Risk Reduction Through Emergency    PreparednessA Hurricane Tested Solution         Steve Hoffman           Doug Gray
Natural Disasters Occur2                              mdh-050717_4jc2ng
Are You Prepared?3                        mdh-050717_4jc2ng
Spacecraft Services4                 People, Facilities, Flight Hardware   mdh-050717_4jc2ng
Spacecraft ProcessingHubble Revisit                                      Node 2 and JEM                        S0 Truss   ...
Emergency Preparedness    Publish Two Unique Plans – Updated Annually    • Emergency Preparedness Plan (EPP)     • Hurrica...
Emergency Preparedness     EPP/HPP Contents      • Program Level Preparation Based Upon Timeliness of Event        • Torna...
Emergency Preparedness     EPP/HPP Contents      • Scripted Scenarios to Immediately Deal with Event      • Preparations  ...
Area Map – Florida Space Coast                                   Shuttle Launch Complex                                   ...
2004 Hurricane Season10                    A Season to Never Forget   mdh-050717_4jc2ng
2004 Effects on KSC11           Extensive On Site Damage & Off Site Infrastructure   mdh-050717_4jc2ng
2004 Effects on KSC      Hurricane Charley       • 24 Hours Out Appeared to be No Threat       • Turned and Impacted Numer...
Lessons Learned      Preparation       • Had Established 1-800 Call in Numbers to Facilitate Comm Before,         During a...
Lessons Learned                                                         Scenario      Specific Example                    ...
Forward Work      Katrina 2005 Lessons Learned       • Even Greater Devastation to NASA Center (Michoud)       • Employees...
Post Storm Reflection      What We Thought       • Rock Solid Plan for Dealing With Any Circumstance      What We Discover...
Questions & Answers?
Thank You
Upcoming SlideShare
Loading in …5
×

Steve.hoffman

13,666
-1

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
13,666
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Steve.hoffman

  1. 1. Risk Reduction Through Emergency PreparednessA Hurricane Tested Solution Steve Hoffman Doug Gray
  2. 2. Natural Disasters Occur2 mdh-050717_4jc2ng
  3. 3. Are You Prepared?3 mdh-050717_4jc2ng
  4. 4. Spacecraft Services4 People, Facilities, Flight Hardware mdh-050717_4jc2ng
  5. 5. Spacecraft ProcessingHubble Revisit Node 2 and JEM S0 Truss MRO HRF 5 International Assets mdh-050717_4jc2ng
  6. 6. Emergency Preparedness Publish Two Unique Plans – Updated Annually • Emergency Preparedness Plan (EPP) • Hurricane Preparedness Plan (HPP) • Loss of Utilities • 100% Focus on Hurricanes • Severe Weather/Tornado • Broke out from EPP in 2006 • Freeze Condition (Lessons Learned) • Commodity Leak • Fire • Civil Disturbance • Nuclear, Biological or Chemical Agent Release • Sabotage/Bomb Threat • Inadvertent Space/Missile Impact6 Planning is Critical mdh-050717_4jc2ng
  7. 7. Emergency Preparedness EPP/HPP Contents • Program Level Preparation Based Upon Timeliness of Event • Tornado Warning versus Watch • Adverse Weather – Different Levels Require Different Preps – Phase 1 versus Phase 2 • Hurricanes – Preparation Based upon Estimated Time of Landfall • Numerous Require Immediate Action • Individual Level Preparation Based Upon Timeliness of Event • Same as above7 Severity and Timing Dictates Planning mdh-050717_4jc2ng
  8. 8. Emergency Preparedness EPP/HPP Contents • Scripted Scenarios to Immediately Deal with Event • Preparations • Employees • Flight Hardware • Facility • Equipment/Vehicles/Computers • Communications (Internal & External) • Establish Program Comm Plan/Regular Tagups • Activate Local Operations Center & Boeing EOC • Finalize Ride Out Crew for Hurricanes • Organize Damage Assessment & Recovery Team (DART)8 Details…Details…Details mdh-050717_4jc2ng
  9. 9. Area Map – Florida Space Coast Shuttle Launch Complex KSC Industrial Area • Space Station Processing Facility • Operations & Checkout Building • Multi-Purpose Processing Facility International Space Research Park TM SPACEHAB Payload Processing Facility (SPPF) Port Canaveral & Intracoastal Waterway Boeing Building 100 Space Coast Regional Airport9 Protecting Space Coast Assets mdh-050717_4jc2ng
  10. 10. 2004 Hurricane Season10 A Season to Never Forget mdh-050717_4jc2ng
  11. 11. 2004 Effects on KSC11 Extensive On Site Damage & Off Site Infrastructure mdh-050717_4jc2ng
  12. 12. 2004 Effects on KSC Hurricane Charley • 24 Hours Out Appeared to be No Threat • Turned and Impacted Numerous Employees Hurricane Frances • Braced for a Direct Hit/Landfall 75 miles South • Shut Down KSC for 5 days • Numerous Lessons Learned Primarily on Aftermath Communication Hurricane Jeanne • Forecasted to Stay East and Pose No Threat • Almost Identical Landfall Location as Frances • Better Prepared Based Upon Frances Lessons Learned • Continued Damage Started by Frances12 Each Situation is Unique mdh-050717_4jc2ng
  13. 13. Lessons Learned Preparation • Had Established 1-800 Call in Numbers to Facilitate Comm Before, During and After Storms, Required Better Structure • Moved Critical Flight Hardware To Safer Location • Identify Critical Skills Prior to Storm in Case of Major Event to Expedite Reestablishment of Critical Systems/Functions Post Storm • Cell Phones were Inoperable – Acquired Satellite Phones for Key Personnel • Personnel Accountability was Not Thorough Enough – Established Method to Communication, but no Guidelines on what to do if we Could Not Make Contact • Backed Up Servers, but Kept all IT Equipment Resident at Site13 Employees Are Your Most Valuable Asset mdh-050717_4jc2ng
  14. 14. Lessons Learned Scenario Specific Example Activation • Dialogic • Establishes Pre-Determined Scenarios to Communicate With All Employees • Locates Them Based Upon Pre-Loaded Telephone Numbers to Assure They are Safe Post Storm • Communicates a Programmed Message from Program Manager to Assure They Have the Latest Information/Plan • Assures Consistent Timely Information • Reports Let Manager Know That All are Accounted For or Where to Target Help Needed14 Communication is the Key mdh-050717_4jc2ng
  15. 15. Forward Work Katrina 2005 Lessons Learned • Even Greater Devastation to NASA Center (Michoud) • Employees Who Were Left Homeless • Numerous Lessons Learned Incorporated into Our Plan, Several We are Still Working on • Pre-Purchase of Blocks of Rooms for Employees • Pre-Leased Facility in Case of Inoperability • Fresh Water Well – Tower With 1 Million Gallon Capacity • IT Equipment Procurement – Off Site • Mobile Emergency Ops Center Mobile Emergency Ops Center15 Always Opportunities For Improvement mdh-050717_4jc2ng
  16. 16. Post Storm Reflection What We Thought • Rock Solid Plan for Dealing With Any Circumstance What We Discovered • No Matter How Many Times You Simulate an Emergency • No Simulation or Dry Run is Truly Like the Real Thing! • Over 100 Lessons Learned – Incorporated into Current Plan Capitalize on Others Experiences & Lessons Learned Without Having To Experience It First Hand16 Don’t Learn The Hard Way mdh-050717_4jc2ng