Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Like this document? Why not share!

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
2,628
On Slideshare
2,628
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. NAVY STANDARD INTEGRATED PERSONNEL SYSTEM (NSIPS) ELECTRONIC SERVICE RECORD (ESR) CAREER INFORMATION MANAGEMENT SYSTEM (CIMS) PLANNED PREVENTATIVE MAINTENANCE SCHEDULE CY 2011 The following dates are the NSIPS/ESR/CIMS planned preventive maintenance dates for each month of CY 2011. When we conduct maintenance on these weekends, we will attempt to keep the maintenance work within the period from 1200 (CST or CDT) on Saturday to 1200 (CST or CDT) Sunday. This means that if we have required maintenance for a particular month, we will plan the maintenance to commence at noon on Saturday for these dates. If we have no updates, there will be no maintenance period for that month. These planned dates DO NOT preclude emergency repairs, or short fused security patches required by higher authority. PMO will notify the field in advance of each of these dates if there will be maintenance and give as much notice as possible of short fused requirements. As always, we will endeavor to return NSIPS to operational status as soon as possible. 29-30 Jan 2011 26-27 Feb 2011 26-27 Mar 2011 30 Apr – 1 May 2011 21-22 May 2011 25-26 Jun 2011 30-31 Jul 2011 27-28 Aug 2011 24-25 Sep 2011 29-30 Oct 2011 19-20 Nov 2011 17-18 Dec 2011