Quang ninh port's presentation
Upcoming SlideShare
Loading in...5
×
 

Quang ninh port's presentation

on

  • 400 views

 

Statistics

Views

Total Views
400
Views on SlideShare
400
Embed Views
0

Actions

Likes
0
Downloads
8
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Quang ninh port's presentation Quang ninh port's presentation Presentation Transcript

    • Company LOGO Quang ninh port No. 1 Cai Lan Road – Ha Long City– Quang Ninh Province - Vietnam
    • Vietnamnational shipping lines Quang Ninh Port Tel : 033.625889; 033. 825603 ; 033.825627 Fax : 033.826118 Pilot boarding station : 200 43’ 04’’ N 1070 10’ 33’’ E Main gate to Cai Lan Port
    • General introduction 1. Introduction on Cai Lan Port and its transportation network1. Introduction on Cai Lan Port and its transportation network 2. Introduction on Cai Lan Port’s facilities2. Introduction on Cai Lan Port’s facilities 3. A number of preferential policies offered by Quang Ninh Port3. A number of preferential policies offered by Quang Ninh Port
    • 1. Technical information and transportation networks . A.. A. Access channelAccess channel Total length: 18 nautical miles Passage from Buoy No. 0 to Hon Mot is 11.8 Nautical miles, 300 m wide, -13 m deep against the port datum. Passage from Hon Mot to Cua Luc is 4.2 Nautical miles, 80m wide, -8,1m deep against the port datum. Passage from Cua Lục to Cai Lan Port is 2 Nautical miles, 130m wide, -10m deep against the port datum. On 24 Sept. 2004, The Prime Minister has approved the project to upgrade and dredged the passage from Hon Mot to Cua Luc up to the depth of -10m, 130m wide which is capable of receiving vessels up to 40.000 – 45.000 DWT. The dredging works is expected to commence from Sept.2005 and taken for 5 months.
    • Transportationsystemto Cai LanPort RoadRoad WaterwayWaterway RailwayRailway Connected to the port through the National Road No. 18 (the permitted load capacity is 10 tons/vehicle axe Suitable for the large volume of cargo transport to the Northern provinces rendered with the waterways systems At present connected to Ha Long railway Station. It is expected to connect to Cai Lan Port by 2007
    • The map of the north of Vietnam which generally overview theThe map of the north of Vietnam which generally overview the locations and the transport systems to Cai Lan Port from other areas.locations and the transport systems to Cai Lan Port from other areas.
    • - By 2005 to construct the railway which connect Bac Ninh Province to Pha Lai. (The detour of Kep - Bac Giang station is over and the distance is reduced 60km). - It is expected that the railway to Cai Lan Port to be commenced from May 2005 and complete by 2007. This railway is built with two gauges 1.435m and 1.05m nationally and internationally. - It is expected that during 2010-2015 the Highway Noi Bai-Ha Long to be complete. The development plan of transportation systems to Cai Lan Port in coming years
    • -Be rth No . 1 : 166 m long, wall height +5m, front depth –9m which is capable of receiving vessels up to 25.000 DWT. -Te m po rary be rth: 80m long, wall height +5m, front depth –5m, which is capable of receiving vessels up to1.000 DWT. -Turning basin : 350 m in diameters. 3.1Existingberths:5berths : Berths No 1, 5, 6, 7 and the temporary berth
    • Berth No. 5, 6, 7: Total length 680m, wall height +5m front water depth: -12m which is capable of receiving vessels up to 40.000 DWT and 45.000 DWT Handling works at berth No. 6
    • The master plan of Cai lan Port to the year 2010The master plan of Cai lan Port to the year 2010 Up to 2010 Cai Lan port will comprise of total 09 berths
    • Machinery vessel at berth No. 5
    • Passenger ship at berth No. 6
    • Berth No. 7
    • 3. 2 Ware ho using & yards3. 2 Ware ho using & yards Total area of the warehouse (05 units)Total area of the warehouse (05 units) 12.70012.700 mm22 of whichof which:: CFS:CFS: 4.600 m4.600 m22 Other warehousesOther warehouses :: Berth No. 5:Berth No. 5: 5.400 m5.400 m22 Berth No.1 :Berth No.1 : 2.700 m2.700 m22 Kho 2.700m2 B·i: 15.000m2
    • Total yard area of 5 berths: 162,000 m2 Amongthose: Container yard at berth No. 7: 49,000 m2 Others (including container): Berth No 6: 52.000 m2 Berth No. 5: 26.000 m2 Berth No. 1 35.000 m2 General layout of the yards for the berths No. 6, 7 and some parts of berth No. 5
    • Cai Lan Port’s facilities & equipment Item Quantity Description Quayside Gantry Crane 2 40 ton under spreader (20, 40, 45 ft container, outreach: 37m, Hoist height: 31m Rubber-tyred gantry crane (RTG) 4 7 rows / 4 tiers (7 + 1 wide, 1 over 4 high) Mobile Harbour Crane 1 Load on rope 64 ton at 20 m radius. With 40 ft container spreader and grab. Liebherr. Rail mounted crane 2 Lifting capacity 5 - 25 tons; 32 radius CTMS (Container Terminal Management System) 1 For vessel schedule, container receiving/delivery, yard control, vessel loading/discharging, on-line inquiry, reporting, and billing system. Tractor/Chassis 13 Max 45 ft container box. Command 50 + TC56K0C2E Forklift 2.5 t 20 Stripping/stuffing container, unloading/loading trailers Forklift 5 t 2 Stripping/stuffing container, unloading/loading trailers. Forklift 10 t 5 Stripping/stuffing container, unloading/loading trailers. Truck crane 5 Lifting capacity 14,5 - 25ton Yard Crane 1 Max. 50 ton x 30m -KR-500 - Kato Works Wheel Loader 2 Operrating capacity 830 kg, Bucket capacity 0.4 m3 Weight bridge 4 Weighing load up to 80 tons Tugboat 3 1.200 -1.500 PS
    • Mobile harbor crane Liebherr 64 Mt handling the fertilizer using the hydraulic grab of 8 m3 at Berth N. 5
    • Two gantry cranes of 60 MT handling at berth No. 6
    • Rubber tired gantry crane handling frozen container at the yard of Berth No. 7
    • The Bien Dong floating crane of 400 MT capacity unloading the heavy loads at the berth No. 5
    • Empty container forklift at berth No. 6
    • The belt conveyor is loading the wood chips at the Berth No. 6
    • Informatics Room with the Computer terminal Management System -CTMS
    • 0 500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 2000 2001 2002 2003 2004 Turnover (10 Million) Output (thousand of ton) Business results from 2000 to 2004
    • 0 2.000 4.000 6.000 8.000 10.000 12.000 14.000 16.000 2005 2006 2007 2008 2009 2010 Turnover (10 Million) Output (Thousand of ton) Development plan to 2010
    • Part IIIPart III:: Anum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rtAnum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rt to the custo m e rs fo r the initialye ars o f o pe ratio nto the custo m e rs fo r the initialye ars o f o pe ratio n 1. Quang Ninh Port will provide the assistance policies on handling and storage charges for the customers for the initial operation year. The specific assistances depend on the kind of goods and the throughput of each kind of cargo. 2. Accepting the container handling operation as follows: vessels (or barge) – truck then go straight or vice versa including the transhipment by barge to alongside the vessel at the berth for handling. At present two Tariffs havebeenapplied: + Foreign Tariff. + Domestic Tariff.
    • 3. Providing and assisting partly of the tallying, freight forwarding, lashing, unlashing charges for the first two years operation. 4. The yard and warehousing charges on the necessary cargo kept in the warehouses and yards for vanning to the container will be considered for reduction. 5. 60 days of yard storage charge is exempted for empty container which is waiting for export vanning at Cai Lan Port. 6. 30 days of yard storage charge is exempted for custom clearance container for export. 7. 15 days of yard storage charge is exempted for import custom clearance container. 8. The imported container doing the custom procedures at Cai Lan Port is considered to be reduced by 10% of loading, unloading and custom inspection charges as per the Port’s tariff.
    • 9. The loading, unloading, vanning/devanning services are provided 24/24 hr as registered at least in advanced 6 hours by the customers. 10. Propose to the Government for permission of opening the bonded warehouse and container transit services. 11. Assistance in dealing with the legal formalities such as: port authority, security border gate, quarantine, custom procedure as required from the customers. 12. Assistance in dealing with the legal formalities relating to the opening of the Container routes through Cai Lan Port, assistance in setting up the branches, representative offices as required from the customers
    • Tel: 033.625889, 033.825627 Fax: 033.826118, 033.825600 Email: pkh_qnport@vnn.vn Quang Ninh POrt No. 1 Cai Lan Road Ha Long City - Quang Ninh Province Thank you ! For the sustainable development of Quang ninh Port, We always hope to receive the attention and co-operations from the customers. For further information on our Port, please contact the following address and telephones.