• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Linda maleki
 

Linda maleki

on

  • 10,364 views

 

Statistics

Views

Total Views
10,364
Views on SlideShare
10,364
Embed Views
0

Actions

Likes
0
Downloads
29
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • We are the organization that develops IT Projects. To provide "IT that matters" and keep pace with the dramatically changing world of information technology, we created several offices within the OCIO that provide strategic planning and governance, encourage the adoption of new technologies, and foster communication with both internal customers and external partners. The OCIO mission is to make a significant, measurable contribution to JPL’s mission success by: Supporting the Laboratory in meeting its goals - The OCIO is here to help the Lab successfully reach its goals by providing IT services, solutions, and expertise. Serving the diverse IT needs of the varied JPL communities One size does not fit all. JPL’s diverse communities need a variety of IT solutions that are tailored to meet particular needs. Infusing the right technologies at the right time Track technologies that have potential for JPL, adopt those that provide benefit, and time the adoption to maximize value. In the end, we want the OCIO to be JPL’s valued and preferred information technology partner, delivering reliable, cost-effective, quality services and solutions.
  • Utilizing the JUMP FrameworkImplementing BuildIT to Keep Projects on TrackConversion of Templates to Online FormsMeasuring Success with Metrics and Best Practices
  • We knew it was important to know what was going on with our projects.Before BuildIT, we did not know the duration of a project and how long it took.
  • RUP is an iterative software development process framework. RUP is not a single concrete process, but rather an adaptable process framework, intended to be tailored by the development organizations and project teams.Describe Iterative processInception: Create excitement for implementing this project. Objectives are stated clearly, high level requirements, and resource estimates. Elaboration: Flesh out the details. An analysis is done to determine what it will take to achieve vision. SRD, Project Plan, choice of architecture, and resources are determined. Construction: Build it. Emphasizes managing resources and controlling operations to optimize costs, schedules, & quality. Implementation plan, test plans, and Release Notes. Transition: Hand off to Operations. Lessons Learned, education, deployment, configuration, and support.Describe end of Phase Reviews
  • BuildIT is built using 99% COTS Minor customizations were done for the metrics Page and rollupCost EffectivenessWe knew that we didn’t have enough funds for a huge investment in the systemWe leveraged our existing Sharepoint infrastructureMike, our Section Manager, built it in less than two weeksNo coding was involved because we used the out of the box capabilitiesOur advanced metrics and rollups took one week to developIt was cheap, easy, quick and provided value to our customers
  • How do we know what aspects of the project are important? How do we know what we should track?The ITIL lifecycle will assume the following processes have been addressed in the project planService Catalog ManagementThat the Service Pipeline, the Architecture Portfolio, and the Technology Portfolios have been updatedService Level ManagementThat the non-functional requirements have captured any requirements or expectations of the customers and stakeholders. An SLA can be derived from these requirementsSupplier ManagementPlans for vendor and supplier interfaces have been identifiedIT Security ManagementIT Security has verified that the project is compliantLastly, that Operations is aware of any constraints and able to provide sufficient support for the followingCapacity Management, Availability Management, and IT Service Continuity Management
  • Now that we’ve taught the concept, we needed to teach the vocabulary behind the processSocial Engineering - For both Process and Toolset. We educated people on why we are doing what we were doingAll artifacts need to be completed, approved, and uploaded to BuildIT before entering the next phase.Need to incorporate this process into the existing culture. Resistance from many Project Managers who were used to not following a standard process and for considering this as a “barrier” for their project and stakeholders.
  • A Project Status Report should be also be know as an “Action” reportIt should bring the spotlight onto the issues the project team wants to focus on. Management is interested in: 1. What are any major new issues and what you doing about it? 2. Are there an action items or milestones due or overdue?3. What are your next steps for the next reporting period?
  • Each Project has their own collaboration site to track all of their artifacts for each phase, other features are also available such as an Issues List, Checklists, Memberships, Risks, and To-Do Action Tasks.Purpose: Monitor and Respond to Project Issues
  • The Anatomy of BuildIT has Numerous Features that all Integrate EffectivelyRecommendation for Action (RFA):Purpose: Monitor and Respond to Project IssuesWorks like a Specialized To-Do ListUsed to monitor RFAs, Customer Issues, and other problemsChecklistRequired and Optional JUMP Phase RequirementsThis checklist not only shows the required JUMP tasks, but works as an assignment sheet, notebook, and status list as well.Performance Indicators are generated based on the status of the items on this list
  • Each Position was approved by the Technology Committee/Working Group and has metadata including description, status (Core), benefits, usage, etc.What is our Program position on Technology?
  • This was the first Word template that was automated and Project Managers were especially excited about this because they could create a plan in draft or concept state.For the Inception plan, you define your vision, objective, scope and boundaries, your Project Sponsor and Stakeholders, Success Criteria, Features, and Solution Estimates.
  • UX Experience is a review board charged with reviewing and grading both application and web site interfaces during the development cycle.User Experience includes the User Interfaces of the software tools. It also includes the design of any technical interactions with the customers, sponsors, stakeholders, and users within the scope of the product.UX will ensure that the new Re-BuildIT will be reliable, intuitive, and maintainable user experience across all IT applications.In order to implement IT Applications as efficiently and effectively as possible, it is necessary to set UI standards and underlying architecture that developers can follow in creating their applications.
  • JUMPIT is integrated with BuildIT.Multiple mandatory training sessions were conducted for users across the organization.There are many features on BuildIT and training users on the different modules should be done in phasesTraining gives Project Managers a Better Understanding of the Process & the Tools4 training classes: Overview, Phase Specific, Navigation, Reviews and Scorecards
  • We wanted to simply display various details of a project and whether or not they needed attention BuildIT provided us with these means. We were able to identify projects that were not on track As a lessons learned it was crucial that we received Management support
  • Metrics provided to CIO are valuable
  • Work with the Project Managers to ensure that the JUMP process is followed, artifacts are delivered, and signed off prior to their phase reviewsAudit projects for compliance and manages the Waiver processThe Review Board Chair during project reviews and gathers RFAs and ScorecardsHelps Project Managers walk through the tools, process, and benefits while enforcing policies and proceduresShort DescriptionPerson who uses the IT services on a day to day basis. Users are distinct from the customer as some customers do not directly interface with the system.DeliverablesRelease documents, waivers, schedules project reviews, updates CMDB, communications, and status reports.ResponsibilitiesWork with the Project Managers to ensure that the JUMP process is followed, that artifacts are delivered, and signed off prior to their phase reviews. Manages the Development Pipeline and other aspects of the CMDB (configuration management data base). Is the Review Board Chair during reviews and gathers RFAs and Scorecards to post on the project site. Distributes review materials and gathers signatures for artifacts. Manages the RFA process and post materials in the official Document repository (PDMS).Conducts JUMP training for Project Managers and usersAuthoritiesAudit projects for compliance, signoff for every phase and waivers. Authority to allow/deny or schedule reviews.Authority to move the project from one phase to the nextSummaryThe main point of contact for all JUMP process related questions and issuesHas the expertise and authority to coordinate all projects with the software development process
  • Interviews were conducted with Project ManagersMetrics were captured to find out the duration that it took for each phase to be completedA case study was also performed to determine the amount of time and budget spent using BuildITDivision 31 – same code base, one followed process and one did not. More done, less errorsNeed to incorporate this process into the existing culture. Resistance from many Project Managers who were used to not following a standard process and for considering this as a “barrier” for their project and stakeholders.There was an assumption that there was overhead, once the Project Managers used the tool, they realized that the project didn’t take longer than expected.
  • [show screenshot of what PMs find useful]
  • Metrics reveal how many days each project remains in each phaseMetrics can track budget allocations and actual costs[show example]
  • Projects had five minute weekly status reports. A Project Manager can quickly go in the tool and update their progress. We are able to pull up critical projects list and risks.If you don’t know what you are responsible for, you won’t know what to do. We defined roles and responsibilities the process and toolsetUX site- user experience and review process. Review of Graphical User Interfaces during the early stages of development to make sure it is aesthetically pleasing to the human eyesWe were excited to take our Inception Plan Word Document and automate it. The users could easily step through each area and fill in the necessary information. Often, Project Managers chose to present their Inception Review directly from the online Inception Tool.
  • We need a balance for bothHave an open forum at our Weekly Project Status meeting to gather feedbackReceived positive feedback from First Time users and others who use the system
  • All online forms will have the capability to be converted to a MS Word document and/or Powerpoint presentation.All core metadata on the Inception Plan are entered once for the online form. Other required online forms such as the SRD and Project Plan can select the core metadata from the list instead of enter the same information again.Total Time spend in Inception Phase should be no longer than 2 weeks.No redundant data entry
  • Purpose: Track major schedule and delivery milestonesThis list serves as a simple project schedule. A more detailed MS Project schedule is also provided as a template.The provided schedule already includes all required (and many optional) JUMP milestones – a turn-key project schedule!Projects tracks their own schedule on their respective siteThere will be a centralized rollup schedule of all project deliverables and milestonesManagement will have the ability to view the Master Schedule to determine the progress of each project
  • Part 1: OCIO identified a need for tracking projects and we were able to implement a low cost solution called BuildIT leveraging existing infrastructure.Part 2: Have a centralized collaboration site to track all of their information from document files, risks, action items, RFA’s, and weekly status reports.Part 3: All of the paper based documentation will be automated, there will be improved navigation, as well as Microsoft Project Server integration. The Scorecards will also be captured online.

Linda maleki Linda maleki Presentation Transcript

  • Building a Cost Effective Portfolio Management System…Yes You Can! Presented By: Linda Maleki and Cindy Trinh Jet Propulsion Laboratory, California Institute of Technology NASA PM Challenge February 22, 2012Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does notconstitute or imply its endorsement by the United States Government or the Jet Propulsion Laboratory, California Institute of Technology. Copyright 2011 California Institute of Technology. Government sponsorship acknowledged.
  • We are JPL’s OCIO Support the Laboratory in meeting its goals Infuse theServe thediverse IT OCIO right technologiesneeds of JPL Vision at the right time Offer compelling service alternatives 2
  • 3
  • 4
  • 5
  • 6
  • Key Points Implementing OCIO needed BuildIT has kept We’ve only justvisibility into all Projects on begun IT projects track
  • How many IT projects are going on right now?Are projects on time? What is the true cost for project deliveries?How can we help? 8
  • 9
  • OCIO Process Derived from RUP and tailored to JPL NeedsInception Elaboration Construction TransitionProject Software Implementation LessonsVision & Plan Learned Requirements &Scope BusinessMajor Processes TrainingFeatures Development Deployment Configuration High Level Project Plan Budget & Schedule Test Plans 10
  • Phase Reviews Providethe Mechanism to Control the Process 11
  • Scorecards ProvideObjective Approval and Commitment Scorecards are what count! 12
  • 13
  • BuildIT was Built on an Internal Platform Enabling Re-Use
  • Key Capabilities were Based on PMI & ITIL Recommendations
  • Project Managers and Team Members Speak the Same Language Need to Must Standard teach the practice terminologyvocabulary effective is used andbehind the Change artifacts are process Management consistent
  • Project Action Reports: The Basic Data for BuildIT What are your next steps for the next reporting period?Are thereany action items ormilestones due oroverdue? What are any major new issues and what are you doing about it? 17
  • Tracking Mechanisms Enable Weekly Status Reporting
  • Standard Project Sites Organize Project Artifacts
  • Tools areprovided togatherideas, brainstorm, document RFA’sand meetchecklistitems
  • BuildIT Tools: Risk List• Catalog and Track all identified project risks and mitigations.• All standard risk information are tracked on the BuildIT Project site 21
  • BuildIT Tools: Document Tracking• Track and Control Project Documentation• Directory Structure consistent across all sites• Integrates with Office Applications• Full workflow and reporting capability 22
  • BuildIT Tools: Technology Positions 23
  • The Inception Plan was the First Automated Online Form 24
  • User Experience Group Reviews all Applicationsand Web Sites
  • Training Materials are Integrated into BuildIT
  • 27
  • CIO Deputy Portfolio CIO Manager PMO ProjectManagers 28
  • CIO Required that All Projects beRegistered on the Development Pipeline
  • Establish a Process and BuildIT Coordinator Walk the Expedites users the JUMP through the Process tool Audit projects for compliance Full Project and Process Support
  • 31
  • False Assumptions were made thatBuildIT takes longer for the Project Lifecycle
  • 33
  • BuildIT Site is Accessible to Management
  • Visual Metrics Reporting Gives Management the Big Picture 35
  • 2006 2008Project BuildITChaos Online 2007 2012 JUMP Re-BuildIT Established 36
  • Our Main Goals Were Achieved Pipeline, weekly status Roles, responsibilities, andupdates, and metrics tools technology position were developed statements were defined Accomplishments UX Experience working Automated first online form group established
  • 38
  • “Before we had BuildIT, it was almost impossibleto know the status of all of the projects we were working on. A week after BuildIT went Live, we knew we had 35 active projects and we knew which ones needed help.” -Michael Stefanini, JUMP Process Owner, Section Manager of IT Project Management and Application Development 39
  • BuildIT Feedback for Continuous Improvement Performed ongoing assessments with users Provide upperDeveloped managementspecialized with Affinity meaningful Groups metrics
  • 41
  • 42
  • We Would Like to Convert allWord Templates to Online Forms 43
  • Integration with MS Project will make aMaster Rollup of all Projects more Visible 44
  • Summary ImplementingOCIO needed BuildIT has kept We’ve only justvisibility into all Projects on begun IT projects track