A Project Management Toolkit for       Space Flight Projects               Vincent J. Bilardo, Jr.                      Ch...
Integrated Vision for Program/Project Management & Execution                 (PPME) Excellence at NASA Glenn Research Cent...
The PPME Toolkit is a web-                                       based one-stop working                                   ...
The Toolkit aims to bring GRC-                                       level Process Requirements                           ...
Current Version 1 CapabilityGlenn Research Center at Lewis Field   http://pmtoolkit.grc.nasa.gov
Standardized Project Planning Approach                                                                        WBS: X      ...
From 1.2 A                     Screen 1.2 B                                       Run Case                                ...
Summary         • PPME Toolkit v1 successfully developed via rapid           prototyping design approach in 2010.         ...
Upcoming SlideShare
Loading in...5
×

Bilardo.vince

14,179

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
14,179
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Bilardo.vince"

  1. 1. A Project Management Toolkit for Space Flight Projects Vincent J. Bilardo, Jr. Chief of Program Planning and Control Office, NASA GRC Gary L. Crawford, Sr. PPME Toolkit Project Manager, NASA GRCGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  2. 2. Integrated Vision for Program/Project Management & Execution (PPME) Excellence at NASA Glenn Research Center GRC Center Governance Established Structure Operating Rigorous Cadence Processes (Monthly Reviews, PPBE, Milestone (GLPR, GLWI, Calendar) HBK, etc) Space Flight Systems Portfolio Execution Metrics Standardized (EVM, Budget Tools Execution, (PPME Toolkit) Procurement Execution, etc) Trained Proficient Staff Focus of this (PMs, Resource Analysts, Schedulers) presentationGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  3. 3. The PPME Toolkit is a web- based one-stop working environment developed to facilitate rigorous, compliant, life cycle-based: - Proposal Development - Project Planning - Project Execution - Project Control & ReportingGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  4. 4. The Toolkit aims to bring GRC- level Process Requirements (GLPRs) “to life” by pulling the content out of the document and serving up the process flows and templates via a mouse click.Glenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  5. 5. Current Version 1 CapabilityGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  6. 6. Standardized Project Planning Approach WBS: X Level 0 Top Level Products / Milestones WBS: X.Y Level 1 Cost Accounts / Control Points Project Team (assignment of Cost Account Builds Managers - CAMs) Resource WBS: X.Y.Z Loaded Schedule Level 2 Work / Planning Packages (CAMs from M, D, F, R, Q, WBS: X.Y.Z.A etc.) Level 3 Task / Activities Performing WBS: Organizations X.Y.Z.A.B Define Detailed Level 4 Staffing Assignments Staffing PlanGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  7. 7. From 1.2 A Screen 1.2 B Run Case EVM Plan Review / Revise Case Tool Earned Tool Metric September Macro Value Plan .xlw 3.5.4 Run PRD Prepare Internal Customer September Macro Agreement (ICA) 3.5.4 Review / Revise online Project Loaded PRD Requirements Document (PRD) Online Database Run Phasing Review / Revise Phasing Plan September Plan Worksheet Macro 3.3.6, 3.3.9 Review / Approve Begin Project October at PRB Execution 3.3.7 Loaded PMT OCFO Load Agency Program Phasing Plans PMT Load per Management Tool (PMT) Agency Call Online DatabaseFuture Version 2 CapabilityGlenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov
  8. 8. Summary • PPME Toolkit v1 successfully developed via rapid prototyping design approach in 2010. • Early Adopters Pilot Study conducted with five active GRC Space Flight Projects. • Key findings being incorporated into requirements and design of v2 for implementation in 2011. • Forward Plan: • Deploy v1 across GRC Space Flight portfolio in 2011 with goal of 90% of projects captured by 30-Sep- 2011. • Develop and pilot v2 including Microsoft Server Enterprise solution to enable true portfolio management.Glenn Research Center at Lewis Field http://pmtoolkit.grc.nasa.gov