Department of Computer Science        Sir Syed University of Engineering & Technology, Karachi              Final Year Pro...
Department of Computer Science                  Sir Syed University of Engineering & Technology, Karachi                  ...
Upcoming SlideShare
Loading in...5
×

Fyp timeline & assessment policy batch 2009

475

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
475
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Fyp timeline & assessment policy batch 2009

  1. 1. Department of Computer Science Sir Syed University of Engineering & Technology, Karachi Final Year Projects (FYP) Project Timeline for BS (CS) – Batch 2009 Saturday1. Submission of Project Registration Form 25/02/12 Saturday2. Submission of Project Proposal 3/03/12 Saturday3. Project Proposal Defense 10/03/12 Saturday4. Submission of Requirements Analysis Documents 17/03/125. Presentation of Requirements Analysis (exact 7/04/12 -- schedule for each group will be announced later) 10/04/126. Monday Submission of Design Documents 23/07/12 Monday7. Poster Presentation 30/07/128. Project Progress Review and Peer Evaluation (exact 22/10/12 -- schedule for each group will be announced later) 24/10/129. Submission of Project Report (exact schedule for 1st Week of each group will be announced later) January 201310. Project Presentation + Viva (exact schedule for each 2nd Week of group will be announced later) January 2013 Naheed Khan FYPC Coordinator
  2. 2. Department of Computer Science Sir Syed University of Engineering & Technology, Karachi Final Year Projects (FYP) Assessment Policy for BS (CS) – Batch 2009 Evaluation TotalS.NO. PROJECT ACTIVITY Supervisor Committee MARKS Requirements Analysis Document + 1. 10 10 20 Presentation 2. Design Document 35 - 35 3. Poster Presentation - 35 35 4. Formal Technical Review 20 20 40 Final Project Report, Presentation, 5. - 70 70 Demo, Viva Grand Total 65 135 200 Naheed Khan FYPC Coordinator

×