• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
MCB Camp Lejeune Energy Briefing
 

MCB Camp Lejeune Energy Briefing

on

  • 567 views

FEDCON Summit

FEDCON Summit

Statistics

Views

Total Views
567
Views on SlideShare
567
Embed Views
0

Actions

Likes
0
Downloads
6
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    MCB Camp Lejeune Energy Briefing MCB Camp Lejeune Energy Briefing Presentation Transcript

    • MCB CAMP LEJEUNE MCAS NEW RIVER ENERGY PROGRAMOCTOBER 2012 UPDATE
    • FEDERAL GOALS / REQTSI. PRIMARY GOALS: - 30% Reduction of Energy Intensity by 2015 (2003 BL) - Advanced Metering of Federal Facilities by 2012 - Energy Audits Completed Annually on 25% of Facilities - 26% Reduction of Water Usage by 2020 (2007 BL)II. OTHER GOALS - New Construction Designed to 30% Below ASHRAE 90.1 - Produce 25% of Energy from Renewables by 2025 - Facilities Designed for Net-Zero Energy Usage in 2020 - Reduce Fossil Fuel Usage at Facilities 55% by 2010; 100% by 2030 - + Many More…
    • PROJECTSI. STEAM DECENTRALIZATION A. MCAS NEW RIVER / CAMP JOHNSON - AWARDED WHITING TURNER B. 24 H-STYLE BLDGS - AWARDED NORTH STATE MECH C. CAMP GEIGER – RFP RELEASED – NAVFAC D/B MACC D. 18 BLDGS - HVAC / DHW UPGRADES – D/B/B - AQ TBD E. 14 BLDGS - FRENCH CK BEQs - D/B/B - AQ TBD F. 31 BLDGS - COURTHOUSE BAY – D/B/B - AQ TBD G. 160 BLDGS - HADNOT PT / FRENCH CK
    • PROJECTSII. BEQ RENOVATIONSIII. INTERIOR LIGHTING SYSTEMSIV. HVAC CONTROLSV. LED STREET LIGHTINGVI. ENERGY AUDITS