Your SlideShare is downloading. ×
0
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
NAVFAC Environmental Briefing
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

NAVFAC Environmental Briefing

648

Published on

2012 NC Federal Environmental Symposium

2012 NC Federal Environmental Symposium

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
648
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. NAVFAC MIDLANTNaval Facilities Engineering Command Mid-Atlantic North Carolina Operations Kirk Stevens, P.E. NC/Marine Corps IPT Environmental Business Team Leader kirk.a.stevens@navy.mil 13 June 2012 1
  • 2. The NAVFAC Mission/Vision From the 2010-2017 NAVFAC Strategic Plan: Our Mission: NAVFAC is the Systems Command that delivers and maintains quality, sustainable facilities, acquires and manages capabilities for the Navy’s expeditionary combat forces, provides contingency engineering response, and enables energy security and environmental stewardship. Our Vision: We strengthen Navy and Marine Corps readiness through our work across the facility lifecycle and our supported of the shore expeditionary mission.2 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 3. NAVFAC MIDLANT Area Of Responsibility NAVFAC MIDLANT (on board) North East IPT Demographics: 1146 •MCRCs – 48 Locations Demographics: 3623 25 Military •NOSCs – 33 Locations 95 Military 1094 Civilian 3422 Civilian 26 Contractor •Cutler, ME •NSU Saratoga 101 Contractor •Springs, NY •Rangeley, ME •Prospect Harbor, ME •NSY Portsmouth MIDLANT Core •Kittery, ME •PWD Maine Demographics: 639 10 Military •JRB Willow Grove, PA •NS Newport, •PWD Newport 600 Civilian RI •NSA Mechanicsburg, PA •SUBASE New London, 29 Contractor •NSA CT •PWD New London •Philly •PNBC Annex (Navy •NWS Earle, NJ •PWD Earle Yard) Hampton Roads IPT • NAES Lakehurst, NJ Demographics:1600 •PWD PA 39 Military •Wallops Island 1541 Civilian •Sugar Grove, WV •Cheatham Annex •Norfolk Naval Base, VA •PWD Norfolk 20 Contractor •NWS Yorktown, VA •NSA Norfolk, VA •PWD NSA •PWD Yorktown •Fort Story •PWD Little Creek •NAB Little Creek, VA North Carolina IPT •NAS Oceana, VA •PWD Oceana Demographics: 238 •Dam Neck Annex 21 Military •NNSY Portsmouth , VA •PWD Portsmouth 187 Civilian •Camp Lejeune, NC 26 Contractor •OICC East •MCAS Cherry Point, NC •ROICC Cherry Point3 NAVFAC MIDLANT - WORKLOAD PROJECTION •18 June 2012
  • 4. NAVFAC MIDLANT Organization• Field Offices • Public Works Departments – 11 Installations • Officer in Charge of Construction (OICC)– Camp Lejeune, NC • Resident Officer in Charge of Construction (ROICC) – Cherry Point, NC• Integrated Product Teams (IPT) • Hampton Roads: VA, WV • North Carolina: NC • Northeast: PA, NJ, CT, RI, ME, NY, NH, VT, MA, MD, DE• Business/Support Lines • Capital Improvements • Public Works • Environmental • Asset Management • Contingency Engineering • Acquisition, Financial Management, CIO, Counsel4 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 5. Environmental Business LineProducts and Services:• Environmental Services – Hazardous waste collection and disposal – Spill response – Industrial waste and oily waste treatment – Lead/asbestos abatement – Laboratory services coordination – Pest control• Environmental Compliance – Environmental compliance products and services for Navy installations• Environmental Planning and Conservation – Environmental planning (NEPA) and permits – Natural and cultural resources management• Environmental Restoration – Installation Restoration – Munitions Response Program – Range Clearance5 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 6. Typical Acquisition Approach•Full and Open Competition•Full and Open Set-Aside for Small Business•Best Value Source Selection•Multiple Award Construction Contracts –Small Business set-aside within MACC –Full and Open within MACC•Indefinite Delivery Indefinite Quantity A&E Contracts – Follow-on Task Orders are negotiated•Indefinite Delivery Indefinite Quantity Construction Contracts –Paving, Fencing, Roofing, Painting, Utility Distribution•Indefinite Delivery Indefinite Quantity 8(a) Environmental Services Contracts – Follow-on Task Orders are negotiated6 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 7. FY 13-15 Acquisition Tools Business Line Goal Small Business +40% Fixed Price +60% Multiple Award (MACs) 25% Performance Based Contracting 50% (PBR)7 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 8. DRAFT FY 13-15 Environmental Contracts A/E? FEC CONTRACT TITLE CONTRACT TOTAL FEDBIZ OPS (YES/NO) CP, FP, or SB or SINGLE or DURATION CAPACITY AWARD BOTH UB MAC (Yrs) ($M) DATELANT Yes Multi media Compliance FP UB Single 5 75 FY12 Q4 FY14 Q1LANT Yes Multi media Compliance FP UB Single 5 75 FY14 Q2 FY15 Q3LANT Yes Water/WW/SW FP UB Single 5 40 FY13 Q1 FY13 Q4LANT Yes HW Compliance FP UB Single 5 20 FY13 Q2 FY14 Q1LANT Yes NEPA Operations FP UB Single 5 40 FY13 Q2 FY14 Q2LANT Yes NEPA Homebasing FP UB Single 5 40 FY14 Q2 FY15 Q2LANT Yes NEPA Homeporting FP UB Single 5 40 FY14 Q2 FY15 Q2LANT Yes TAP East II FP UB Single 5 50 FY12 Q3 FY13 Q4LANT No ORC/MRP Both SB MAC 3 100 FY11 Q3 FY12 Q4LANT No Marine Species Monitoring FP UB Single 5 75 FY14 Q1 FY15 Q1LANT No Natural Resources FP UB MAC 5 75 FY12 Q4 FY13 Q3LANT No Cultural Resources FP SB MAC 3 10 FY11 Q3 FY12 Q3LANT No Cultural Resources FP SB MAC 5 20 FY14 Q1 FY15 Q1LANT No Natural Resources FP SB Single 5 10 FY12 Q2 FY12 Q3LANT No Munitions & Explosives of Concern Support FP SB MAC 5 150 FY12 Q4 FY13 Q4LANT No ORC/MRP Both SB MAC 5 250 FY14 Q4 FY15 Q4LANT No UB RAC CP UB Single 5 100 FY11 Q2 FY13 Q1LANT No SB RAC CP SB Single 5 100 FY11 Q2 FY12 Q48 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 9. DRAFT FY 13-15 Environmental Contracts A/E? CONTRACT TOTAL FEC CONTRACT TITLE FEDBIZ OPS (YES/NO) CP, FP, or SB or SINGLE or DURATION CAPACITY AWARD BOTH UB MAC (Yrs) ($M) DATE #REF!ML No ER program support NE IPT FP SB Single 3 4 FY12 Q2 FY12 Q2ML No Restoration (RAO-LTM-Services) HR IPT FP SB Single 5 4 FY12 Q2 FY12 Q3ML No Restoration (Construction Only) NE IPT FP SB MAC 5 50 FY12 Q1 FY12 Q4ML No Restoration (RAO-LTM-Services) NC IPT FP SB Single 3 4 FY12 Q1 FY12 Q4ML No Restoration (Range clearance, UXO) NC IPT FP SB Single 3 4 FY12 Q3 FY13 Q1ML No Environmental Analytical FP SB Single 3 4 FY12 Q4 FY13 Q2ML No Restoration (RAO-LTM-Services) NC IPT FP SB Single 5 4 FY13 Q1 FY13 Q3ML No Natural Resources - Wetland Management FP UB Single 5 5 FY13 Q1 FY13 Q3ML Yes Compliance (AST/UST) FP SB Single 5 4 FY13 Q1 FY13 Q3ML No Restoration (RAO-LTM-Services) NC IPT FP SB Single 5 4 FY13 Q1 FY13 Q4ML Yes Cultural Resources - Archaeology FP SB Single 5 3.5 FY13 Q2 FY13 Q4ML Yes Third Party Monitoring (asbestos/Pb/radon) FP SB Single 5 2 FY13 Q2 FY13 Q4ML No Range clearance, UXO NC IPT RC1 FP SB Single 5 4 FY13 Q2 FY13 Q4ML No ER program support NE IPT FP SB Single 5 4 FY13 Q3 FY14 Q1ML No Restoration (RAO-LTM-Services) NC IPT 1 FP SB Single 5 4 FY14 Q1 FY14 Q3ML No Range clearance, UXO NC IPT RC2 FP SB Single 5 4 FY14 Q2 FY14 Q3ML No Range clearance, UXO NC IPT RC3 FP SB Single 5 4 FY14 Q2 FY14 Q3ML No Restoration RAO-LTM Services NE IPT FP SB MAC 5 50 FY14 Q1 FY14 Q4ML No Restoration (RAO-LTM -Contruction) HR FP SB MAC 5 85 FY14 Q1 FY14 Q4ML No Restoration (RAO-LTM-Services) NC IPT 2 FP SB Single 5 4 FY14 Q3 FY14 Q4ML No Remediation Services and Corrective Action HR IPT FP SB Single 5 4 FY14 Q1 FY14 Q3ML No Restoration (RAO-LTM-Services) NC IPT 3 FP SB Single 5 4 FY15 Q1 FY15 Q3ML No Range clearance, UXO NC IPT RC4 FP SB Single 5 4 FY15 Q2 FY15 Q3ML No Restoration (RAO-LTM-Services) NC IPT 4 FP SB Single 5 4 FY15 Q3 FY15 Q49 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 10. Mid-Atlantic Summary • Robust facilities and environmental programs • Focus on safety • Employ full range of acquisition strategies – Small Business applicability reviewed for all acquisitions • Minimize contract cost & schedule growth • Jointly produce Quality, Best-value solutions in support of the Warfighter10 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 11. Mid-Atlantic Summary • Solicitation & Award Venues: – FEDBIZOP’s address – www.fbo.gov – NECO’s (Navy Electronic Commerce Online) address – www.neco.navy.mil – NAVFAC Portal under Business Opportunities address – www.navfac.navy.mil – POC: Acquisition Office, (757) 341-009811 NAVFAC MIDLANT - WORKLOAD PROJECTION
  • 12. Questions?12 NAVFAC MIDLANT - WORKLOAD PROJECTION

×