Uploaded on

 

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
888
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
83
Comments
0
Likes
2

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • Reference: Maylor textbook 2005.
  • Well done!Obviously this is a very basic Gantt Chart. We will now take a look at why Gantt Charts are valuable within a project and why they are used. We will also consider the limitations to the Gantt Chart and introduce some alternative methods that are worth carrying out some background reading on.
  • For further reading on the advantages of the Gantt Chart, please refer to Maylor Chapter 5 or Field and Keller Chapter 3.3
  • Beyond the Gantt Chart, Maylor 2001, European Management Journal, Volume 19, pp. 92-100Goldratt, 1997, Goldratt, 1997E.M. GoldrattThe Critical ChainNorth River Press, New York (1997)
  • Beyond the Gantt Chart, Maylor 2001, European Management Journal, Volume 19, pp. 92-100
  • Optional Task: read through the literature. Can you identify any other alternative approaches to scheduling?
  • PERT often displays the:O=Optimistic timeM=Most Likely timeP= Pessimistic Time
  • Please read Kerzner Chapter 12 for a detailed explanation of PERT.

Transcript

  • 1. The Gantt Chart The Theory of Henry Laurence Gantt
  • 2. The Purpose of a Gantt Chart: • To illustrate the relationship between project activities & time. • To show the multiple project activities on one chart • To provide a simple & easy to understand representation of project scheduling
  • 3. Example of a simple Gantt Chart  You will see that a Gantt Chart is basically a Bar Chart. Representing project activities against time.
  • 4. Creating a Gantt Chart: There are two methods to creating a Gantt Chart (Maylor, 2005). 1. Using a Forward Schedule: starting with the list of activities and a given start date (6th Sept in previous example) follow them forwards in time until you hit given deadline. 2. Using a Backward Schedule: look at the deadline, from that date work in the logical list of activities. Both of these methods allow you to ensure that all necessary activities can possibly be completed within the given project time frame.
  • 5. Steps to Creating a Gantt Chart: 1. Determine Project start date and deadline. 2. Gather all information surrounding the list of activities within a project – the Work Breakdown Structure may be useful for this. 3. Determine how long each activity will take 4. Evaluate what activities are dependant on others 5. Create Graph shell including the timeline and list of activities. 6. Using either Forward Scheduling or Backward Scheduling, Begin to add bars ensuring to include dependencies and the full duration for each activity.
  • 6. Example: Consider the following: Activity Duration Dependant On 1. Read Literature 21 days N/A 2. Conduct Literature Review 14 days 1 3. Arrange Client Visits 7 days N/A 4. Prepare Surveys 5 days 1 and 3 5. Conduct Surveys 14 days 4 6. Analyse Surveys 10 days 5 7. Write Up 30 days 1,2,3,4,5 and 6 Project Start Date = 1st September Deadline = 20th Decemeber
  • 7. • Step 5 - From the previous slide, steps 1-4 are already complete. We now need to create a ‘Graph Shell’.
  • 8. • Step 6 – have a go at using either Forward Scheduling or Backward Scheduling to populate the graph. The Finished Product:
  • 9. The Advantages: • A useful tool for displaying time-based information within a project. • Very simple to create • They provide a useful overview of project activities, a good starting point for project planning. • The charts are widely used and understood. • There exists several PC software packages that allow you to build Gantt Charts.
  • 10. The Limitations: • The Gantt Chart does not explain the reasoning behind the chosen duration of each activity. (Maylor, 2001) • The Gantt Chart is very difficult to update when changes to the project plan take place. This makes it time consuming and results in long-term planning being very difficult. (Goldratt, 1997)
  • 11. • Gantt Charts encourage a one-step approach to planning – this prevents flexibility in project planning. • Modern day Gantt Charts, using PC software, can look very professional without actually having meaning, preventing project teams from challenging their content. This can lead to difficulties later in the project. (Maylor, 2001) • As Gantt Charts are difficult to update manually, they can often become obsolete. • The charts do not consider project costs or resources.
  • 12. Alternatives • • • • • PERT/GERT Work Breakdown Structure Critical Path Method Resource Levelling Many Others!
  • 13. Program Evaluation and Review Technique (PERT): • Also a very traditional project planning technique • PERT shows the list of activities within a project, their duration and the relationship between them • PERT is a complex process however it can help to deliver a well defined project plan.
  • 14. A Basic PERT Diagram:
  • 15. Graphical Evaluation and Review Technique (GERT): • Similar to PERT, however allows for looping, branching and the display of multiple project results. • GERT can show possibilities if a section of a project were to fail. • Further GERT reading = Meredith and Mantel
  • 16. Further Reading: