TBM
TUNNEL BORING MACHINE
INTRODUCTION
A tunnel is an underground passageway, completely
enclosed except for openings for egress, commonly at
each end.
A tunnel may be for road traffic,,canal,hydroelectric
station,sewer etc.
The Delaware Aqueduct in New York USA is the longest
tunnel, of any type, in the world at 137 km (85 mi)
REQUIRMENTS OF TUNNEL
 IT IS VERY USEFUL WHERE BRIDGE FAIL TO FULFILL
REQUIRMENTS LIKE IN SEA ,IN URBAN AREA ,AND IN
MOUNTAINS.
 EFFICIENT COPARED TO BRIDGES.

 IN WAR TIME IT IS MUCH DIFFICULT TO DESTROY A TUNNEL
BUT DESTRUCTION OF BRIDGE IS TOO EASY.
 LOTS OF LAND AND TIME IS SAVED.
TUNNEL BORING MACHINE
 tunnel boring machine (TBM) is a machine used
to excavate tunnels with a circular cross section
through a variety of soil and rock strata
 They can bore through anything from hard rock to
sand
 Tunnel diameters can range from a metre to
19.25metre
DRILL AND BLAST
 1.Before the advent of tunnel boring
machines, drilling and blasting was
the only economical way of excavating
long tunnels through hard rock, where
digging is not possible.
 2.Even today, the method is still used in
the construction of tunnels
 But the disadvantage is it disturbance the
sorroundings
HOW DRILL AND BLAST IS BEING DONE
HISTORY
 The first successful tunnelling shield was developed
by Sir Marc Isambard Brunel to excavate the Thames
Tunnel in 1825
 In the United States, the first boring machine to have
been built was used in 1853 during the construction
of the Hoosac Tunnel.
MAIN PARTS OF TBM
WORKING OF TBM
 A TBM is shaped like a tube. At the front is a rotating
disk with cutting teeth that can shear through rock
 The pulverized rock falls to a conveyor belt that
carries it to the back of the TBM
 Hydraulic feet grip the sides of the tunnel and push
the machine forward
 There is also the ability to insert plates to line the
interior of the tunnel
How its work
ADVANTAGE
 Higher advance rates
 Continuous operations
 Less rock damage
 Less support requirements
 Uniform muck characteristics
 Greater worker safety
 Potential for remote, automated operation.
DISADVANTAGE
 The major disadvantage is the upfront cost
 TBMs are expensive to construct, and can be difficult
to transport.
 TBM can not move in backward direction
 TBMs are expensive to construct, and can be difficult
to transport.
APPLICATION
 1.IN ROAD TRAFFICS
 2.IN SEWERS
 3.IN MININGS
 4.IN RAIL TRAFFICS
 5.IN HYDROELECTRIC STATIONS
CONCLUSION
 The main purpose for any organisation is that
provide safe environment for worker and TBM is
more control and safe than drilling and blasting
TBMs: How Tunnel Boring Machines Excavate Underground Passageways
TBMs: How Tunnel Boring Machines Excavate Underground Passageways

More Related Content

What's hot

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationSagar Radadiya
 
tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine Milan Sheta
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machineVISHAL KUMAR SINGH
 
tractor and related equipments
tractor and related equipments tractor and related equipments
tractor and related equipments Nayana 54321
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating EquipmentsTulsi Makwana
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructionsVinay Vb
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavatorShahid Akram
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Construction Tech. and Mgmt., VNIT Nagpur
 

What's hot (20)

Bulldozers
BulldozersBulldozers
Bulldozers
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
Ripper
RipperRipper
Ripper
 
Power shovel
Power shovelPower shovel
Power shovel
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
 
tractor and related equipments
tractor and related equipments tractor and related equipments
tractor and related equipments
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Excavation in hard rock
Excavation in hard rockExcavation in hard rock
Excavation in hard rock
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
Scraper
ScraperScraper
Scraper
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
earth moving equipments
earth moving equipmentsearth moving equipments
earth moving equipments
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavator
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 

Viewers also liked

Latest technological developments in underground mining
Latest technological developments in underground miningLatest technological developments in underground mining
Latest technological developments in underground miningPartha Sarathi Panda
 
(TBM) ماشین حفاری تونل
(TBM) ماشین حفاری تونل(TBM) ماشین حفاری تونل
(TBM) ماشین حفاری تونلHamed Zarei
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel liningMahesh Raj Bhatt
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringJunaida Wally
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge SystemAltosMarketing
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineFilipe Mello
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Mohit Shukla
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODADIL BIN AYOUB
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCommunications Branding
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 

Viewers also liked (20)

Continuous miners
Continuous minersContinuous miners
Continuous miners
 
Latest technological developments in underground mining
Latest technological developments in underground miningLatest technological developments in underground mining
Latest technological developments in underground mining
 
(TBM) ماشین حفاری تونل
(TBM) ماشین حفاری تونل(TBM) ماشین حفاری تونل
(TBM) ماشین حفاری تونل
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Tunneling
Tunneling  Tunneling
Tunneling
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Guidelines
GuidelinesGuidelines
Guidelines
 

Similar to TBMs: How Tunnel Boring Machines Excavate Underground Passageways

Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdfSuryoNegoro3
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt1971995
 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMBindranjanGhosh
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdfBalpreetSingh47890
 
Tunnelling equipment
Tunnelling equipmentTunnelling equipment
Tunnelling equipmentparas6904
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnelsarravindsai
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & ExcavationShivananda Roy
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTSsrinivas cnu
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBMindranjanGhosh
 

Similar to TBMs: How Tunnel Boring Machines Excavate Underground Passageways (20)

Tunneling
TunnelingTunneling
Tunneling
 
u1t4tunneling.pptx
u1t4tunneling.pptxu1t4tunneling.pptx
u1t4tunneling.pptx
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
Tunnelling equipment
Tunnelling equipmentTunnelling equipment
Tunnelling equipment
 
Tunnel PDF.pdf
Tunnel PDF.pdfTunnel PDF.pdf
Tunnel PDF.pdf
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBM
 

Recently uploaded

美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作ss846v0c
 
萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程1k98h0e1
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作f3774p8b
 
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一diploma 1
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)861c7ca49a02
 
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...ttt fff
 
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree z zzz
 
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls DubaiDubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubaikojalkojal131
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxLeaMaePahinagGarciaV
 
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...Amil baba
 
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls in Delhi
 
(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一C SSS
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...Amil Baba Dawood bangali
 
RBS学位证,鹿特丹商学院毕业证书1:1制作
RBS学位证,鹿特丹商学院毕业证书1:1制作RBS学位证,鹿特丹商学院毕业证书1:1制作
RBS学位证,鹿特丹商学院毕业证书1:1制作f3774p8b
 
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...Amil baba
 
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证gwhohjj
 
existing product research b2 Sunderland Culture
existing product research b2 Sunderland Cultureexisting product research b2 Sunderland Culture
existing product research b2 Sunderland CultureChloeMeadows1
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一C SSS
 

Recently uploaded (20)

美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
 
萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
 
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
 
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Serviceyoung call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...
毕业文凭制作#回国入职#diploma#degree美国威斯康星大学麦迪逊分校毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#d...
 
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls DubaiDubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptx
 
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国加州州立大学东湾分校毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
 
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
 
(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
 
RBS学位证,鹿特丹商学院毕业证书1:1制作
RBS学位证,鹿特丹商学院毕业证书1:1制作RBS学位证,鹿特丹商学院毕业证书1:1制作
RBS学位证,鹿特丹商学院毕业证书1:1制作
 
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
 
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
 
existing product research b2 Sunderland Culture
existing product research b2 Sunderland Cultureexisting product research b2 Sunderland Culture
existing product research b2 Sunderland Culture
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
 

TBMs: How Tunnel Boring Machines Excavate Underground Passageways

  • 2. INTRODUCTION A tunnel is an underground passageway, completely enclosed except for openings for egress, commonly at each end. A tunnel may be for road traffic,,canal,hydroelectric station,sewer etc. The Delaware Aqueduct in New York USA is the longest tunnel, of any type, in the world at 137 km (85 mi)
  • 3. REQUIRMENTS OF TUNNEL  IT IS VERY USEFUL WHERE BRIDGE FAIL TO FULFILL REQUIRMENTS LIKE IN SEA ,IN URBAN AREA ,AND IN MOUNTAINS.  EFFICIENT COPARED TO BRIDGES.   IN WAR TIME IT IS MUCH DIFFICULT TO DESTROY A TUNNEL BUT DESTRUCTION OF BRIDGE IS TOO EASY.  LOTS OF LAND AND TIME IS SAVED.
  • 4. TUNNEL BORING MACHINE  tunnel boring machine (TBM) is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata  They can bore through anything from hard rock to sand  Tunnel diameters can range from a metre to 19.25metre
  • 5.
  • 6. DRILL AND BLAST  1.Before the advent of tunnel boring machines, drilling and blasting was the only economical way of excavating long tunnels through hard rock, where digging is not possible.  2.Even today, the method is still used in the construction of tunnels  But the disadvantage is it disturbance the sorroundings
  • 7. HOW DRILL AND BLAST IS BEING DONE
  • 8. HISTORY  The first successful tunnelling shield was developed by Sir Marc Isambard Brunel to excavate the Thames Tunnel in 1825  In the United States, the first boring machine to have been built was used in 1853 during the construction of the Hoosac Tunnel.
  • 10. WORKING OF TBM  A TBM is shaped like a tube. At the front is a rotating disk with cutting teeth that can shear through rock  The pulverized rock falls to a conveyor belt that carries it to the back of the TBM  Hydraulic feet grip the sides of the tunnel and push the machine forward  There is also the ability to insert plates to line the interior of the tunnel
  • 12. ADVANTAGE  Higher advance rates  Continuous operations  Less rock damage  Less support requirements  Uniform muck characteristics  Greater worker safety  Potential for remote, automated operation.
  • 13. DISADVANTAGE  The major disadvantage is the upfront cost  TBMs are expensive to construct, and can be difficult to transport.  TBM can not move in backward direction  TBMs are expensive to construct, and can be difficult to transport.
  • 14. APPLICATION  1.IN ROAD TRAFFICS  2.IN SEWERS  3.IN MININGS  4.IN RAIL TRAFFICS  5.IN HYDROELECTRIC STATIONS
  • 15. CONCLUSION  The main purpose for any organisation is that provide safe environment for worker and TBM is more control and safe than drilling and blasting