd(Lagos(Outer(Ring(Road(Golden(Triangle(SuperMHighway(TheGoldenTriangleSuperMHighwayisoneoftheprojectsconceivedtobridgethehuge gap in Road Infrastructure in the country, thereby reinforcing theTransformaXon Agenda of the President Jonathan’s AdministraXon.( The GoldenTriangleSuperMHighwaywillbeprivatesectordriven,andatminimalmanagerialcosttotheFederalGovernment.(TheFederalGovernmentissimplyrequiredtocreatetheenablingenvironment,providetheRightofWay(ROW)andofferguaranteesinformofViabilityGapFunding(VGF)wheneverrequired.ThemajoralignmentoftheGoldenTriangleiscomprisedofthreesegments,namely:Lagos–PortHarcourtsegment(Coastalalignment)–approx.560km,(PortHarcourt–Kanosegment–approx.800km,and(Lagos–Kanosegment–approx.870km.(
  60. 60. ©2013,FederalMinistryofWorks 602nd(Lagos(Outer(Ring(Road(The 2nd Lagos Outer Ring Road, which is 73.2km in length, isconceivedtoreducethecurrentchaoXctrafficsituaXonwithintheLagosmetropolis.(AllTrucks/TankersoriginaXngfromthePortsandTankfarmswillbedivertedtotheRingRoadtoreducethecurrenttraffic gridlock being experienced on ApapaMOshodi Expresswayamongothers.(TherouteisdividedintotwosecXons;SecXon1:TinCanIsland–Igando–Lagos/Ooaroadinterchange–Lagos/Ibadanexpressway;SecXon2:Lekki–Ikorodu–Shagamu/Beninexpressway.TheProjectisconceivedtobeimplementedinpartnershipwiththeLagosandOgunStateGovernments.PPP(PROJECTS(ON(THE(DRAWING(BOARD((Contd.)(
  61. 61. KANO(MAIDUGURI(KADUNA(ABUJA(LOKOJA(BENINASABA/(ONITSHA(ENUGU(PORT(HARCOURT(WARRI(SHAGAMU(LAGOS(ILORIN(OGBOMOSO(OYO(EXISTING(DUAL(CARRIAGEWAY(LEGENDKEFFI( AKWANGA(IBADAN(ILESHA(MAKURDI(OTURKPO(MOKWA(JEBBA(TEGINA(BIRNIN(GWARI(JOS(KATSINA(MINNA(BAUCHI(POTISKUM(GOMBE(YOLA(OTTA(SOKOTO(AJAOKUTA(ONMGOING(DUALIZATION((EXISTING,(ONMGOING(&(PLANNED(FUTURE(DUAL(CARRIAGEWAYS(SINGLE(CW((PLANNED(FOR(FUTURE(DUALIZATION(
  62. 62. ©2013,FederalMinistryofWorks 62GOLDEN((ECONOMIC)(TRIANGLE(SUPERMHIGHWAY(
  63. 63. ©2013,FederalMinistryofWorks 63CollaboraJon(with(MulJMLateral(Agencies(through((ROAD(SECTOR(DEVELOPMENT(TEAM((RSDT)((
  64. 64. ©2013,FederalMinistryofWorks 64RSDT(Projects(Financed(by(IDA:(M(Under the framework of the FRDP, RSDT iscurrently implemenXng road rehabilitaJon,upgrading and( maintenance, insJtuJonal(strengtheningandpolicy(reform,androad(safety(improvements with the credit from the WorldBank; and addiXonal funding from the AfricaDevelopmentBank(AfDB)fortherehabilitaXonoftwo road secXons under the NigeriaMCameroontransport facility project (Abakaliki( M( Ogoja(JuncJon( road Route 25/A.343 and IkomMMfumroadRoute90/A.4M2).WorksinthesetwosecXonshave been completed. One of the secXons i.eIkomMMfumisbeingproposedasapilotprogramfortheOPRCmaintenanceconcept.These( projects( are( being( executed( with( 90%(World(bank(funding(and(10%(counterpart(funding(from(the(Nigerian(Government.((
  65. 65. 45%(45%(10%(©2013,FederalMinistryofWorks 65REHABILITATION/MAINTENANCE(PROJECTS(M(RSDT%  45%(of(Project(have(been(Completed(%  45%(of(Project(are(OnMGoing(%  10%(are(Under(Procurement(Stage(21No.((RehabilitaJon/Maintenance(Projects(by(RSDT($  The(RehabilitaJon(projects(Under(RSDT(are:(%  Enugu(–(Abakaliki(Road:(M(Project(OnMGoing((24%(Completed/(18km)(%  Ogoja(JuncJonMIkom(Road:(M(Project(OnMGoing((32%(Completed/(16km)(%  MokwaMBida(Road:(M(Project(OnMGoing((Bids(have(been(announced(to(be(awarded(in(June(2013)(%  AkureMIlesha(Road:(M(Project(OnMGoing((Bids(have(been(announced(to(be(awarded(in(June(2013)(%  Abakaliki(–(Ogoja(juncJon(Road:(M((Completed(100%/(85km)(%  Ikom(M(Mfum(Road:(M((Completed(100%/(25km)(
  66. 66. ©2013,FederalMinistryofWorks 66Road(Length((km)(The(RSDT(in(collaboraJon(with(MulJMLateral(Agencies(rehabilitated/maintained(a(total(of(257km(of(road(length(in(2012.(Below(is(a(graphical( (presentaJon(of(the(roads(depicJng(progress(achieved(in(kilometers(over(the(last(twelve(months.(REHABILITATION/MAINTENANCE(PROJECTS((Cont.)0(20(40(60(80(100((km)(Achieved(in(2012( ( ( ( ( ( ( ( ( OnMgoing( projects( while( the( rest( have( been(completed(
  67. 67. ©2013,FederalMinistryofWorks 67&INSTITUTIONAL&STRENGTHENING,&POLICY&REFORM&&&&CAPACITY&BUILDINGQ&RSDT%  Review(of(NaJonal(Road(Design(Standards((6months(duraJon)(–CommencedinAugust2012%  Development( of( an( Asset( Management(System( (2years( duraJon)( – Commenced inSeptember2013%  CalibraJon( and( AdaptaJon( of( HDMM4( (for(planning( and( prioriJzaJon( purpose( with(9months( duraJon)( – Commenced inOctober2012%  Provision(of( (GOODS(AND(EQUIPMENTS(to(Pavement( EvaluaJon( Unit( &( Bridge(Maintenance(Unit(of(the(Ministry
  68. 68. ©2013,FederalMinistryofWorks 68&ROAD&SAFETY&COMPONENTQ&RSDT!  Procurement of CommunicaXon andRoadSafetyEquipment!  Procurement of Vehicles andEquipment!  Procurement of Consultancy servicesfor Capacity Building and TrainingProgram!  ConstrucXonofSix(6)No.PedestrianOverheadBridgesinAbuja,FCT.!  Support to Federal Capital TerritoryAdministraXon(FCTA)onRoadSafetyIntervenXon
  69. 69. ©2013,FederalMinistryofWorks 69RSDT(Projects(Financed(by(AfDB:(M(Under the NigeriaMCameroon MulXnaXonalHighway and Transport FacilitaXon Programmefor the BamendaMMamfeMEkok /MfumMAbakalikiMEnugu Corridor, RSDT has concluded thereconstrucXon of Ogoja( JuncJon( –( Abakaliki(SecXonofRoute25/A.343(Lot1)andPavementStrengthening of IkomMMfum SecXon of Route90/A.4M2 (Lot 2). Lot 1 is currently under thedefect liability warranty period while Lot 2 isbeing proposed as a pilot scheme for the OPRCconcept.!  Percentage(CompleJon(of(Project:((Lot(1 M100%completed;DefectsLiabilityPeriod(DLP)commencedinJanuary2013.Lot(2 M 100%completed;DefectsLiabilityPeriod(DLP)ended31stJuly2012.
  70. 70. ©2013,FederalMinistryofWorks 70Proposed(Project(Under(RSDT(to(be(Financed(by(China(EXIM(Bank(loan:(!  Dualiza=on&of&Keffi&Q&Lafia&Q&Makurdi&Q&Enugu&(9thMile)&Roads,& in Nassarawa, Benue and Enugu State isconceived to reduce the number of traffic relatedaccidents, provide an alternaXve to the AbujaMLokojarouteforSouthMboundtrafficandfurtherimprovesafetyonourroads.The Ministry is currently working outmodaliXes towards the execuXon of thefollowingprojectwithfundsfromtheExportMImportBankofChina.
  71. 71. ©2013,FederalMinistryofWorks 71FEDERAL(ROAD(MAINTENANCE(AGENCY((FERMA)((ROAD&MAINTENANCE&WORKS&COMPLETED&&&&IN&PROGRESS&ALONG&WITH&&THE&ZERO&POTHOLE&PROGRAMME&ON&MAJOR&HIGHWAYS&NATIONWIDE
  72. 72. ©2013,FederalMinistryofWorks 72Road(Maintenance(Projects(by(FERMA:(M(Road maintenance under the Ministry is carried out by the FederalRoadsMaintenanceAgency(FERMA).(Inthelastoneyear,Wehaveembarked on aggressive repairs of Federal Highways with theacquisiXon of FP5 Mobile Pothole Patchers and producXon of coldasphaltforpromptintervenXon.48%(of(Maintenance(Project(have(been(Completed(52%( of( Projects( are( OnMGoing( (Most( of( them,(SubstanJally(Completed.(44No.(OnMGoing(Maintenance(Projects(by(FERMA(52%( 48%(
  73. 73. ©2013,FederalMinistryofWorks 73Road(Length((km)(Road(Maintenance(Projects((Cont.):(FERMA(was(involved(in(recovering(of(road(washouts,(general(maintenance(and(vegetaJon(control( in( some( federal( highways( in( the( country.( A( total( of( 1,380KM( of( road( corridors(were(maintained(in(2012.(Below(is(a(graphic(summary(representaJon(of(some(of(the(works.(0(20(40(60(80(100(120(140(160(180(200(Length(Achieved((KM)(
  74. 74. ©2013,FederalMinistryofWorks 74110Acquired)Pothole)Patchers and)a)Pothole)Patcher in)OperationAcquired(Pothole(Patchers(A(Pothole(Patcher(in(OperaJon(in(one(of(the(35(locaJons(deployed
  75. 75. ©2013,FederalMinistryofWorks 75SECTION(D(–(KEY(OUTCOMES(DELIVERED(
  76. 76. ©2013,FederalMinistryofWorks 76Outcomes(Performance(Matrix:(S/N( Performance(Indicators( 2012((Planned(Target)(2012((Actual(as(at(Dec(2012(Improved(Travel(Time(on(Federal(Roads(1. AveragetravelXmeonFederalRoads 70km/hr 90km/hrProvision(of(Good(and(Motorable(Roads(2. Kmofroadsconstructed 454.375km1,007.29km651km976km3. Kmofroadsrehabilitated4. KmofRoadsMaintainedthroughDonorFundingGenerated100km 257km5. Area/m2ofpotholepatchedbyFERMA 862,077.17sqm 1,002,343sqm6. KmofroadsmaintainedbyFERMA 3,787km 1,380km7. No.ofbridgesconstructed 15No. 5No.8. No.ofbridgesmaintained 33No. 28No.Level of Performance on the Outcome Indicators Agreed, as per the 2012 MinisterialPerformanceContract:Note:M(If(the(2012(budget(of(the(Ministry(was(fully(released,(set(targets(for(items(3,(6,(7(&(8(would(have(been(substanJally(met.(
  77. 77. ©2013,FederalMinistryofWorks 77Outcomes(Performance(Matrix((ConJnued):(S/N( Performance(Indicators( 2012((Planned(Target)(2012((Actual(as(at(Dec(2012(Provision(of(Comfort(and(Safety(to(Road(Users(9. Noofsignageandsafetyfeaturesinstalled;$  No.ofRoadSigns$  KmofRoadMarkings4401,461.665km176No58Km10. Lmofbridgeswithguardrails 4,120lm 1,130lm11. Lmofroadswithsurveillance 34,120km 34,120km12. Rateofaccident 3,998 4,183Provision(of(Policy(Regulatory(and(AdministraJve(Services13. NoofPolicyIniXaXveimplemented 7 714. NoofM&EReportsproducedanddisseminated4 415. Noofstakeholdersengagementsundertaken4 6i.  Note:M(Item(9(was(hampered(due(to(the(removal(of(the(budgetary(provision(of(750m(by(NASS(ii.  While(we(thought(the(improvement(in(the(road(network(would(lead(to(a(reducJon(of(accident,(FRSC(has(reported(a(slight(increase(due(to(overMspeeding(and(poor(driving(habits(
  78. 78. ©2013,FederalMinistryofWorks 78Outcomes(Performance(Matrix((ConJnued):(16. NoofGovernmentstafftrained 400 71517. DonorFundingGenerated(N) N10,850,000,000.00($70M)N12,400,000,000.00($80M)18. NumberofJobsCreated 3,555 3,660(+720FERMASUREMP)19.20.21.NoofMapsproduced:MBoundary(DemarcaJon:((I)  InternaXonalBoundariesII)  InterstateBoundariesRight(of(Way:(I)  RailII)  RoadFlood(Plains(5,568(51%OnMgoing)2,100km(500km)2,277km(296km)304.8km(141km)1,870.45km(410km)ConXnuousimplementaXonofthe2011project3861,979km(376km)2,206km(225km)223.8km(60km)1,530.45km(70km)FloodPlainMonitoringofUsmanRiverwithinKubwa&IdenXficaXonofcommunitypronetofloodinginCrossRiverstate
  79. 79. ©2013,FederalMinistryofWorks 79Outcomes(Performance(Matrix((ConJnued):(22.23.24.25.Topographic(Maps(and(Others:(Establishment(of(Core(StaJon((ConstrucJon(of(Control(Beacons:(I)  PrimaryBeaconsReplacement(on(Control(Pillars(((DigitalStreetGuideMapsof8StatecapitalsEstablishmentof2NewlocaXons882186StatesEstablishmentat2LocaXons(KanoandOwerri)6317026. NumberofSurveyorsRegistered 90 6527. NumberofEngineersRegistered 2,550 2,173Note:M(FMW(conJnues(to(experience(challenges(in(Road(Signs(&(Markings(as(NASS(conJnues(the(pracJce(of(removing(proposed(sums(on(these(items(from(the(budget(
  80. 80. ©2013,FederalMinistryofWorks 80Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(S/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((1DUALISATIONOFABUJAMABAJIMLOKOJAROAD(SECTION1,INTERNATIONALAIRPORTLINKROADJUNCTIONMSHEDAVILLAGEJUNCTION)C/NO.5862ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr12.0016.0012,846.49159244090km/hr26.4029.7515,045.49236474630km/hr14.413.752,200.007723032DUALISATIONOFABUJAMABAJIMLOKOJAROAD(SECTION11,SHEDAVILLAGEJUNCTIONMABAJI)C/NO.5863ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr014.4014,439.00152323490km/hr1560.0028,890.00156463530km/hr1545.6014,451.0041(BridgesCompleted)401
  81. 81. ©2013,FederalMinistryofWorks 81Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(S/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA( (JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012(( 3DUALISATIONOFABUJAMABAJIMLOKOJAROADSECTIONIII(ABAJIMKOTONKARFI)C/NO.5884ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hrM21.5211,23097210890Km/hrM29.7523,742.00105219930Km/hr8.2312,5128091 4DUALISATIONOFABUJAMABAJIMLOKOJAROADSECTIONIV(KOTONKARFIMLOKOJA)C/NO.5885ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr19.7025.30651.2064725490km/hr20.9028.305,432.0074730330km/hr1.203.004,780.80103bridgesinprogress49
  82. 82. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(S/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((5REHABILITATIONANDASPHALTOVERLAYOFBENINMSHAGAMUEXPRESSWAY(BENINMOFOSUSECTION)INEDOSTATEC/NO.5900ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr20.0043.005,000.0035070km/hr86.3987.0521,600.0020010km/hr66.3944.0514,600.00(150)6REHABILITATIONOFSHAGAMUMAJEBANDELEMOREROADSECTIONI:AJEBANDELEMOFOSUROADINONDOSTATE,C/NO.6000ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hrN/A19.66,680.03M12670km/hr0.0635.689,798.56212610km/hr0.0616.83,118.532M82©2013,FederalMinistryofWorks
  83. 83. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorksS/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((7RECONSTRUCTIONOFTHEOUTSTANDINGSECTIONSOIFBENIMOFOSUMOREMAJEBANDELEMSHAGAMUEXPRESSWAYPHASEIII,C/NO.6133ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hrMMMMM70km/hr22.2315.3592910km/hr22.2315.359298DUALISATIONOFKANOMMAIDUGURIROAD(SECTIONI,KANOMWUDILMSHUARIN)C/NO.5878ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr43.1451.3054,500.00172329395km/hr43.1455.41126,000.00190337835km/hrM4.1171,500.0018M8583
  84. 84. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorks 84S/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA( (JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((9DUALISATIONOFKANOMMAIDUGURIROAD(SECTIONII,SHUARINMAZARE)C/NO.5879ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr93.2493.20115,000.00152311595km/hr102.39105.79155,000.00167341235km/hr9.1512.5540,000.0015Completed29710DUALISATIONOFKANOMMAIDUGURIROAD(SECTIONIII,AZAREMPOTISKUM)C/NO.5880ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr97.00119.00155,000.009M34295km/hr121.97131.69160,000.0010139235km/hr24.9712.695,0001150
  85. 85. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorksS/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((11DUALISATIONOFKANOMMAIDUGURIROAD(SECTIONIV,POTISKUMMDAMATURU)C/NO.5881ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr54.0054.003,616.40124217095km/hr73.0074.0017,988.00144227435km/hr19.0020.0014,371.6020Completed10412DUALISATIONOFKANOMMAIDUGURIROAD(SECTIONV,DAMATURUMMAIDUGURI)C/NO.5869ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.60km/hr13.9864.80105,400.00221124995km/hr27.0072.20105,400.00221133135km/hr3.027.40CompletedCompletedCompleted8285
  86. 86. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorks 86S/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((13REHABILITATIONOFENUGUBOUNDCARRIAGEWAYOFTHEONITSHAMENUGUROAD,PHASEIOFSECTIONI)INANAMBRASTATEC/NO.5929ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mNo.No.No.40km/hr1.591.592,245.0017213660km/kr18.8512.832,521.0019313620km/kr17.2611.24276.0021M14REHABILITATIONOFONITSHAMBOUNDCARRIAGEWAYOFTHEONITSHAMENUGUROAD,PHASEIOFSECTIONII)INANAMBRASTATEC/NO.5929AImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesProvisionofPolicyandRegulatoryandAdministraXveServices:NumberofJobsCreated:Km/hrKmKmL/mL/mNo.No.40km/hr2,600M12160km/hr0.2564,1501512120km/hr0.2538,15015M
  87. 87. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorksS/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((15REHABILITATIONOFONITSHAMENUGUDUALCARRIAGEWAYSECTIONII(ANAMBRASTATEBORDERMENUGU)INENUGUSTATE,C/NO.5988ImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mL/mNo.No.40km/hr0.1013.6026,00070,000.008360km/hr1.3719.7929,460.0070,000.008320km/hr1.243,460.00CompletedM16REHABILITATIONOFENUGUMPORTHARCOURTDUALCARRIAGEWAYSECTIONI:ENUGUMOKIGWEINEBONYI/ABIASTATEImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmNo.No.30MM8085km(Dual)655085km(Dual)6587
  88. 88. Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(©2013,FederalMinistryofWorksS/No.(AGREEDPOLICYANDPROGRAMMEPRIORITIESFOR2012(AGREEDKEYPERFORMANCEINDICATORS(KPI)FOR2012ASRELATEDTOTHETRANSFORMATIONAGENDA((JANUARYMDECEMBER2012ACHIEVEMENTS(NOTACTIVITIES)(( ( ( UNIT(JANUARY2012(DECEMBER2012((17REHABILITATIONOFENUGUMPORTHARCOURTDUALCARRIAGEWAYSECTIONII:OKIGWEMPORTMHARCOURTINABIA/RIVERSSTATESImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmNo.No.30MN/AM80126N/A8050126N/A8018DUALISATIONOFIBADANMILORINSECTIONIICONTRACTNO.1793AImprovedTravelTimeonFederalRoads:AverageTravelTimeonRouteKmofRoadsConstructed/Rehabilitated:WearingCourseBinderCourseLinedDrainsCulvertsNo.ofBridgesConstructed/Rehabilitated:BridgesNumberofJobsCreated:Km/hrKmKmL/mL/mNo.No.0MMM143500M7.156,914254000M7.156,914115088
  89. 89. ©2013,FederalMinistryofWorks 89Number(of(Jobs(Created:($  During(the(year(2012,(the(Ministry(in(collaboraJon(with(the(Federal(Civil(Service(Commission(employed(455(engineers(and(technical(officers(to(fill(vacancies(declared(by(the(Ministry.($  Also( the( total( of( 3,660( jobs( were( created( on( major( on( going( projects( across( the(country(Training(of(newly(recruited(Engineers(
  90. 90. ©2013,FederalMinistryofWorks 90Status(of(New(LegislaJon:(!  Submission(of(Report/(dras(Bills(to(BPE(and(the(Ministry((April,(2012)(!  The(Bill(have(been(reMaligned(with(those(of(the(BPE(and(have(been(approved(by(the(NCP(for(onward(transmission(to(the(Ministry(of(JusJce(before(presentaJon(at(the(Federal(ExecuJve(Council(for(approval(Highlights(of(the(Bill:(!  EstablishaNaXonalRoadFundandaRoadFundBoard!  Create a Federal Road Authority as obtainable in other countries and free thisimportanttoolfornaXonaldevelopmentfromthejackbootofbureaucracy,leavingtheministry to focus on policy issues and seyng standards and project monitoring. TheWorldBankhasalreadyprovidedUSD5millionforthetakeMoffoftheFederalRoadsAuthority.!  The Federal Roads Authority to be professionalized, with a governing body and twooperaXonaldepartments;a)(ConstrucJon(&(RehabilitaJon.((b)(Maintenance.(
  91. 91. ©2013,FederalMinistryofWorks 91Regulatory(and(AdministraJve(Services:M(! (The(Ministry(introduced(the(use(of(Bitumen(Emulsion((to(replace(Cut(Back(Bitumen(in(road(construcJon.(The(Emulsion(is(cheaper(and(more(environmentally(friendly;(! New(Guidelines(were(introduced(by(the(Ministry(for(the(management(of(the(Right(of(Way(as(it(concerns(provision(of(ducts(for(laying(of((TelecommunicaJon(Cables(! Circular(issued(to(Field(officers(and(Contractors((that(only(protected(permanent(works(are(cerJfied(for(payment(
  92. 92. ©2013,FederalMinistryofWorks 92SECTION(E(–(CHALLENGES/CONSTRAINTS(
  93. 93. ©2013,FederalMinistryofWorks 93Challenges((((((((((((((((((Large(Number(of(Ongoing(Road(Projects(despite(FMW’s(efforts(at(prioriJsaJon(of(projects(Lack(of(Appropriate(Governance(of(the(Road(Sector(Heavy(Reliance(on(Road(TransportaJon(Leading(to(Excessive(Pressure(on(the(Roads(Abuse(of(Road(Infrastructure(Funding(Constraints(leading(to(unpaid(Interim(CerJficates(InsJtuJonal(Problems(CHALLENGES(Challenges faced in the development of road infrastructure in Nigeria in the yearunderreviewinclude:
  94. 94. ©2013,FederalMinistryofWorks 94What(Has(Worked/What(Has(Not(Worked:(M(What(Has(NOT(Work(What(Has(Work(•  Decadesofinappropriatemaintenance•  Fundingshortages•  LackofinsXtuXonalcapacity•  ConXnuouseconomicinstability%  InjecJon( of( extraMbudgetary( funds(from( the( SURE( Programme( has(help( the( ministry( to( achieve(appreciable( progress( on( selected(key(road(projects.(%  PrioriJsaJon( of( Projects( (Reduce(the( number( of( onMgoing( project(from(168(to(80),(although(19(new(projects(were(added(by(NASS(%  Reduced( dependence( on( Public(finance( by( facilitaJng( PPP( &(encouraging( funding( by( mulJMlateral(Agencies(•  ReducXonofprojectsbudgetedsumsbyNASS•  InclusionofprojectswithoutdesignbyNASS
  95. 95. ©2013,FederalMinistryofWorks 95MITIGATION(STEPS(TOWARDS(THE(CHALLENGES(OF(THE(MINISTRY:(M(Challenges(Inadequate(funding(of(road(projects(which(result(in(delayed(implementaJon(of(the(projects(BudgeJng( cycle( limits( maximal( uJlizaJon( of( funds(during(the(dry(season(IntroducJon(of(new(projects(in(the(budget(for(which(the(Ministry(does(not(have(ready(Engineering(Design(for(their(execuJon.(Heavy(reliance(on(road(transportaJon((Abuse(of(road(infrastructure(such(as(excessive(axle(loading,(blockage(of(drainage(structures,(e.t.c(AlteraJon( of( the( Ministry’s( proposed( annual(budgets(which(adversely(affects(projects(execuJon(MiJgaJon(We( are( exploring( other( sources( of( funding( road(projects( besides( the( yearly( budgetary( allocaJon,(including(introducing(Annuity(ContracJng(We( are( making( a( case( for( the( extension( of( the(budgetary(cycle(for(road(construcJon(to(extend(up(to( March( of( the( subsequent( year,( as( the( period( is(the(major(construcJon(period((Dry(season)(The( Ministry( has( engaged( the( NaJonal( Assembly’s(commiqees( on( Works( towards( addressing( the(situaJon(The(Federal(Government(is(addressing(the(shoryall(in(other(modes(of(transportaJon(with(the(onMgoing(rehabilitaJon(of(Railway(We(are(currently(installing(weighbridges(at(strategic(locaJons(along( the( Federal( Roads( network.( However,( management(problem( is( being( encountered( due( to( the( absence( of( Road(Plazas/(tolling(points(to(enhance(enforcement.((We( have( engaged( the( NaJonal( Assembly’s(commiqees(on(Works(and(the(Min.(of(Finance.(
  96. 96. Some#on;going#highway#projects#across#the#country©2013,FederalMinistryofWorks 96PAVING(THE(WAY(TO(A(GREATER(NIGERIA(COMPLETED(SECTION(OF(KANOMMAIDUGURI(DUAL(CARRIAGE(WAY
  97. 97. ©2013,FederalMinistryofWorks 97DualizaJon(of(KanoMMaiduguri(roadDualizaJon(of(AbujaMLokoja(road((Giri(JuncJon)
  98. 98. ©2013,FederalMinistryofWorks 98Refinery(Road(Warri(Vom(–(Manchok(Road
  99. 99. ©2013,FederalMinistryofWorks 99DualizaJon(of(AbujaMLokoja(road((SecJon(II)Rehab.(of(OnitshaMEnugu(Dual(carriageway
  100. 100. ©2013,FederalMinistryofWorks 100GENERAL(MAINTENANCE(REPAIRS(OF(KADUNA(–(BIRNIN(GWARI(ROAD(IN(KADUNA(STATE(((BEFORE( ((DURING( AFTER(
  101. 101. ©2013,FederalMinistryofWorks 101GENERAL(REPAIRS(OF(IFE(–(ILESHA(HIGHWAY((DUAL(CARRIAGEWAY)((((BEFORE( ((DURING( AFTER(
  102. 102. ©2013,FederalMinistryofWorks 102SECTION(F(M(CONCLUSION(
  103. 103. ©2013,FederalMinistryofWorks 103CONCLUSION(•  Road( Infrastructure( development( and( economic(growth( are( mutually( reinforcing,( as( road(infrastructure( development( plays( a( vital( role( in(wealth( creaJon.( In( Nigeria,( road( infrastructure( is(central( to( economic( growth.( It( is( at( the( core( of(good(governance(and(public(welfare.(•  Any( investment( in( Road( infrastructure( in( Nigeria,(posiJvely(impacts(the(naJon’s(GDP.(•  There( is( an( urgent( need( for( Government( to(increase(its(annual(budget(for(road(construcJon(if(the(objecJves(of(the(TransformaJon(Agenda(are(to(be(fully(realized.(((
  104. 104. ©2013,FederalMinistryofWorks 104Thank(YOU!
  105. 105. ©2013,FederalMinistryofWorks 105
  106. 106. The(80Nos.((PrioriJsed)(onMgoing(projects(of(the(ministry(in(2012(are(as(follows:(©2013,FederalMinistryofWorks 106APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(S/N Project(TitleDec.2012(%CompleJon(to(Date(1ABUJAMABAJI(ROAD(SECTION(1,INTERNATIONAL(AIRPORT(LINK(ROAD(JUNCTIONMSHEDA(VILLAGE(JUNCTION)(C/NO.5862 46.00%2 ABUJAMABAJI(ROAD(SECTION(11,SHEDA(VILLAGE(JUNCTIONMABAJI)(C/NO.5863 50.17%3 ABUJAMLOKOJA(ROAD(SECTION(III((ABAJIMKOTONKARFI)(C/NO.5884 20.05%4 ABUJAMLOKOJA(ROAD(SECTION(IV((KOTON(KARFIMLOKOJA)(C/NO.5885 19.43%5 KANOMMAIDUGURI(ROAD((SECTION(I,(KANOMWUDIMSHUARI)C/NO.5878 34.04%6 KANOMMAIDUGURI(ROAD((SECTION(II,SHUARIMAZARE)C/NO.5879 54.66%7 KANOMMAIDUGURI(ROAD((SECTION(III,AZAREMPOTISKUM)C/NO.5880 57.61%8 KANOMMAIDUGURI(ROAD((SECTION(IV,POTISKUMMDAMATURU)C/NO.5881 45.13%9 KANOMMAIDUGURI(ROAD((SECTION(V,(DAMATURUMMAIDUGURI)(C/NO.5869 24.28%10DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(1((OBAJANA(JUNCTION(TO(OKENE) 0.15%11 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(II(((OKENE(TO(AUCHI)0.15%12 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(III((AUCHI(TO(EHOR) 0.15%13 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(III(((EHORMBENIN) 0.15%14 DUALISATION(OF(SULEJAMMINNA(ROAD 22.48%15 CONSTRUCTION(OF(KADUNA(EASTERN(BYMPASS,(C/NO.(5346 58.52%16 CONSTRUCTION(OF(KANO(WESTERN(BYE(PASS(C/NO.(5960 49.58%17REHABILITATION(OF(ENUGU(BOUND(CARRIAGEWAY(OF(THE(ONITSHAMENUGU(ROAD,(PHASE(I(OF(SECTION(I)(IN(ANAMBRA(STATE(C/NO.5929 28.62%18REHABILITATION(OF(ONITSHAMBOUND(CARRIAGEWAY(OF(THE(ONITSHAMENUGU(ROAD,(PHASE(I(OF(SECTION(II)(IN(ANAMBRA(STATE(C/NO.5929A 10.17%19REHABILITATION(OF(ONITSHAMENUGU(DUAL(CARRIAGEWAY(SECTION(II((ANAMBRA(STATE(BORDERM(ENUGU)(IN(ENUGU(STATE,(C/NO.(5988 41.73%20CONSTRUCTION(OF(ELEME(JUNCTION(FLYOVER(AND(DUALISATION(OF(THE(ACCESS(ROADS(TO(ONNE(PORT(IN(RIVER(STATE.(C/NO.(5788 100.00%
  107. 107. ©2013,FederalMinistryofWorks 10721REHABILITATION(AND(ASPHAT(OVERLAY(OF(BENINMSHAGAMU(EXPRESS(WAY(((BENINMOFOSU(SECTION)(IN(EDO(STATE(C/NO.(5900 84.49%22REHABILITATION(OF(SHAGAMUMAJEBANDELEMORE(ROAD(SECTION(I:(AJEBANDELEMOFOSU(ROAD(IN(ONDO(STATE,(C/NO.(6000 92.00%23 REHABILITATION(OF(AGAIEMKATCHAMBARO(ROAD(IN(NIGER(STATE 19.00%24 DUALISATION(OF(IBADANMILORIN(SECTION(II(CONTRACT(NO.1793A 28.18%25 CONSTRUCTION(OF(OJU/LOKOMOWETO(BRIDGE(TO(LINK(LOKO(AND(OWETO(C/NO. 2.98%26 REHABILITATION(OF(PAMBEGUWA(M(SAMINAKA(M(JOS(ROAD(C/NO.(6013 77.66%27 ACCESS(ROADS(TO(ELEME(PORT(HARCOURT(REFINERY(C/NO.(6025 40.0%28 ACCESS(ROADS(TO(NNPC(DEPOT((MOSIM)(ALONG(IKORODUMSHAGAMU(ROAD(C/NO.(6028 10.5%29 ACCESS(ROADS(TO(APAPA/TINCAN(PORT,(NNPC(DEPORT((ATLASS(COVE)(TO(MILE(2(C/NO.(6005 50.05%30 REHABILITATION(OF(ACCESS(ROADS(TO(NNPC(DEPOT(AT(EJIGBO(IN(LAGOS(STATE(C/NO.6026 77.30%31REHABILITATION(OF(9TH(MILEMOTURKPOMMAKURDI(ROAD((OTUKPAMOTURKPO(SECTION)(IN(BENUE(STATE,(C/NO.(5983 28.00%32REMALIGNMENT(AND(CONSTRUCTION(OF(DANGEROUS(CURVES(BETWEEN(AKWANGA(AND(LAFIA(ROAD((KM(10+300(M(KM(23+600)(IN(NASARAWA(STATE,(C/NO.(5972 53.11%33 REHABILITATION(OF(OTUKPAMAYANGBAMAJAOKUTAMOKENE(ROAD(IN(KOGI(STATE((C/NO.(6030 53.19%34REHABILITATION(OF(GOMBEMNUMANMYOLA(ROAD(SECTION(II:(NUMAN(MGOMBE(IN(ADAMAWA/GOMBE(STATES,(C/NO.(5979 94.46%35REHABILITATION(OF(WUKARIMMUTUM(BIYUMJALINGOMNUMAN(ROAD(SECTION(I:(WUKARIMMUTUM(BIYU(ROAD(IN(TARABA(STATE,(C/NO.(5981 50.32%36 REHABILITATION(OF(BAUCHI(M(DASS(M(TAFAWA(BALEWA(IN(BAUCHI(STATE(C/NO.(6068 55.72%37 REHABILITATION(OF(SOKOTOMTAMBUWALMJEGAMKONTAGORAMMAKERA(SECTION(I 0.15%38 REMCONSTRUCTION(OF(SOKOTOMTAMBUWALMJEGAMKONTAGORAMMAKERA(SECTION(II 0.15%39REHABILITATION(OF(VANDEIKYAMOBUDUMOBUDU(CATTLE(RANCH(ROAD((VANDEIKYAMOBUDU(SECTION)(IN(BENUE(STATE0.15%40REHABILITATION(OF(ENUGUMPORT(HARCOURT(DUAL(CARRIAGEWAY(SECTION(I:(ENUGUMUMUAHIA(IN(ENUGU/ABIA(STATES0.15%APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(
  108. 108. ©2013,FederalMinistryofWorks 10841REHABILITATION(OF(ENUGUMPORT(HARCOURT(DUAL(CARRIAGEWAY(SECTION(II:(UMUAHIAMPORTMHARCOURT(IN(ABIA/RIVERS(STATES42 CONSTRUCTION(OF(NSUKKA(M(OBOLLO(M(AFOR(M(EHAMAFU(M(NKALAGU(C/NO.5962 19.13%43 REHABILITATION(OF(APAPA(M(OSHODI(EXPRESS(WAY(IN(LAGOS(C/NO.(6074 79.70%44 REHABILITATION(OF(APAPA(M(OSHODI(EXPRESS(WAY(IN(LAGOS(:(PHASE((II45 ADDENDUM(III(TO(DUALIZATION(OF(LAGOSMOTTA(ROAD( 16.51%46 CONSTRUCTION(OF(YENEGWEMOKAKIMKOLOMNEMBEMBRASS(ROAD(C/No.5990 36.73%47CONSTRUCTION(OF(BODOMBONNY(ROAD(WITH(A(BRIDGE(ACROSS(THE(OPOBO(CHANNEL.(C/NO.(5662 20.37%48 REHABILITATION(OF(JEBBA(BRIDGE(C/NO.(6066 92.87%49 OTUKPOMOWETO(ROAD(IN(BENUE(STATE(C/NO.(6076 55.60%50REHABILITATION(OF(MAIDUGURIMBAMAMGWOZAMHONG(ROAD(SECTION(II:(BAMAMGWOZA(IN(BORNO(STATE,(C/NO.(5975 62.01%51 REHABILITATION(OF(WUKARI(M(TAKUM(ROAD(SECTION(II(C/NO.(6039 85.17%52POTISKUM(M(UDUBO(M(GAMAWA(M(GAMAYIN(ROAD((R333)(SECTION(II((UDUBO(M(GAMAWA(M(GAMAYIN(ROAD)(IN(BAUCHI(STATE(C/NO.(6067 54.48%53REHABILITATION(OF(KANOMKATSINAMKAURA(NAMODAMJIBIA(ROAD(SECTION(III:(KAURA(NAMODAMJIBIYA(IN(ZAMFARA/KATSINA(STATE,(C/NO.(6014 88.62%54 REHABILITATION(OF(FUNTUA(M(YASHI(M(DAYI(M(KANO(STATE(BORDER(ROAD.(C/NO.(5264 78.75%55 ZARIAMFUNTUAMGUSAUMSOKOTOMBIRNIN(KEBBI(C/NO.(6029 71.33%56REHABILITATION(OF(HADEJIAMNGURU(ROAD(IN(JIGAWA(STATE((((((PHASE(II:(KIRIKASAMAM(NGURU(IN(JIGAWA(STATE(C/NO.(6072 48.66%57 REHAB.OF(HADEJIA(M(NGURU(ROAD(C/NO.(5927 88.41%58REHABILITATION(OF(CALABARMUGEPMMOGOJAMKATSINA(ALA(ROAD(SECTION(I(((CALABARMUGEP)(IN(CROSS(RIVER(STATE,(C/NO.(6011 77.00%59REHABILITATION(OF(CALABARMUGEPMKATSINA(ALA(ROAD(SECTION(II((UGEPMKATSINA(ALA)(IN(BENUE/CROSS(RIVER(STATES,(C/NO.(5991 79.26%60 REHABILITATION(OF(KABBA(M(IPELE(M(IDOANI((M(ISUA(RAOD(C/NO.(6033 80.00%APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(
  109. 109. ©2013,FederalMinistryofWorks 10961 DAMASAKMDUTSE((NIGERIA)MDIFFA((NIGER(REPUBLIC)(ROAD(IN(BORNO(STATE(C/NO.(6071 30.59%62CONSTRUCTION(OF(OJIMACHIMMMAKWUMAWGUMNDEABOMMPUMAKAEZE(ROAD(SECTION(I((OJIMACHIMMMAKWUMAWGU)(C/NO.(6037 46.04%63CONSTRUCTION(OF(OJIMACHIMMMAKWUMAWGUMNDIABOHMMPUMAKAEZE(ROAD(SECTION(II((AWGUMMPUMOKPANKUMAKAEZE()C/NO.(6073 42.54%64REHABILITATION(OF(OZALLAMAKPUGOMAMAGUNZEMIHUOKPARAMNKOMOROMISUMONICHA(ENUGUMONICHA)(WITH(A(SPUR(TO(ONUNWEKE(C/NO.(6078 14.84%65REHABILITATION(OF(ABAKALIKIMAFIKPO(ROAD(SECTION(I:(ABAKALILKIMONUEKEMABOMEGA(ROAD(IN(EBONYI(STATE,(C/NO.(5989 26.90%66REHABILITATION(OF(ABAKALIKIMAFIKPO(ROAD(SECTION(II:(ABOMEGAMAFIKPO(WITH(SPUR(TO(UGBAMAKAM/AHABBA(JUNCTION(ROAD(IN(ENUGU(STATE,(C/NO.(5989A 71.24%67 REHABILITATION(OF(LAFIAMOBIMAWEMTUNGA(ROAD(IN(NASARAWA(STATE(C/NO.(6065 50.75%68REHABILITATION(OF(SPUR(FROM(ONITSHAMOWERRI(ROAD(TO(OKIJAMIHEMBOSIMAFOR(UKPORMEBENATORMEZENIFITE(IN(NNEWI(SOUTH(LGA(IN(ANAMBRA(STATE 8.49%69 REHABILITATION(OF(AKUREMONDOMORE(C/NO.6115 17.97%70 CONSTRUCTION/REHABILITATION(OF(GBONGANMIWOMOYO(ROAD(IN(OYO(STATE(C/NO.6102 12.68%71REHABILITATION(OF(ODOMOBAMTAKIEMGAMBARIMOTTEMOYO(STATE(BORDER(ALONG(IBADANMOYOMOGBOMOSHOMILORIN(ROAD45.3KM(ROUTE(20)(IN(OYO(STATE(C/NO.6116 30.27%72REHABILITATION(OF((IJEBU(IGBOMOLOMI(OYO(STATE(BORDER)(ROAD(IN(OGUN(STATE(C/NO.6113 12.20%73 REHABILITATION(OF(OBIOZARA(M(UBURU(M(ISHIAGU(ROAD(C/NO.(5828 100.00%74COMPLETION(OF(REHABILITATION(OF(ADAMOKEREMUKONIMAMEDOKHIOM(OLD(ROAD,(UROMI(EDO(STATE 1.88%75CONSTRUCTION(OF(2NO.(BRIDGES(ALONG(AUCHI((POLY)(EKPERIMAGENEBODE(ROAD(ROUTE(549(IN(EDO(STATE 0.15%76 RECONSTRUCTION(OF(IKOTMEKPENEMODUKPANIMCALABAR(ROAD(77COMPLETION(OF(AUCHI(POLYMEKPERIMUZEAMEBHOJE(ROAD(AND(TWO(PEDESTRIAN(BRIDGES(AT(AUCHI(POLY(ENTRANCE0.15%78COMPLETION(OF(THE(REHABILITATION(OF(IRRUAMUROMIMILLUSHI(SECTION(II((WATER(RESERVOIRMIVUE(TO(WATER(WORKSMIBORE(SECTION(ROAD)0.15%79 CONSTRUCTION(OF(NPOROMABIRIBAMOHAFIA(ROAD(IN(ABIA(STATE 4.23%80 REHABILITATION(OF(ILORINMKABBAMOBAJANA(ROAD 0.15%APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(

×