Your SlideShare is downloading. ×
0
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
FORT BRAGG
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

FORT BRAGG

693

Published on

FEDCON Summit

FEDCON Summit

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
693
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
18
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. NCMBC FEDCON Summit 2012
  • 2. Army Facility Investment Strategy• Sustain Required Facilities• Dispose of Excess Facilities• Improve Existing Facility Quality (O&M R&M and MILCON)• Build-out Critical Facility Shortfalls (MILCON) • Ranges • Organizational Vehicle Maintenance Facilities • Reserve Component Readiness Facilities • Other non-focus investment needs
  • 3. SRM Program 200 180 160 140$Million 120 100 80 60 40 20 0 Program Highlights: • Funding Based on FSM • Building Renovation/Construction • Energy Efficiencies • HVAC/Electrical Upgrades • Plumbing Repair • Paving, Paving, Paving • Roofing
  • 4. Energy ProgramFY13• ECIP Renewable Transpired Solar Collector Heating and DDC Conversion, JSOC• Retro-Commission multiple buildings on PAAF• Ground Source Heat Pumps (GSHP) in Historical area• Thermal Energy Storage at 3 locationsFY14• Retro-Commission multiple buildings on the installation• Expand GSHP in Historical area and HVAC upgrades• Micro grid projects at Central Plants• Small scale renewable energy projectsFY15• Retro-Commission multiple buildings on the installation• Small scale renewable energy projects
  • 5. MILCON Program $700 $632 $600 $499 $500 $459 $438 $406$Million $400 $337 $300 $246 • Roads $211 $208 • Motor Pools $200 $183 $176 $171 $151 • Fitness Centers • Ranges $100 $20 $0 FY5 FY6 FY7 FY8 FY9 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
  • 6. Partners• Picerne Military Housing http://www.braggpicerne.com/• Sandhills Utility Service http://www.sandhillsutility.com/• Old North Utility Service http://www.asusinc.com/our- subsidiaries/old-north-utility-services-onus/about-onus.htm• Honeywell http://honeywell.com/Pages/Home.aspx
  • 7. Savannah MATOC/SATOCs• Picerne Military Housing http://www.braggpicerne.com/• Sandhills Utility Service http://www.sandhillsutility.com/• Old North Utility Service http://www.asusinc.com/our- subsidiaries/old-north-utility-services-onus/about-onus.htm• Honeywell http://honeywell.com/Pages/Home.aspx
  • 8. Fort Bragg MICC MATOCALLIANCE BUILDING GROUP ALUTIQ MANUFACTURING CONTRACTORS, LLC.CHARLOTTE, NC HUNTSVILLE, ALPOC: MICHAEL RICHTER POC: MATTHEW DAGGETTW91247-11-D-0018 W91247-11-D-0024CONTRACT & PURCHASING SOLUTIONS, INC CHAVIS’ INCORPORATEDMAXTON, NC LAKE PARK, GAPOC: FITZGERALD CHAVIS POC: L. H. LEE CORBETT, JRW91247-11-D-0020 W91247-11-D-0019DIVERSIFIED MECHANICAL, LIMITED FUTURENET GROUP, INCOPORATEDDURHAM, NC DETROIT, MIPOC: J. DUBE PUTZ POC: PERRY MEHTAW91247-11-D-0021 W91247-11-D-0022OTAK GROUP, INCORPORATEDYULEE, FLPOC: AARON T. KATOW91247-11-D-0023
  • 9. Savannah MATOC/SATOCs Contract Title ContractorsW912HN-09-D-0045 Fort Bragg Paving Barnhill Contracting CompanyW912HN-09-X-0018 GA MATOC Brantley/Leebcor/TEAM/Triune Beck/TylerW912HN-09-X-0075 SC MATOC Lifecycle/Garbutt/GSCW912HN-09-X-0057 NC MATOC Chavis/Jarrett/Trend/Rand/LifecycleW912HN-10-D-0041 South Carolina SATOC WindamirW912HN-11-D-0017 Fort Bragg Roofing CEBCO Construction, Inc.W912HN-11-D-0043 NC/SC SATOC Boykin Contracting, Inc.W912HN-12-D-0026 Ft Bragg Paving TrendW912HN-12-D-0030 Ft Gordon SATOC Trend
  • 10. Savannah MATOC/SATOCs Contract Title Project Award DateW912HN-11-R-0046 Ft Benning SATOC Oct 12W912HN-12-R-0009 Ft Stewart SATOC Oct 12W912HN-12-R-0026 82ND SATOC Feb 13W912HN-12-R-0035 GA SATOC Apr 13 Ft Bragg Paving Apr 13 UMCS & Mech Control MATOC Aug 13
  • 11. TO JOIN THE FORT BRAGG TEAM

×